Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Add 3 42 inch high lights along walkways. Lights are covered. Date: June 12, 2006 Contractor: Kenny Electric Service Inc Client: Plaza Lakecentre | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: October 3, 2006 | Current use: Manufacturing | |||||
SCORE 100 Fire alarm system - voice system for amgen Date: May 22, 2006 Contractor: Metro Fire Detection Inc Client: Plaza Lakecentre | Applicant: Metro Fire Detection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - admini | |||||
SCORE 100 Fire alarm system - voice system for amgen Date: May 22, 2006 Contractor: Metro Fire Detection Inc Client: Plaza Lakecentre | Applicant: Metro Fire Detection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel to create offices, open areas for systems and meeting space. 10, 7 sf new baths lights etc. Client: Plaza Lakecentre | Applicant: Howell Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 7, 2006 | Current use: Research & deve | |||||
SCORE 95 Unit ac-92 tenant remodel to create offices open areas for systems furniture and meeting space. Client: Plaza Lakecentre | Applicant: Howell Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 18, 2006 | Current use: Research & deve | |||||
SCORE 95 Interior non-structural demolition in space ac-92 for future amgen office space (remodel under separate permit) Date: March 3, 2006 Contractor: Howell Construction Client: Plaza Lakecentre | Applicant: Howell Construction | Permit type: Demolition | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Office - techni | |||||
SCORE 95 Interior non-structural demolition in space ac-91 for future amgen office space (remodel under separate permit) Date: March 3, 2006 Contractor: Howell Construction Client: Plaza Lakecentre | Applicant: Howell Construction | Permit type: Demolition | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Office - techni | |||||
SCORE 65 36 feet of below grid non-rate wall in an existing tenant space that is currently vacant. Client: Plaza Lakecentre | Applicant: Plaza Lakecentre | Permit type: Building | Permit status: N&v | Current use: Research & deve | |||||
SCORE 95 Tenant remodel in an existing v-n building. Work includes the construction of two new walls creating a 12 x 12 office space. Client: Lakecentre Plaza Ltd Lllp | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 16, 2001 | Current use: Office - techni | |||||
SCORE 86 Tenant remodel Client: Plaza Lakecentre | Applicant: Gibbons Construction Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Office - techni | |||||
SCORE 98 Fire sprinkler system - ac-91 Date: April 6, 2006 Contractor: L. Nothhaft And Son Inc Client: Plaza Lakecentre | Applicant: L. Nothhaft & Son, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - techni | |||||
SCORE 98 Fire sprinkler system - ac-92 Date: April 6, 2006 Contractor: L. Nothhaft And Son Inc Client: Plaza Lakecentre | Applicant: L. Nothhaft & Son, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - techni | |||||
SCORE 96 Replacing a water heater. Date: March 29, 2001 Contractor: Deer Creek Plumbing Inc Client: Plaza Lakecentre | Applicant: Deer Creek Plumbing, Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 95 Tneant remodel to existing space. Add 5 offices and 1 conferance room. Client: Plaza Lakecentre | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 15, 2001 | Current use: Office - profes | |||||
SCORE 86 Fire sprinkler tenant finish - suite 105 Date: May 2, 2000 Contractor: Adnil Fire Protection Co Client: Plaza Lakecentre | Applicant: Adnil Fire Protection Co | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Install fire sprinkler sytem Date: January 13, 2000 Contractor: Wyco Fire Protection Inc Client: Plaza Lakecentre | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 23, 2000 | Current use: Commercial/reta | |||||
SCORE 100 Access to mh for splicing via mh18797 & mh21659. Job # e. 704068 Date: November 25, 2014 Contractor: Qwest Comm Centurylink Client: Plaza Lakecentre | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 89 Fa - es - spk monitoring only Date: March 27, 2015 Contractor: Detect Fire Llc Client: Plaza Lakecentre | Applicant: Detect Fire Llc | Permit type: Fire | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Office - admini | |||||
36 feet of below grid non-rate wall in an existing tenant space that is currently vacant. Date: January 4, 2000 Value: $1 Client: Plaza Lakecentre | Permit type: Building | Permit status: N&v | Current use: Research & development, tenant remodel | Permit id: Pmt2000-00138 | |||||
SCORE 95 Install fire sprinkler sytem Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: March 23, 2000 | Current use: Commercial/retail, alteration | Permit id: Pmt2000-00299 | |||||
SCORE 95 Tneant remodel to existing space. Add 5 offices and 1 conferance room. Client: Plaza Lakecentre | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 15, 2001 | Current use: Office - professional, tenant remodel | Permit id: Pmt2001-00398 | |||||
SCORE 95 Tenant remodel in an existing v-n building. Work includes the construction of two new walls creating a 12foot x 12foot office space. Client: Lakecentre Plaza Ltd Lllp | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 16, 2001 | Current use: Office - technical, tenant remodel | Permit id: Pmt2001-01065 | |||||
SCORE 95 Replacing a water heater. Client: Plaza Lakecentre | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01164 | |||||
Access to mh for splicing via mh18797 & mh21659. Job # e. 704068 Date: November 25, 2014 Client: Plaza Lakecentre | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-05325 | |||||
SCORE 89 Fa - es - spk monitoring only Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-01088 | |||||
SCORE 89 As - replace fire alarm system. Lakecentere plaza. Specialized see pmt 2017-00693 for general building permit. Client: Plaza Lakecentre | Permit type: Fire | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-01698 | |||||
SCORE 100 Interior tenant remodel. Scope includes demolition of partition walls, reconfiguration of shower rooms, new partition walls to create assembly, storage, and office areas. Includes associated mep. For a technical office (r&d) and product assembly prototype assembly, design & development of new products and related software, assembly of bike-fitting equipment and bike-fitting prototypes with components manufactured off-site. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-00693 | |||||
SCORE 95 Fire sprinkler - ti (entire building) for specialized. Client: Plaza Lakecentre | Permit type: Fire | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2017-01702 | |||||
36 feet of below grid non-rate wall in an existing tenant space that is currently vacant. Date: January 4, 2000 Value: $1,800 Client: Plaza Lakecentre | Permit type: Building | Permit status: N&v | Current use: Research & development, tenant remodel | Permit id: Pmt2000-00138 | |||||
