Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install new wood pole to serve 603 dewey and remove loop going over 611 dewey. Date: August 1, 2005 Contractor: Xcel Energy Client: Bruce Poulter,Marcela Poulter | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Install space heater in downstairs area of duplex Date: January 3, 2000 Contractor: Meyers Heating And A C Client: Mary Forrest | Applicant: Meyers Heating And A/c | Permit type: Mechanical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Single family a | |||||
Install new wood pole to serve 603 dewey and remove loop going over 611 dewey. Date: August 1, 2005 Client: Bruce Poulter | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2005-02978 | |||||
SCORE 95 Install space heater in downstairs area of duplex Client: Mary Forrest | Permit type: Mechanical | Permit status: Cmp | Completion date: May 26, 2000 | Current use: Single family attached dwelling, existin | Permit id: Pmt2000-00129 | |||||
SCORE 100 Installation of a new, flush-mounted, grid-tied, 5. 52 kw photovoltaic system on an existing single-family dwelling. Installation per independent power systems engineerfoots specifications. No structural reinforcement proposed. Approval is for principle structure only. Client: Russell Forrest | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-04280 |