Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 3 new cooling units with condensors on roof, air handlers inside. Mechanical only this permit. Electrical work by separate permit already issued. (applicant has indicated that it was his understanding that there were no iecc requirements on additional cooling equipment on an existing system) Date: May 16, 2003 Contractor: Mtech Mechanical Technologies Client: Central Housing Co | Applicant: Mtech Mechanical Technologies | Permit type: Mechanical, flood no | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 100 Electrical permit for installation of three hvac units. Mechanical by separate permit. Date: April 7, 2003 Contractor: Core Electric Inc Client: Housing Central | Applicant: Core Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: May 14, 2003 | Current use: Service industr | |||||
SCORE 56 Fire sprinkler system Date: January 25, 2001 Contractor: Housing Central Client: Housing Central | Applicant: Housing Central | Permit type: Fire | Permit status: Cmp | Completion date: February 7, 2001 | Current use: Commercial/reta | |||||
SCORE 95 Interior tenant remodel. Client: Central Housing Co, Westview Press | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 9, 2001 | Current use: Office - profes | |||||
SCORE 97 Remove three gas meters, replace with a single meter. Date: November 7, 2000 Contractor: J D Plumbing Client: Central 5540.0 | Applicant: J D Plumbing | Permit type: Mechanical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Remodel of reception area Client: Housing Central | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 10, 2000 | Current use: Office - admini | |||||
SCORE 95 Interior remodel on main floor and second floor. Client: Housing Central | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Remodel and add shower, relocating ducts Client: Central 5540.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Mechanical permit to replace a 5 ton roof-top unit Date: March 8, 2007 Contractor: Mtech Mechanical Technologies Client: Central 5540.0 | Applicant: Mtech Mechanical Technologies | Permit type: Mechanical | Permit status: Cmp | Completion date: April 10, 2007 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of 18,466 sf. No new plumbing, reconfiguration of office & warehouse space. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2008 | Current use: Warehousing, te | |||||
SCORE 95 Building permit for the demolition of interior non-loadbearing partition cubicle walls on the 2nd floor of existing office space. 22,0 sf w associated minor electrical work. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 5, 2011 | Current use: Office - admini | |||||
SCORE 98 Service change to 16 amps. Date: September 11, 2007 Contractor: Broes Electric Client: Housing Industrial | Applicant: Broes Electric | Permit type: Electrical | Permit status: Cmp | Completion date: November 28, 2007 | Current use: Service industr | |||||
SCORE 95 Demolish existing sink and floor drains in warehouse area and remodel toilet rooms on first floor. 3 sf Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 25, 2008 | Current use: Office - profes | |||||
SCORE 95 Temporary electric power. Date: September 6, 2007 Contractor: Quinlan Construction Inc Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 12, 2007 | Current use: Single family d | |||||
SCORE 95 Remodel first floor bathrooms. Includes re-arrangement of walls, new fixtures, electrical, mechanical and plumbing work. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Warehousing, re | |||||
SCORE 95 Remodel 2nd floor including removal of interior walls and adjustment of bathrooms to comply with ada. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Office - techni | |||||
SCORE 95 Tap water for irrigation - separate irrigation meter from domestic Date: November 2, 2007 Contractor: Valley Excavating Inc Client: Housing Industrial | Applicant: Valley Excavating, Inc. | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 100 Scope of work letter raise existing main and branch lines Date: October 23, 2007 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2008 | Current use: Office - profes | |||||
SCORE 100 Scope of work letter change all heads from standard to quick response Date: October 23, 2007 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Demo two existing stair towers and replace with new stair towers and elevator shafts. Adding 1158 sf Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Office - techni | |||||
SCORE 100 Scope of work letter change 6 pendants to uprights Date: December 6, 2007 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cls | Current use: Office - techni | |||||