SCORE 86 Tenant remodel Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Office - technical, tenant remodel | Permit id: Pmt2000-01447 | |||||
SCORE 86 Fire sprinkler tenant finish - suite 105 Client: Plaza Lakecentre | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2000-01773 | |||||
SCORE 95 Tenant remodel to create offices, open areas for systems and meeting space. 10, 7 sf new baths lights etc. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 7, 2006 | Current use: Research & development, tenant remodel | Permit id: Pmt2006-00992 | |||||
SCORE 95 Unit ac-92 tenant remodel to create offices open areas for systems furniture and meeting space. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 18, 2006 | Current use: Research & development, tenant remodel | Permit id: Pmt2006-00995 | |||||
SCORE 98 Fire sprinkler system - ac-92 Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - technical, existing | Permit id: Pmt2006-01210 | |||||
SCORE 98 Fire sprinkler system - ac-91 Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - technical, existing | Permit id: Pmt2006-01211 | |||||
SCORE 100 Fire alarm system - voice system for amgen Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - administrative, existing | Permit id: Pmt2006-01952 | |||||
SCORE 100 Fire alarm system - voice system for amgen Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: July 17, 2006 | Current use: Office - administrative, existing | Permit id: Pmt2006-01953 | |||||
SCORE 95 Add 3 42 inch high lights along walkways. Lights are covered. Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: October 3, 2006 | Current use: Manufacturing | Permit id: Pmt2006-02312 | |||||
SCORE 95 Fire sprinkler system - engenio Date: July 24, 2006 Contractor: Simplex Grinnell Client: Plaza Lakecentre | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Mechanical permit to install ductless split system for cooling of computer server room. Date: July 5, 2006 Contractor: Timberline Mechanical Systems Client: Plaza Lakecentre | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Research & deve | |||||
SCORE 95 Add ac upgrades. And new screening wall.. For new data storage area. Units will be at grade. Wall will be 36 inches in height. Date: June 16, 2006 Contractor: Sun Const And Design Service Inc Client: Plaza Lakecentre | Applicant: Sun Const & Design Service Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Research & deve | |||||
SCORE 56 Setting new panel, 5 wire twist lock chord cap locks for pdus, refeed from transformer to the new panel. Date: August 31, 2001 Contractor: Scott Greenhalge Client: Lakecentre Plaza Ltd | Applicant: Scott Greenhalge | Permit type: Electrical | Permit status: Cmp | Completion date: September 24, 2001 | Current use: Research & deve | |||||
SCORE 95 Tenant remodel on second floor to create new tenant space. All new walls below grid. Client: Plaza Lakecentre | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 30, 2004 | Current use: Office - techni | |||||
SCORE 95 Electrical and mechanical upgrades to existing lab facility. Date: May 2, 2003 Contractor: Sun Const And Design Service Inc Client: Plaza Lakecentre | Applicant: Sun Const & Design Service Inc | Permit type: Electrical, mechanic | Permit status: N&v | Current use: Research & deve | |||||
SCORE 100 Fire alarm system - 2nd and 3rd floor Date: January 2, 2001 Contractor: Safe Systems Inc Client: Plaza Lakecentre | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Current use: Office - profes | |||||
SCORE 56 Rewire office Date: April 3, 2001 Contractor: Facility And Plant Services Inc Client: Lakecentre Plaza Ltd Lllp | Applicant: Facility & Plant Services, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 21, 2001 | Current use: Office - admini | |||||
SCORE 82 Hook up office cubicles, ups system and rectifier. Date: January 19, 2001 Contractor: Mountain View Electric Client: Plaza Lakecentre | Applicant: Mountain View Electric | Permit type: Electrical | Permit status: Cmp | Completion date: February 13, 2001 | Current use: Office - admini | |||||
SCORE 95 Fire sprinkler system (2nd and 3rd floor) Date: October 27, 2000 Contractor: Wyco Fire Protection Inc Client: Plaza Lakecentre | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: January 24, 2001 | Current use: Office - profes | |||||
SCORE 95 Tenant finish for cisco systems. Includes building, mechanical, electrical, and plumbing. Client: Lakecentre Plaza Ltd Lllp | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Co | Current use: Office - techni | |||||
SCORE 86 Install 2 new passenger elevators. Marquis 25 2500lb. Continential 45 4500lb. Date: April 27, 2000 Contractor: Thyssen Dover Elevator Client: Lakecenter Plaza Ltd Lllp | Applicant: Thyssen Dover Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: August 31, 2000 | Current use: Office - admini | |||||
SCORE 100 Fire alarm system Date: May 1, 2000 Contractor: Safe Systems Inc Client: Plaza Lakecentre | Applicant: Safe Systems Inc. | Permit type: Fire | Permit status: Cmp | Completion date: January 25, 2001 | Current use: Office - admini | |||||
SCORE 95 Fire - core and shell with some tenant finish. Date: April 25, 2000 Contractor: Wyco Fire Protection Inc Client: Plaza Lakecentre | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Office - profes | |||||
SCORE 95 Tenant finish #100 Client: Plaza Lakecentre | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Co | Current use: Research & deve | |||||
SCORE 95 Ductless split system. 5-ton for computer room cooling cisco systems Date: October 2, 2006 Contractor: Timberline Mechanical Systems Client: Plaza Lakecentre | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2007 | Current use: Research & deve | |||||
SCORE 65 Remodel of existing conference & break rooms -- add split a c system, reconfiguration of ducts, outlets, lights. Reconfiguration of existing breakroom plumbing. Client: Plaza Lakecentre | Applicant: Plaza Lakecentre | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 3, 2008 | Current use: Office - techni | |||||
SCORE 100 Tennant finish sprinkler cisco systems Date: May 7, 2008 Contractor: Fire Defense Inc Client: Plaza Lakecentre | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2008 | Current use: Office - profes | |||||
SCORE 95 Tenant remodel - for interior changes to breakrooms on first floor and second floor and removal of offices to create excercise room for lsi corporation. Includes electrical, mechanical, and plumbing. Client: Plaza Lakecentre | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 100 Tennant finish sprinkler for lsi add 12 sprinkler heads relocate 2 Date: October 25, 2010 Contractor: Safety Systems Llc Client: Plaza Lakecentre | Applicant: Safety Systems, Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 11, 2011 | Current use: Research & deve | |||||
SCORE 82 Electrical permit - for addition of 8 amp service to industrial building for lsi corporation. Date: November 12, 2010 Contractor: P And L Electric Client: Plaza Lakecentre | Applicant: P & L Electric | Permit type: Electrical | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Manufacturing, | |||||
