Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Replace existing forced air furnace and comfort cooling with 100k btu 98. 6% furnace and 4 ton 17 seer 2- stage air conditioner located in basement. Date: August 12, 2013 Contractor: Carroll Mechanical Services Client: Michael Rapport,Gail Rapport | Applicant: Carroll Mechanical Services | Permit type: Mechanical | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Installation of a replacement gas fired, 65 gallon water heater. Install thermal expansion devise, service outlet and carbon monoxide detector(s) per code. Date: December 17, 2013 Contractor: Precise Plumbing Inc Client: Michael Rapport,Gail Rapport | Applicant: Precise Plumbing Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: April 28, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 4. 94 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Jennifer Plass | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 9, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-05152 | |||||
SCORE 100 Replace existing forced air furnace and comfort cooling with 100k btu 98. 6% furnace and 4 ton 17 seer 2- stage air conditioner located in basement. Client: Michael Rapport | Permit type: Mechanical | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03929 | |||||
SCORE 95 Installation of a replacement gas fired, 65 gallon water heater. Install thermal expansion devise, service outlet and carbon monoxide detector(s) per code. Client: Michael Rapport | Permit type: Mechanical | Permit status: Cmp | Completion date: April 28, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-07075 |