SCORE 100 Tennant finish sprinkler Date: January 23, 2008 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 3, 2008 | Current use: Office - profes | |||||
SCORE 99 Floodplain development permit associated with pmt2007-05081. Associated materials & documents received under a resubmittal for pmt2007-05081 Date: March 24, 2008 Contractor: Quinlan Construction Client: Housing Industrial | Applicant: Quinlan Construction | Permit type: Flood nonsubstantial | Permit status: Iss | |||||
SCORE 100 Scope of work letter Date: June 19, 2008 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 3, 2008 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm adding smoke and heat detectors for elevator recall Date: July 1, 2008 Contractor: Trident Security Systems Client: Housing Industrial | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Office - profes | |||||
SCORE 100 Scope of work letter droplet measurement technologies Date: July 17, 2008 Contractor: Fire Defense Inc Client: Central 5540.0 | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Research & deve | |||||
SCORE 95 Installation of 60" of upper & lower cabinets and a small sink & water line to create a coffee bar area in the excel energy offices. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, plumbing | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel for xcell outsourcing. 11 sf, removal of demising walls and associated electrical and mechanical. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Manufacturing, | |||||
SCORE 100 Scope of work letter raise branch line and relocate 2 spinklers Date: October 29, 2008 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Tenant remodel to create three offices (total area of 25 sf) in the south wing of 2nd floor -- suite number unknown. Includes minor electrical & mechanical -- no plumbing. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 8, 2009 | Current use: Research & deve | |||||
SCORE 95 Installation of two hand sinks and a coffee bar on the 2nd floor -- south wing. Date: May 4, 2009 Contractor: Quinlan Construction Inc Client: Housing Industrial | Applicant: Quinlan Construction, Inc. | Permit type: Plumbing | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Research & deve | |||||
SCORE 100 Scope of work letter asdx biosystems Date: May 19, 2009 Contractor: Fire Defense Inc Client: Housing Industrial | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 4, 2009 | Current use: Office - profes | |||||
SCORE 95 New backflow install Date: September 11, 2009 Contractor: Freedom Fire Protection. Llc Client: Central 5540.0 | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - profes | |||||
SCORE 95 Install new backflow preventor Date: September 11, 2009 Contractor: Freedom Fire Protection. Llc Client: Housing Industrial | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - profes | |||||
SCORE 95 Tenant remodel - for 7,1 sf of second story space for mix 1 sports drink company. No new lighting, includes relocation of one sink, relocation of diffusers, and addition of electrical outlets. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 28, 2010 | Current use: Research & deve | |||||
SCORE 95 Tennant finish sprinkler Date: December 28, 2009 Contractor: Freedom Fire Protection. Llc Client: Housing Industrial | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: January 25, 2010 | Current use: Office - profes | |||||
SCORE 95 Overlay of existing roof. Versiweld 45-mil reinforced tpo membrane, 12 squares. Date: January 21, 2010 Contractor: Black Roofing Inc Client: Central 5540.0 | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Existing | |||||
SCORE 100 Bore 550foot along 55th for new comcast cable. Date: October 12, 2011 Contractor: Comcast Client: Housing Industrial | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | Current use: Warehousing, ex | |||||
SCORE 95 Tenant remodel of 8707 square feet of existing office space for hgst digital storage. Associated electrical, plumbing, and mechanical. Client: Investment Flatiron | Applicant: Sand Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Office - techni | |||||
SCORE 95 Scope of work letter - western digital, second floor Date: July 30, 2012 Contractor: Karmichael And Company Client: Investment Flatiron | Applicant: Karmichael And Company | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Office - admini | |||||
SCORE 100 Access to manhole for splicing Date: September 21, 2012 Contractor: Qwest Comm Centurylink Client: Investment Flatiron | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Interior, non-strucutral demolision of 300sf of professional office space. Date: January 25, 2013 Contractor: Quinlan Construction Inc Client: Central 5540.0 | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: April 10, 2015 | Current use: Office - profes | |||||