SCORE 99 Tennant finish fire alarm for lsi corporation Date: November 15, 2010 Contractor: C And S Speciality Systems Llc Client: Plaza Lakecentre | Applicant: C & S Speciality Systems, Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Research & deve | |||||
SCORE 82 Electrical permit only to redistribute electrical load on existing 8 amp service and installation of 3 additional panels. Date: December 22, 2010 Contractor: P And L Electric Client: Plaza Lakecentre | Applicant: P&l Electric | Permit type: Electrical | Permit status: Cmp | Completion date: April 29, 2011 | Current use: Research & deve | |||||
SCORE 56 Mechanical permit and plumbing permit - for new refrigeration system including 2 indoor air handlers and 48,0 btu cooling ( tons). Also includes removal (relocation) of 1 sink and addition of ice maker. Date: January 14, 2011 Contractor: Simpson Co Llc Client: Plaza Lakecentre | Applicant: Simpson Co, Llc | Permit type: Mechanical, plumbing | Permit status: Cmp | Completion date: March 21, 2011 | Current use: Research & deve | |||||
SCORE 82 Electrical permit - for addition of two (2) computer racks. (see pmt2010-05716) Date: March 9, 2011 Contractor: P And L Electric Client: Plaza Lakecentre | Applicant: P&l Electric | Permit type: Electrical | Permit status: Cmp | Completion date: July 13, 2012 | Current use: Office - techni | |||||
SCORE 82 Electrical permit for installation of new transformer and new panel. Relocation of existing circuits to new panel, no new loads. Date: December 7, 2012 Contractor: P And L Electric Client: Plaza Lakecentre | Applicant: P&l Electric | Permit type: Electrical | Permit status: Cmp | Completion date: July 29, 2015 | Current use: Office - techni | |||||
SCORE 96 Non-structural interior remodel of existing office space. Scope of work includes 9,856sf renovation of second level, including: selective demolition and subsequent construction of partitions, casework, ceiling systems, light fixtures, electrical componenets and hvac modifications. Also includes renovation of break room 213, and replacement of several plumbing fixtures. Client: Plaza Lakecentre | Applicant: Krische Construction, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 12, 2013 | Current use: Office - profes | |||||
SCORE 100 Fs - tf Date: May 1, 2013 Contractor: Central Fire Protection Client: Plaza Lakecentre | Applicant: Central Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Manufacturing, | |||||
SCORE 100 Fa - netapp Date: May 8, 2013 Contractor: Safe Systems Inc Client: Plaza Lakecentre | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - admini | |||||
SCORE 93 Suite 300: tenant remodel of existing vacant space to create vanilla shell. Includes demo of interior non-load bearing walls, installation of three new bulkheads, and associated mep. 357 square feet. Occupancy will be established through separate tenant remodel. Client: Plaza Lakecentre | Applicant: Precision Development Llc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - techni | |||||
SCORE 96 Netapp-install new ipe deck tiles, to be set on adjustable pedestals, over an existing epdm roof. No electrical, mechanical, plumbing or structural modifications associated with this permit. Client: Plaza Lakecentre | Applicant: Krische Construction, Inc | Permit type: Building | Permit status: Wdn | Current use: Office - techni | |||||
SCORE 98 Interior, non-structural tenant remodel for inchdatu healthinch. Third-floor office reconfiguration. Includes associated meps. Client: Plaza Lakecentre | Applicant: Jordy & Company, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 Fa - es - notification for datu health Date: November 28, 2014 Contractor: Complete Fire Protection Inc Client: Plaza Lakecentre | Applicant: Complete Fire Protection Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Fs - es - tf for office space (relocate 66 spks and add 28 spks) datu health Date: December 15, 2014 Contractor: Abc Fire Protection Inc Client: Plaza Lakecentre | Applicant: Abc Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 23, 2015 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of third floor, suite 300, for netapp (use installed through pmt2014-00771), including installation of non-bearing walls and rooftop platform and mechanical screening, mechanical work including new condensers on roof, 3rd floor split cooling system; electrical including power distribution panels, transformers and distribution bussway for increased electrical load. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-01635 | |||||
SCORE 95 Suite 300: interior non-structural demolition in preparation for tenant interior remodel under pmt2016-01635. Date: May 26, 2016 Contractor: Swinerton Builders Client: Highpoint | Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2016-02411 | |||||
SCORE 95 Fs - es - tf for office space Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: September 2, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-02849 | |||||
SCORE 77 Office remodel - interior remodel of existing technical office building to leave in gray-shell condition for future tenants. Scope includes demolition of existing non-structural walls and bulkheads, and electrical decomission of server room panels and minor new construction including drywall repair, new ceilings, and restoring the storefront to original appearance. Scope includes associated mep. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-03504 | |||||
SCORE 95 Fa - es - add notification to office space Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: September 21, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-03830 | |||||
SCORE 100 Interior remodel update of the common area at level 1. Common lobby - new lighting and finishes, toilet rooms - new lighting, finishes and fixtures, elevator cab - new lighting & finishes. Staircase - new lighting & finishes. Scope of work includes associated meps, to include plumbing fixture replacement relocation (only). Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, remodel | Permit id: Pmt2016-04313 | |||||
SCORE 98 Exterior building and site lighting upgrades for a commercial industrial parcel. Three poles to be relocated. Replacement of existing heads, downlights, and wall-packs. Client: Highpoint | Permit type: Electrical | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2016-04383 | |||||
SCORE 95 Fs - es - whitebox office space Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2016-04865 | |||||
SCORE 95 Fs - sowl - rel 12 spks for lobby Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2016-04867 | |||||
SCORE 100 Zayo boring to install fiber for zayo Date: October 20, 2016 Contractor: Robinson Brothers Construction Inc Client: Highpoint | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-04876 | |||||
