Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Main / basement duct system: install a duct system which has been properly designed using the "manual d" duct design method. This duct system will be designed to exceed the required 1,0 cfm of air flow, as required by the ac system. This duct system will evenly distribute air to the main level, and basement. 1 coleman "echelon" series - 98 % efficient modulating furnace 4,800. Cp9c furnace - 98% afue - 80,0 btu - variable capacity heating - variable speed 3 ton (dc) blower motor 1 coleman "echelon" series ac system - 16 seer- r410a 4,745. Ac6b air conditioner - 2. 5 ton cooling capacity ![]() ![]() Permit type: Mechanical | Permit status: Pass | Completion date: July 14, 2014 | Current use: Residential | Permit id: Bld2014-02677 | |||||
SCORE 59 Front steps railing ![]() ![]() Permit type: Historic landmark commission | Permit status: Closed | Completion date: July 21, 2016 | Current use: Minor alteration | Permit id: Plnhlc2016-0057 | |||||
SCORE 59 Historic landmark commission ![]() ![]() Permit status: Closed | Completion date: May 18, 2016 | Current use: Minor alteration | Permit id: Plnhlc2016-0036 | |||||
SCORE 59 Exterior footing foundation; shoring up porch ![]() ![]() Permit status: Closed | Completion date: July 26, 2016 | Current use: Residential | Permit id: Bld2016-04840 |