SCORE 95 Interior, non-structural demo of office walls and ceiling of offices. Date: June 20, 2013 Contractor: Quinlan Construction Inc Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Demolition | Permit status: Cmp | Completion date: April 10, 2015 | Current use: Office - techni | |||||
SCORE 100 Fs - sowl - inchturn 4 uprights into pendants for new ceiling. Turn 2 pendants into uprights for ceiling being removed. Relocate 1 upright for new wall being installed. Plug 1 due to heads to close togetherinch Date: June 24, 2013 Contractor: Fire Defense Inc Client: Investment Flatiron | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - admini | |||||
SCORE 100 Fa - modification to existing system Date: September 24, 2013 Contractor: Trident Security Systems Client: Investment Flatiron | Applicant: Trident Security Systems | Permit type: Fire | Permit status: Cmp | Completion date: November 5, 2013 | Current use: Office - admini | |||||
SCORE 95 Hgst-remodel existing lab space on first floor and create new compressor room, and add new fan coil unit and consdensing unit on roof. Scope also includes remodeling second floor lab space with air drops, new exhaust fan and condensing unit. Scope includes all associated mep. Client: Investment Flatiron | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 3, 2014 | Current use: Office - techni | |||||
SCORE 100 Bore 120foot on central to private property Date: January 15, 2014 Contractor: Comcast Client: Central 5540.0 | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Interior, non-structural tenant remodel to professioanl office space. 440sf - meps included Client: Central 5540.0 | Applicant: Quinlan Construction Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Fs - sowl - inchadd relocate 6 pendent sprinklers for the new 2nd floor office. Inch Date: November 7, 2014 Contractor: Freedom Fire Protection Llc Client: Central 5540.0 | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 93 Replace existing free-standing sign with a new internally illuminated free-standing sign, located on the median of central ave. At 55th street using the existing base. Date: May 28, 2015 Contractor: Broomfield Sign Co Inc Client: Investment Flatiron | Applicant: Broomfield Sign Co, Inc | Permit type: Electrical, sign | Permit status: Iss | |||||
SCORE 95 Inchlike for likeinch replacement of six rtufoots. Two 3 ton - 36k btu, two 6 ton - 72k btu, (1) 7. 5 ton - 92k btu, and (1) ton - 120k btu. Date: August 13, 2015 Contractor: Timberline Mechanical Systems Client: Investment Flatiron | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 95 Re-image of existing monument sign with non-illuminated sleeve over existing sign. New sign to contain address, flatirion park branding and multi-tenant identification. Permit type: Sign | Permit status: Iss | Current use: Existing | Permit id: Pmt2016-00632 | |||||
SCORE 95 Tenant remodel to create three offices (total area of 25 sf) in the south wing of 2nd floor -- suite number unknown. Includes minor electrical & mechanical -- no plumbing. Client: Housing Industrial | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: June 8, 2009 | Current use: Research & development, tenant remodel | Permit id: Pmt2009-01334 | |||||
SCORE 58 Installation of two hand sinks and a coffee bar on the 2nd floor -- south wing. Client: Housing Industrial | Permit type: Plumbing | Permit status: Cmp | Completion date: October 10, 2011 | Current use: Research & development, existing | Permit id: Pmt2009-01335 | |||||
SCORE 95 Scope of work letter asdx biosystems Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: August 4, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-01705 | |||||
SCORE 95 New backflow install Client: Central | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-03613 | |||||
SCORE 95 Install new backflow preventor Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: October 14, 2009 | Current use: Office - professional, existing | Permit id: Pmt2009-03621 | |||||
SCORE 95 Tenant remodel - for 7,1 sf of second story space for mix 1 sports drink company. No new lighting, includes relocation of one sink, relocation of diffusers, and addition of electrical outlets. Client: Housing Industrial | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: January 28, 2010 | Current use: Research & development, tenant remodel | Permit id: Pmt2009-04771 | |||||