SCORE 95 Non-structural interior remodel of existing office space. Scope of work includes 9,856sf renovation of second level, including: selective demolition and subsequent construction of partitions, casework, ceiling systems, light fixtures, electrical componenets and hvac modifications. Also includes renovation of break room 213, and replacement of several plumbing fixtures. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 12, 2013 | Current use: Office - professional, remodel | Permit id: Pmt2013-00118 | |||||
SCORE 100 Fs - tf Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2013-01809 | |||||
SCORE 95 Fa - netapp Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-01976 | |||||
SCORE 82 Hook up office cubicles, ups system and rectifier. Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: February 13, 2001 | Current use: Office - administrative, existing | Permit id: Pmt2001-00202 | |||||
SCORE 56 Rewire office Client: Lakecentre Plaza Ltd Lllp | Permit type: Electrical | Permit status: Cmp | Completion date: May 21, 2001 | Current use: Office - administrative, existing | Permit id: Pmt2001-01226 | |||||
SCORE 97 Setting new panel, 5 wire twist lock chord cap locks for pdus, refeed from transformer to the new panel. Client: Lakecentre Plaza Ltd | Permit type: Electrical | Permit status: Cmp | Completion date: September 24, 2001 | Current use: Research & development, existing | Permit id: Pmt2001-03719 | |||||
SCORE 93 Suite 300: tenant remodel of existing vacant space to create vanilla shell. Includes demo of interior non-load bearing walls, installation of three new bulkheads, and associated mep. 357 square feet. Occupancy will be established through separate tenant remodel. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 14, 2016 | Current use: Office - technical, tenant remodel | Permit id: Pmt2014-00771 | |||||
SCORE 95 Netapp-install new ipe deck tiles, to be set on adjustable pedestals, over an existing epdm roof. No electrical, mechanical, plumbing or structural modifications associated with this permit. Client: Plaza Lakecentre | Permit type: Building | Permit status: Wdn | Current use: Office - technical, existing, deck, new | Permit id: Pmt2014-03137 | |||||
SCORE 95 Interior, non-structural tenant remodel for inchdatu healthinch. Third-floor office reconfiguration. Includes associated meps. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-04297 | |||||
SCORE 95 Fa - es - notification for datu health Client: Plaza Lakecentre | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-05369 | |||||
SCORE 95 Fs - es - tf for office space (relocate 66 spks and add 28 spks) datu health Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: February 23, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2014-05534 | |||||
SCORE 82 Electrical permit for installation of new transformer and new panel. Relocation of existing circuits to new panel, no new loads. Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: July 29, 2015 | Current use: Office - technical, existing | Permit id: Pmt2012-04966 | |||||
SCORE 95 Tenant remodel - for interior changes to breakrooms on first floor and second floor and removal of offices to create excercise room for lsi corporation. Includes electrical, mechanical, and plumbing. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Office - administrative, tenant remodel | Permit id: Pmt2010-03575 | |||||
SCORE 99 Tennant finish sprinkler for lsi add 12 sprinkler heads relocate 2 Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: February 11, 2011 | Current use: Research & development, existing | Permit id: Pmt2010-04629 | |||||
Electrical permit - for addition of 8 amp service to industrial building for lsi corporation. Date: November 12, 2010 Value: $37,000 Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: February 24, 2011 | Current use: Manufacturing, existing | Permit id: Pmt2010-04784 | |||||
SCORE 99 Tennant finish fire alarm for lsi corporation Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: February 2, 2011 | Current use: Research & development, existing | Permit id: Pmt2010-04962 | |||||
SCORE 82 Electrical permit only to redistribute electrical load on existing 8 amp service and installation of 3 additional panels. Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: April 29, 2011 | Current use: Research & development, existing | Permit id: Pmt2010-05716 | |||||
SCORE 95 Tennant finish sprinkler cisco systems Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-01764 | |||||
SCORE 56 Mechanical permit and plumbing permit - for new refrigeration system including 2 indoor air handlers and 48,0 btu cooling ( tons). Also includes removal (relocation) of 1 sink and addition of ice maker. Client: Plaza Lakecentre | Permit type: Mechanical, plumbing | Permit status: Cmp | Completion date: March 21, 2011 | Current use: Research & development, existing | Permit id: Pmt2011-00059 | |||||
SCORE 82 Electrical permit - for addition of two (2) computer racks. (see pmt2010-05716) Client: Plaza Lakecentre | Permit type: Electrical | Permit status: Cmp | Completion date: July 13, 2012 | Current use: Office - technical, existing | Permit id: Pmt2011-00870 | |||||
SCORE 95 Suite 300-demo decommission of it room (labled at room 315). Client: Highpoint | Permit type: Building, mechanical | Permit status: Cmp | Completion date: May 5, 2017 | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-00294 | |||||
SCORE 95 Fs - tentant finish (netapp) Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: May 8, 2017 | Current use: Office - administrative, existing | Permit id: Pmt2017-00881 | |||||
SCORE 77 Interior tenant remodel for an existing technical office suite. Scope includes renovated office spaces, bathrooms, break room, assembly areas, and storage. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-01592 | |||||
SCORE 82 Removal of all electrical updates done for netapp lab under pmt2016-01635, including distribution panels, transformers, upsfoots, distribution bussway and branch circuits. Client: Highpoint | Permit type: Electrical | Permit status: Cmp | Completion date: May 3, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-00231 | |||||
SCORE 100 Office remodel - interior remodel of existing technical office building to leave in gray-shell condition for future tenants. Scope includes demolition of existing non-structural walls and bulkheads, and electrical decomission of server room panels and minor new construction including drywall repair, new ceilings, and restoring the storefront to original appearance. Scope includes associated mep. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-03504 | |||||
SCORE 95 Tenant finish #100 Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing, fire | Permit status: Co | Current use: Research & development, tenant finish | Permit id: Pmt2000-00349 | |||||
SCORE 86 Install 2 new four stop passenger elevators. Marquis 25 2500lb. Continential 45 4500lb. Client: Lakecenter Plaza Ltd Lllp | Permit type: Elevator | Permit status: Cmp | Completion date: August 31, 2000 | Current use: Office - administrative, existing | Permit id: Pmt2000-01150 | |||||
