SCORE 95 Connect 5619 1st place, n. W. With underground service by building 32 of service conduit also install bends; sidewalk of 1st place south of madison street, n. W. As indicated on the attached prints. Wr #3361198 cut #27041 tcp #3 (sjp) Date: May 23, 2011 Contractor: Pepco Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: September 28, 2011 | Permit id: Pa62644 | |||||
SCORE 95 Connect 5619 1st place, n. W. With underground service by building 32 of service conduit also install bends; sidewalk of 1st place south of madison street, n. W. Wr #3361198 cut #27041 tcp #3 stephen j park (202) 388-2573 sjpark@pepco. Com this construction permit requires a separate occupancy permit. The attached plans and conditions are apart of this permit. If steel plates are used at this job site an additional permit is needed. Date: November 15, 2011 Contractor: Pepco Permit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: June 1, 2012 | Permit id: Pa67306 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: March 30, 2012 | Permit id: 0 | |||||
SCORE 95 Excavation; electric connection (trench) Date: August 9, 2011 Contractor: Pepco Permit status: 8 | Expiration date: September 28, 2011 | Permit id: Pa62644 | |||||
SCORE 95 Construction staging area Contractor: Pepco Holdings Inc Permit status: Notpaid | Expiration date: March 30, 2012 | Permit id: 0 | |||||
SCORE 82 Dccr proposes to drill one geotechnical boring (rcagi-24) located in the northbound parking lane of 1st place nw (5619 1st pl nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schematics for additional infor Date: October 16, 2015 Contractor: Salut Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117662 | |||||
SCORE 79 Construction staging area Date: November 6, 2015 Contractor: Mark Fletcher Salut, Inc Permit status: Permit expired | Expiration date: December 9, 2015 | Permit id: Pa10218412 |