SCORE 95 Tennant finish sprinkler Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: January 25, 2010 | Current use: Office - professional, existing | Permit id: Pmt2009-05143 | |||||
SCORE 95 Fs - sowl - inchturn 4 uprights into pendants for new ceiling. Turn 2 pendants into uprights for ceiling being removed. Relocate 1 upright for new wall being installed. Plug 1 due to heads to close togetherinch Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-02938 | |||||
SCORE 100 Fa - modification to existing system Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: November 5, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-04669 | |||||
SCORE 95 Hgst-remodel existing lab space on first floor and create new compressor room, and add new fan coil unit and consdensing unit on roof. Scope also includes remodeling second floor lab space with air drops, new exhaust fan and condensing unit. Scope includes all associated mep. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing, fire | Permit status: Cmp | Completion date: February 3, 2014 | Current use: Office - technical, tenant remodel | Permit id: Pmt2013-06285 | |||||
SCORE 97 Remove three gas meters, replace with a single meter. Client: Central | Permit type: Mechanical | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2000-04567 | |||||
SCORE 95 Interior tenant remodel. Client: Central Housing Co | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 9, 2001 | Current use: Office - professional, tenant remodel | Permit id: Pmt2001-00149 | |||||
Fire sprinkler system Date: January 25, 2001 Value: $250 Client: Housing Central | Permit type: Fire | Permit status: Cmp | Completion date: February 7, 2001 | Current use: Commercial/retail, existing | Permit id: Pmt2001-00282 | |||||
Bore 120foot on central to private property Date: January 15, 2014 Client: Central | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-00150 | |||||
SCORE 95 Interior, non-structural tenant remodel to professioanl office space. 440sf - meps included Client: Central | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-04672 | |||||
SCORE 95 Fs - sowl - inchadd relocate 6 pendent sprinklers for the new 2nd floor office. Inch Client: Central | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-05056 | |||||
SCORE 95 Tenant remodel of 8707 square feet of existing office space for hgst digital storage. Associated electrical, plumbing, and mechanical. Client: Investment Flatiron | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Office - technical, tenant remodel | Permit id: Pmt2012-03197 | |||||
SCORE 95 Scope of work letter - western digital, second floor Client: Investment Flatiron | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Office - administrative, existing | Permit id: Pmt2012-03609 | |||||
Access to manhole for splicing Date: September 21, 2012 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-04544 | |||||
SCORE 95 Overlay of existing roof. Versiweld 45-mil reinforced tpo membrane, 12 squares. Client: Central | Permit type: Roofing | Permit status: N&v | Current use: Existing | Permit id: Pmt2010-00225 | |||||
Floodplain development permit associated with pmt2007-05081. Associated materials & documents received under a resubmittal for pmt2007-05081 Date: March 24, 2008 Client: Housing Industrial | Permit type: Flood nonsubstantial mod/add | Permit status: Iss | Permit id: Pmt2008-00323 | |||||
SCORE 95 Scope of work letter droplet measurement technologies Client: Central | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2008-03006 | |||||
SCORE 95 Scope of work letter raise branch line and relocate 2 spinklers Client: Housing Industrial | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2008-04722 | |||||
SCORE 95 Tap water for irrigation - separate irrigation meter from domestic Date: November 2, 2007 Contractor: Valley Excavating, Inc Client: Housing Industrial | Permit type: Water, right-of-way | Permit status: Iss | Permit id: Pmt2007-04490 | |||||
SCORE 95 Scope of work letter change 6 pendants to uprights Client: Housing Industrial | Permit type: Fire | Permit status: Cls | Current use: Office - technical, existing | Permit id: Pmt2007-05398 | |||||
Bore 550foot along 55th for new comcast cable. Date: October 12, 2011 Client: Housing Industrial | Permit type: Right-of-way | Permit status: Iss | Current use: Warehousing, existing | Permit id: Pmt2011-04255 | |||||
SCORE 95 Replace existing free-standing sign with a new internally illuminated free-standing sign, located on the median of central ave. At 55th street using the existing base. Client: Investment Flatiron | Permit type: Electrical, sign | Permit status: Cmp | Completion date: January 13, 2016 | Permit id: Pmt2015-01737 | |||||