SCORE 95 Fire - core and shell with some tenant finish. Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Office - professional, existing | Permit id: Pmt2000-01662 | |||||
SCORE 100 Fire alarm system Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: January 25, 2001 | Current use: Office - administrative, existing | Permit id: Pmt2000-01747 | |||||
SCORE 95 Tenant finish for cisco systems. Includes building, mechanical, electrical, and plumbing. Client: Lakecentre Plaza Ltd Lllp | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - technical, tenant finish | Permit id: Pmt2000-04156 | |||||
SCORE 95 Fire sprinkler system (2nd and 3rd floor) Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Completion date: January 24, 2001 | Current use: Office - professional, existing | Permit id: Pmt2000-04374 | |||||
SCORE 95 Fire alarm system - 2nd and 3rd floor Client: Plaza Lakecentre | Permit type: Fire | Permit status: Cmp | Current use: Office - professional, existing | Permit id: Pmt2000-05136 | |||||
SCORE 95 Electrical and mechanical upgrades to existing lab facility. Value: $121,818 Contractor: Sun Const And Design Service Inc Client: Plaza Lakecentre | Permit type: Electrical, mechanical | Permit status: N&v | Current use: Research & development, existing | Permit id: Pmt2003-01643 | |||||
SCORE 95 Tenant remodel on second floor to create new tenant space. All new walls below grid. Client: Plaza Lakecentre | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 30, 2004 | Current use: Office - technical, remodel | Permit id: Pmt2004-01349 | |||||
SCORE 95 Add ac upgrades. And new screening wall.. For new data storage area. Units will be at grade. Wall will be 36 inches in height. Client: Plaza Lakecentre | Permit type: Electrical, mechanical, fence | Permit status: Cmp | Completion date: October 1, 2006 | Current use: Research & development, existing | Permit id: Pmt2006-02339 | |||||
SCORE 95 Mechanical permit to install ductless split system for cooling of computer server room. Client: Plaza Lakecentre | Permit type: Mechanical | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Research & development, existing | Permit id: Pmt2006-02439 | |||||
SCORE 95 Fire sprinkler system - engenio Value: $3,165 Contractor: Simplex Grinnell Client: Plaza Lakecentre | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2006-02960 | |||||
SCORE 95 Ductless split system. 5-ton for computer room cooling cisco systems Client: Plaza Lakecentre | Permit type: Mechanical | Permit status: Cmp | Completion date: January 31, 2007 | Current use: Research & development, existing | Permit id: Pmt2006-04258 | |||||
SCORE 95 Remodel of existing conference & break rooms -- add split a c system, reconfiguration of ducts, outlets, lights. Reconfiguration of existing breakroom plumbing. Client: Plaza Lakecentre | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 3, 2008 | Current use: Office - technical, tenant remodel | Permit id: Pmt2007-05250 | |||||
SCORE 57 Remodel of existing mechanical room to replace existing server room ac units with new rooftop mounted hvac units. Value: $575,000 Contractor: Emerald Cm Inc Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Den | Current use: Office - technical, tenant remodel | Permit id: Pmt2015-04351 | |||||
SCORE 86 Fs - per applicant: this open ceiling warehouse is being converted into a mixed occupancy (b, f-2 & s-2) with a new ceiling system throughout. Scope of work is to turn down the existing fire sprinkler heads throughout (1 relocates) and add an additional 13 fire sprinkler heads to the system to accommodate the new floor plan per nfpa 13. We will be installing new quick response pendants (viking microfast). Seee pmt 2017-01592 for general building permit. Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-02238 | |||||
SCORE 89 Fire alarm system - ti for also energy Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2017-02417 | |||||
SCORE 89 Suite 3 tenant improvement remodel for scaled agile of existing space. Includes limited new platform walls, electrical and mechanical. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-04102 | |||||
SCORE 89 Interior non-structural demolition of 15 square foot area in suite 300, associated with pmt2017-04102 tenant remodel permit Date: October 9, 2017 Contractor: Flatirons Construction Company Client: Highpoint | Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2017-04349 | |||||
SCORE 93 Fs - sowl (scope of work letter) for adding relocating 12 sprinkler heads to accommodate new wall ceiling layout. See pmt 2017-04102 for general building permit. Scaled agile suite 300. Value: $1,900 Contractor: Performance Fire Protection Inc Client: Highpoint | Permit type: Fire | Permit status: Act | Current use: Office - technical, existing | Permit id: Pmt2017-04693 | |||||
SCORE 95 Core and shell for building a Client: Lakecentre Ltd., Lllp | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Office - techni | |||||
SCORE 95 Core and shell for building a Client: Lakecentre Ltd., Lllp | Permit type: Building, electrical, mechanical, plumbing, elevator, fire, sitework | Permit status: Co | Current use: Office - technical, core and shell | Permit id: Pmt2000-00665 | |||||
SCORE 56 Tanant remodel on first and second floor for existing tenant (intuit). Convert three existing offices to four on both floors. All new walls are below grid. No new lighting, hvac or plumbing. Client: Highpoint Boulder | Applicant: Dave Selzler | Permit type: Building, electrical | Permit status: N&v | Current use: Research & deve | |||||
SCORE 95 Sitework curb and gutter for overflow parking lot in accordance with minor modification adr2003-00060. [see case notes] Date: June 23, 2003 Contractor: Rincon Development Inc Client: Boulder Highpoint Lllp | Applicant: Rincon Development, Inc. | Permit type: Sitework | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Office - profes | |||||
SCORE 95 Repair existing water service in property only Date: May 9, 2003 Contractor: Boulder Excavating Co Client: Highpoint Boulder | Applicant: Boulder Excavating Co | Permit type: Water | Permit status: Act | Current use: Office - techni | |||||
SCORE 100 Fire alarm system Date: January 3, 2001 Contractor: Safe Systems Inc Client: Boulder Highpoint Lllp | Applicant: Safe Systems, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 64 Fire alarm system - ti Date: May 17, 2002 Contractor: Aaa Fire And Security Client: Boulder Highpoint Lllp | Applicant: Aaa Fire & Security | Permit type: Fire | Permit status: Cmp | Current use: Office - profes | |||||
SCORE 95 Fire sprinkler system - eclipse Date: May 1, 2002 Contractor: Firetrol Protection Systems Client: Highpoint Boulder | Applicant: Firetrol Protection Systems | Permit type: Fire, flood not requ | Permit status: Cmp | Current use: Office - profes | |||||
SCORE 84 Interior tenant finish within an existing vacant tenant space. Client: Highpoint Boulder | Applicant: Sand Construction Inc | Permit type: Building, electrical | Permit status: Co | Current use: Tenant finish | |||||
SCORE 66 Fire alarm monitoring Date: May 15, 2001 Contractor: Alarm Monitoring Services Client: Boulder Highpoint Lllp | Applicant: Alarm Monitoring Services | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Fire sprinkler system - 3b Date: March 9, 2001 Contractor: Firetrol Protection Systems Client: Highpoint Boulder | Applicant: Firetrol Protection Systems | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 73 Fm-2 system and vesda system Date: February 13, 2001 Contractor: American Fire Systems Client: Boulder Highpoint | Applicant: American Fire Systems | Permit type: Fire | Permit status: Cmp | Completion date: April 2, 2001 | Current use: Office - profes | |||||
SCORE 95 Tenant finish - 1st and 2nd floors for cisco systems. Client: Highpoint Boulder | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Research & deve | |||||
SCORE 86 Install one hydraulic elevator. Date: November 8, 2000 Contractor: Thyssen Dover Elevator Client: Boulder Highpoint Lllp | Applicant: Thyssen Dover Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: September 19, 2001 | Current use: Commercial/reta | |||||
SCORE 86 Install one (1) hydraulic elevator. Date: November 8, 2000 Contractor: Thyssen Dover Elevator Client: Highpoint Boulder | Applicant: Thyssen Dover Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Commercial/reta | |||||
SCORE 95 Fire sprinkler system Date: October 30, 2000 Contractor: Wyco Fire Protection Inc Client: Boulder Highpoint | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2001 | Current use: Office - profes | |||||
SCORE 82 Temporary construction power. Date: October 9, 2000 Contractor: Mountain View Electric Client: Highpoint Boulder | Applicant: Mountain View Electric | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2000 | Current use: Office - techni | |||||
SCORE 95 Tenant finish Client: Highpoint Boulder | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Co | Current use: Office - admini | |||||
SCORE 95 Erect 1 permanent free-standing sign. Date: October 10, 2000 Contractor: Supersign Inc Client: Lakecentre Ltd | Applicant: Supersign, Inc. | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 New two story building - core and shell - lot 3b airport south - building b - no tenant identified. One of three buildings on lot 3b per airport south site review and airport south replat "b" subdivision.(19,092 1st 9,687 2nd = 28,779 total s. F.) Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Research & deve | |||||
SCORE 95 Grading and fill permit Date: June 20, 2007 Contractor: Wyatt Construction Company Client: Highpoint Boulder | Applicant: Wyatt Construction Company | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of existing conference & break room areas. Reconfiguration of interior walls, relocation of lights, outlets and reconfiguration of existing breakroom. No mechanical work under the scope of this permit. Client: Highpoint Boulder | Applicant: Rincon Development, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 29, 2008 | Current use: Office - techni | |||||
SCORE 100 Installation of a three phase circuit, amp for air conditioning unit. Date: September 10, 2008 Contractor: Kenny Electric Service Inc Client: Highpoint Boulder | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Research & deve | |||||
SCORE 95 Installation of 7. 5 ton split system for the data processing server room at cisco systems. Date: September 17, 2008 Contractor: Haynes Mechanical Systems Client: Highpoint Boulder | Applicant: Haynes Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2008 | Current use: Research & deve | |||||
SCORE 95 Tenant remodel of 22,962sf for national ecological observatory network. Client: Highpoint Boulder | Applicant: Sand Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 8, 2010 | Current use: Office - admini | |||||
SCORE 95 Sprinkler tennant finish neon Date: November 5, 2008 Contractor: Karmichael And Company Client: Highpoint Boulder | Applicant: Karmichael And Company | Permit type: Fire | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Office - techni | |||||
SCORE 100 Tennant finish fire alarm lake center Date: November 7, 2008 Contractor: Fire Alarm System Technologies Client: Highpoint Boulder | Applicant: Fire Alarm System Technologies | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 93 New suppression system for national ecological observatory network Date: May 7, 2009 Contractor: Tyco Westfire Client: Highpoint Boulder | Applicant: Tyco Westfire | Permit type: Fire | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 Replace rtu #6 with new 150,0 btu eer10. 8 unit. Date: April 16, 2010 Contractor: Timberline Mechanical Systems Client: Llc Bhigh | Applicant: Timberline Mechanical Systems | Permit type: Mechanical | Permit status: Cmp | Completion date: May 19, 2010 | Current use: Existing | |||||
SCORE 95 Mechanical permit - for new roof-top unit for telepresence room 36,0 btu hr and 13 seer. Electrical is included. Date: July 9, 2010 Contractor: Timberline Mechanical Systems Client: Llc Bhigh | Applicant: Timberline Mechanical Systems | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: September 30, 2010 | Current use: Office - admini | |||||
SCORE 95 Tenant remodel of portions of first and second floor for first rf corporation. Scope of work includes reconfiguration of non-bearing walls, replacement of lighting and plumbing fixtures, redistribution of existing hvac system. Client: Llc Bhigh | Applicant: Horizon Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 6, 2011 | Current use: Research & deve | |||||
SCORE 95 Interior non-structural demolition for removal of non-bearing office walls and finishes as proposed in plans for pmt2010-05042. Date: November 12, 2010 Contractor: Horizon Builders Client: Llc Bhigh | Applicant: Horizon Builders | Permit type: Demolition | Permit status: Cmp | Completion date: March 11, 2014 | Current use: Research & deve | |||||
SCORE 95 Scope of work letter for rf first corp Date: November 29, 2010 Contractor: Freedom Fire Protection. Llc Client: Llc Bhigh | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: February 14, 2011 | Current use: Office - profes | |||||
SCORE 95 Sign permit - for new non-illuminated wall sign on commercial building for inchfirst rf corporationinch. Sign is 24foot x 2. 5foot and 14 feet above grade. Date: January 12, 2011 Contractor: Husky Signs And Graphics Inc Client: Llc Bhigh | Applicant: Husky Signs & Graphics Inc | Permit type: Sign | Permit status: Cmp | Completion date: July 27, 2012 | Current use: Manufacturing, | |||||
SCORE 100 Manhole access for splicing to provide service to cust. @ 53 airport. (mh14789 on valmont and mh18797 on airport) Date: January 18, 2011 Contractor: Qwest Comm Centurylink Client: Llc Bhigh | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Construct a test lab (radio frequency antenna testing room) inside of a existing room -- other portion of room to be used as an equipment storage area. Relocate duct, associated electrical -- no plumbing. Install two sprinkler heads. Client: Highpoint Boulder | Applicant: Horizon Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 11, 2012 | Current use: Research & deve | |||||