SCORE 95 Inchlike for likeinch replacement of six rtufoots. Two 3 ton - 36k btu, two 6 ton - 72k btu, (1) 7. 5 ton - 92k btu, and (1) ton - 120k btu. Client: Investment Flatiron | Permit type: Mechanical | Permit status: Cmp | Completion date: September 17, 2015 | Current use: Manufacturing, existing | Permit id: Pmt2015-03430 | |||||
Install test lead on gas main with two potholes, #12216139 Date: November 4, 2015 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04687 | |||||
Access five manholes for splicing only, manholes located through arapahoe & 55th to central, #n024959 Date: November 12, 2015 Client: Investment Flatiron | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04800 | |||||
SCORE 95 Installation of new partition wall with doors and create new opening and install new doors in existing wall in second floor lab space for muse bio. Client: Flatiron Gpif | Permit type: Building, electrical | Permit status: Iss | Current use: Office - technical, alteration | Permit id: Pmt2017-01746 | |||||
SCORE 95 Remodel and add shower, relocating ducts Client: Central | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Office - administrative, remodel | Permit id: Pmt2000-00391 | |||||
SCORE 95 Interior remodel on main floor and second floor. Client: Housing Central | Permit type: Building, electrical | Permit status: N&v | Current use: Office - professional, tenant remodel | Permit id: Pmt2000-01375 | |||||
SCORE 95 Remodel of reception area Client: Housing Central | Permit type: Building, electrical, mechanical, flood over-the-counter permit | Permit status: Cmp | Completion date: December 10, 2000 | Current use: Office - administrative, remodel | Permit id: Pmt2000-01962 | |||||
SCORE 95 Electrical permit for installation of three hvac units. Mechanical by separate permit. Client: Housing Central | Permit type: Electrical | Permit status: Cmp | Completion date: May 14, 2003 | Current use: Service industrial, existing | Permit id: Pmt2003-01193 | |||||
SCORE 95 3 new cooling units with condensors on roof, air handlers inside. Mechanical only this permit. Electrical work by separate permit already issued. (applicant has indicated that it was his understanding that there were no iecc requirements on additional cooling equipment on an existing system) Client: Central Housing Co | Permit type: Mechanical, flood not required | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2003-01653 | |||||
SCORE 95 Mechanical permit to replace a 5 ton roof-top unit Client: Central | Permit type: Mechanical | Permit status: Cmp | Completion date: April 10, 2007 | Current use: Office - administrative, existing | Permit id: Pmt2007-00801 | |||||
SCORE 95 Tenant remodel of 18,466 sf. No new plumbing, reconfiguration of office & warehouse space. Client: Housing Industrial | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: February 8, 2008 | Current use: Warehousing, tenant remodel | Permit id: Pmt2007-03190 | |||||
SCORE 95 Building permit for the demolition of interior non-loadbearing partition cubicle walls on the 2nd floor of existing office space. 22,0 sf w associated minor electrical work. Client: Housing Industrial | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: April 5, 2011 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2007-03192 | |||||
SCORE 98 Service change to 16 amps. Client: Housing Industrial | Permit type: Electrical | Permit status: Cmp | Completion date: November 28, 2007 | Current use: Service industrial, existing | Permit id: Pmt2007-03633 | |||||
SCORE 95 Demolish existing sink and floor drains in warehouse area and remodel toilet rooms on first floor. 3 sf Client: Housing Industrial | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 25, 2008 | Current use: Office - professional, tenant remodel | Permit id: Pmt2007-03697 | |||||
SCORE 95 Remodel first floor bathrooms. Includes re-arrangement of walls, new fixtures, electrical, mechanical and plumbing work. Client: Housing Industrial | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Warehousing, remodel | Permit id: Pmt2007-04048 | |||||
SCORE 95 Remodel 2nd floor including removal of interior walls and adjustment of bathrooms to comply with ada. Client: Housing Industrial | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Office - technical, tenant remodel | Permit id: Pmt2007-04385 | |||||
SCORE 95 Scope of work letter raise existing main and branch lines Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: May 15, 2008 | Current use: Office - professional, existing | Permit id: Pmt2007-04715 | |||||
SCORE 95 Scope of work letter change all heads from standard to quick response Client: Housing Industrial | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2007-04716 | |||||