SCORE 95 Scope of work letter relocate 6 existing sprinklers Date: August 3, 2011 Contractor: Freedom Fire Protection. Llc Client: Highpoint Boulder | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: June 26, 2012 | Current use: Office - profes | |||||
SCORE 100 Access two vaults on airport blvd & two on valmont to splice facilities to customer e. 394039-aqcb Date: November 26, 2012 Contractor: Qwest Comm Centurylink Client: Llc Bhigh | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | Current use: Office - admini | |||||
SCORE 100 Access to mh 18797 for splicing. Mh located back of sidewalk. E. 422639 aqcb Date: February 21, 2013 Contractor: Qwest Comm Centurylink Client: Llc Bhigh | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Consolidation of cisco operations into the 53 airport road structure. Tenant remodel of 45 sf (primarily on main level) with some minor work on 2nd floor. Applicant: Swinerton Builders, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 5, 2013 | Current use: Office - techni | |||||
SCORE 100 Fs - sowl - inchthis work consists of the addition of one sprinkler head in office cts3 and the relocation and removal plugging of six heads open office 111. Date: June 4, 2013 Contractor: Alpine Fire Sprinklers Inc Client: Llc Bhigh | Applicant: Alpine Fire Sprinklers, Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - admini | |||||
SCORE 100 Fa - relocate 1 strobe and add 3 strobes Date: June 14, 2013 Contractor: Fire Alarm Services Inc Client: Llc Bhigh | Applicant: Fire Alarm Services, Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - admini | |||||
SCORE 56 Fd - vesda and gas agent Date: June 14, 2013 Contractor: Llc Bhigh Client: Llc Bhigh | Applicant: Llc Bhigh | Permit type: Fire | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Office - admini | |||||
SCORE 95 Tenant interior remodel to common office and break space for it r & d company. Client: Highpoint Upip7 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 Interior non-structural demolition in preparation for tenant interior remodel under pmt2015-03199. Date: August 20, 2015 Contractor: Swinerton Builders Client: Highpoint Upip7 | Applicant: Swinerton Builders | Permit type: Demolition | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 Fs - sowl - add one spk for new wall Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: May 12, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-01428 | |||||
Contractor tbd. 1st floor (suite 100) remodel project to create a inchwhite boxinch to allow future tenants to visualize a custom floor plan. Scope of work includes associated meps, to include a hand sink removal and new lighing fixtures. Date: June 3, 2016 Value: $9,350 Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 8, 2016 | Current use: Office - technical, remodel | Permit id: Pmt2016-01488 | |||||
SCORE 95 1st floor (suite 100) remodel project to remove raised floor system, mechanical and electrical equipment from former tenant cisco systems including back-up genrator and power systems and air condioning units, in preparation for landlord inchwhite boxinch proposed in separate permit pmt2016-01488. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-01549 | |||||
SCORE 95 Sowl - remove fm-2 and reinstall sprinklers (16 sprinkler between two rooms) Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2016-02291 | |||||
SCORE 89 Es - fa - sowl demo system to white box on first floor. Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: September 29, 2016 | Current use: Office - professional, existing | Permit id: Pmt2016-02802 | |||||
SCORE 95 Install replacement rtu on a commercial industrial building, like for like. 12. 5 ton, 240,0 btu. Client: Highpoint | Permit type: Mechanical | Permit status: Cmp | Completion date: October 27, 2016 | Current use: Commercial/retail, existing | Permit id: Pmt2016-03266 | |||||
Access to mhfoots 14789 and 18797 to splice for additional fiber services to 53 airport. Date: August 24, 2016 Client: Highpoint | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03893 | |||||
SCORE 95 Fs - es - white box Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: September 8, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2016-04014 | |||||
SCORE 98 53 and 53 airport: exterior building and site lighting upgrades for a commercial industrial parcel. No new poles proposed. Replacement of existing heads, downlights, and wall-packs. Client: Highpoint | Permit type: Electrical | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2016-04385 | |||||
SCORE 93 New suppression system for national ecological observatory network Client: Highpoint Boulder | Permit type: Fire | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2009-01517 | |||||
Access to mh 18797 for splicing. Mh located back of sidewalk. E. 422639 aqcb Date: February 21, 2013 Client: Llc Bhigh | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-00653 | |||||
SCORE 98 Consolidation of cisco operations into the 53 airport road structure. Tenant remodel of 45 sf (primarily on main level) with some minor work on 2nd floor. Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: August 5, 2013 | Current use: Office - technical, tenant remodel | Permit id: Pmt2013-00943 | |||||
SCORE 95 Fs - sowl - inchthis work consists of the addition of one sprinkler head in office cts3 and the relocation and removal plugging of six heads open office 111. Client: Llc Bhigh | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-02518 | |||||
SCORE 95 Fa - relocate 1 strobe and add 3 strobes Client: Llc Bhigh | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-02741 | |||||
SCORE 95 Fd - vesda and gas agent Client: Llc Bhigh | Permit type: Fire | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-02742 | |||||
SCORE 95 Erect 1 permanent free-standing sign. Client: Lakecentre Ltd | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2000-03945 | |||||
SCORE 82 Temporary construction power. Client: Highpoint Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2000 | Current use: Office - technical, existing | Permit id: Pmt2000-04160 | |||||
SCORE 95 Fire alarm system Client: Boulder Highpoint Lllp | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2001-00023 | |||||
SCORE 95 Tenant finish - 1st and 2nd floors for cisco systems. Client: Highpoint Boulder | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Research & development, repair | Permit id: Pmt2001-00465 | |||||
SCORE 73 Fm-2 system and vesda system Client: Boulder Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: April 2, 2001 | Current use: Office - professional | Permit id: Pmt2001-00478 | |||||
SCORE 95 Fire sprinkler system - 3b Client: Highpoint Boulder | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2001-00837 | |||||
Access two vaults on airport blvd & two on valmont to splice facilities to customer e. 394039-aqcb Date: November 26, 2012 Client: Llc Bhigh | Permit type: Right-of-way | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2012-05579 | |||||