SCORE 95 Demo two existing stair towers and replace with new stair towers and elevator shafts. Adding 1158 sf Client: Housing Industrial | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Office - technical, tenant remodel | Permit id: Pmt2007-05081 | |||||
SCORE 95 Tennant finish sprinkler Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: September 3, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-00225 | |||||
SCORE 95 Scope of work letter Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: September 3, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-02519 | |||||
SCORE 100 Tennant finish fire alarm adding smoke and heat detectors for elevator recall Client: Housing Industrial | Permit type: Fire | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-02709 | |||||
SCORE 95 Installation of 60inch of upper & lower cabinets and a small sink & water line to create a coffee bar area in the excel energy offices. Client: Housing Industrial | Permit type: Building, plumbing | Permit status: Cmp | Completion date: October 17, 2008 | Current use: Office - administrative, existing | Permit id: Pmt2008-04282 | |||||
SCORE 95 Tenant remodel for xcell outsourcing. 11 sf, removal of demising walls and associated electrical and mechanical. Client: Housing Industrial | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 13, 2008 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2008-04373 | |||||
SCORE 95 Fs - sowl (scope of work letter) for adding relocating approximately 4 sprinkler heads to accommodate new wall ceiling layout. See pmt 2017-01746 for general building permit. Muse bio. Client: Flatiron Gpif | Permit type: Fire | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-02192 | |||||
SCORE 95 Interior tenant remodel of existing office space musebio - scope ioncludes demolition of interior partition wall and construction of walls and doors, relocate existing receptacles, switches and thermostat. Fire sprinkler modifications by separate permit and separate review through bfrd. Client: Flatiron Gpif | Permit type: Building, electrical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-02874 | |||||
SCORE 95 Reconfiguration of interior walls -- demolition of 8 walls, 5 new walls to be constructed. Adding 6 cfm exhaust fan, adding two 208v amp circuits, one 120v amp dedicated circuit, one 208v amp Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, mechanical | Permit status: Cmp | Completion date: January 2, 2008 | Current use: Manufacturing, | |||||
SCORE 95 Reconfiguration of interior walls -- demolition of 8 walls, 5 new walls to be constructed. Adding 6 cfm exhaust fan, adding two 208v amp circuits, one 120v amp dedicated circuit, one 208v amp Client: Housing Industrial | Permit type: Building, mechanical, plumbing | Permit status: Cmp | Completion date: January 2, 2008 | Current use: Manufacturing, existing | Permit id: Pmt2007-05216 | |||||
SCORE 100 Under grounding existing aerial for joe paulson expires 5-18-2009 remove poles Date: February 20, 2009 Contractor: Xcel Energy Client: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of a new rtu, 13 seer, and a new a c unit 13 seer -- see engineering specifics for modification of roof for new equipment & penetrations. Client: Housing Industrial | Applicant: Quinlan Construction Inc | Permit type: Building, mechanical | Permit status: Cmp | Completion date: February 3, 2010 | Current use: Research & deve | |||||
SCORE 95 Installation of a new rtu, 13 seer, and a new a c unit 13 seer -- see engineering specifics for modification of roof for new equipment & penetrations. Client: Housing Industrial | Permit type: Building, mechanical | Permit status: Cmp | Completion date: February 3, 2010 | Current use: Research & development, alteration | Permit id: Pmt2009-05235 | |||||
SCORE 100 Place cable to several locations between arapahoe and western and 55th to conestoga st. Date: April 24, 2012 Contractor: Comcast Client: R Name | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
Place cable to several locations between arapahoe and western and 55th to conestoga st. Date: April 24, 2012 Client: R Name | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-01570 | |||||
SCORE 84 Tree pruning for xcel energy Date: June 3, 2013 Contractor: Wright Tree Service Inc Client: R Name | Applicant: Wright Tree Service, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 84 Directional bore to bury optic conduit and pothole, handholes Date: May 5, 2015 Contractor: Paonia Llc Client: R Name | Applicant: Paonia Llc | Permit type: Right-of-way | Permit status: Iss |