Tanant remodel on first and second floor for existing tenant (intuit). Convert three existing offices to four on both floors. All new walls are below grid. No new lighting, hvac or plumbing. Date: February 18, 2005 Value: $7 Client: Highpoint Boulder | Permit type: Building, electrical | Permit status: N&v | Current use: Research & development, tenant remodel | Permit id: Pmt2005-00565 | |||||
SCORE 95 Replace rtu #6 with new 150,0 btu eer10. 8 unit. Client: Llc Bhigh | Permit type: Mechanical | Permit status: Cmp | Completion date: May 19, 2010 | Current use: Existing | Permit id: Pmt2010-01393 | |||||
SCORE 95 Mechanical permit - for new roof-top unit for telepresence room 36,0 btu hr and 13 seer. Electrical is included. Client: Llc Bhigh | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: September 30, 2010 | Current use: Office - administrative, existing | Permit id: Pmt2010-02838 | |||||
SCORE 95 Tenant remodel of portions of first and second floor for first rf corporation. Scope of work includes reconfiguration of non-bearing walls, replacement of lighting and plumbing fixtures, redistribution of existing hvac system. Client: Llc Bhigh | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 6, 2011 | Current use: Research & development, tenant remodel | Permit id: Pmt2010-05042 | |||||
SCORE 95 Scope of work letter for rf first corp Client: Llc Bhigh | Permit type: Fire | Permit status: Cmp | Completion date: February 14, 2011 | Current use: Office - professional, existing | Permit id: Pmt2010-05281 | |||||
SCORE 95 Sign permit - for new non-illuminated wall sign on commercial building for inchfirst rf corporationinch. Sign is 24foot x 2. 5foot and 14 feet above grade. Client: Llc Bhigh | Permit type: Sign | Permit status: Cmp | Completion date: July 27, 2012 | Current use: Manufacturing, existing | Permit id: Pmt2011-00159 | |||||
Manhole access for splicing to provide service to cust. @ 53 airport. (mh14789 on valmont and mh18797 on airport) Date: January 18, 2011 Client: Llc Bhigh | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2011-00196 | |||||
SCORE 95 Construct a test lab (radio frequency antenna testing room) inside of a existing room -- other portion of room to be used as an equipment storage area. Relocate duct, associated electrical -- no plumbing. Install two sprinkler heads. Client: Highpoint Boulder | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: January 11, 2012 | Current use: Research & development, alteration | Permit id: Pmt2011-03117 | |||||
SCORE 95 Scope of work letter relocate 6 existing sprinklers Client: Highpoint Boulder | Permit type: Fire | Permit status: Cmp | Completion date: June 26, 2012 | Current use: Office - professional, existing | Permit id: Pmt2011-03235 | |||||
SCORE 95 Tenant interior remodel to common office and break space for it r & d company. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: July 28, 2016 | Current use: Office - technical, tenant remodel | Permit id: Pmt2015-03199 | |||||
SCORE 95 Fs - sowl - relocate 7 & add 13 for cisco Client: Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: April 12, 2016 | Current use: Office - administrative, existing | Permit id: Pmt2015-04491 | |||||
SCORE 100 Relocation of existing mpoe (main point of entry) room adjacent to the common lobby (142 sq. Ft.). Scope includes associated mechanical and electrical work. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: April 20, 2016 | Current use: Office - technical, remodel | Permit id: Pmt2015-05597 | |||||
SCORE 95 Fs - sowl - add rel x5 Client: Highpoint | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2017-00195 | |||||
SCORE 100 Tenant interior remodel for a technical office building. Scope includes new partition walls, doors, and finishes in common area lobby. Fixtures will be replaced in common area bathrooms with no change in plumbing fixture count. New lighting will be installed on existing circuitry. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Act | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-05758 | |||||
SCORE 95 New two story building - core and shell - lot 3b airport south - building b - no tenant identified. One of three buildings on lot 3b per airport south site review and airport south replat inchbinch subdivision.(19,092 1st + 9,687 2nd = 28,779 total s. F.) Permit type: Building, electrical, mechanical, plumbing, sitework | Permit status: Co | Current use: Research & development, core and shell | Permit id: Pmt2000-00840 | |||||
SCORE 95 Tenant finish Client: Highpoint Boulder | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - administrative, tenant finish | Permit id: Pmt2000-04069 | |||||
SCORE 95 Fire sprinkler system Client: Boulder Highpoint | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2001 | Current use: Office - professional, existing | Permit id: Pmt2000-04436 | |||||
SCORE 86 Install one two stop hydraulic elevator. Client: Boulder Highpoint Lllp | Permit type: Elevator | Permit status: Cmp | Completion date: September 19, 2001 | Current use: Commercial/retail, existing | Permit id: Pmt2000-04510 | |||||
SCORE 86 Install one (1) two stop hydraulic elevator. Client: Highpoint Boulder | Permit type: Elevator | Permit status: Cmp | Completion date: March 20, 2001 | Current use: Commercial/retail, remodel | Permit id: Pmt2000-04511 | |||||
SCORE 66 Fire alarm monitoring Value: $2,800 Contractor: Alarm Monitoring Services Client: Boulder Highpoint Lllp | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2001-01960 | |||||
SCORE 84 Interior tenant finish within an existing vacant tenant space. Client: Highpoint Boulder | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - technical, tenant finish | Permit id: Pmt2002-01125 | |||||
SCORE 95 Fire sprinkler system - eclipse Client: Highpoint Boulder | Permit type: Fire, flood not required | Permit status: Cmp | Current use: Office - professional, existing | Permit id: Pmt2002-01679 | |||||
SCORE 64 Fire alarm system - ti Client: Boulder Highpoint Lllp | Permit type: Fire | Permit status: Cmp | Current use: Office - professional, existing | Permit id: Pmt2002-02007 | |||||
SCORE 95 Repair existing water service in property only Contractor: Boulder Excavating Co Client: Highpoint Boulder | Permit type: Water | Permit status: Act | Current use: Office - technical, existing | Permit id: Pmt2003-01770 | |||||
SCORE 95 Sitework curb and gutter for overflow parking lot in accordance with minor modification adr2003-00060. [see case notes] Client: Boulder Highpoint Lllp | Permit type: Sitework | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Office - professional, existing | Permit id: Pmt2003-02320 | |||||
Tanant remodel on first and second floor for existing tenant (intuit). Convert three existing offices to four on both floors. All new walls are below grid. No new lighting, hvac or plumbing. Date: February 18, 2005 Value: $7,500 Client: Highpoint Boulder | Permit type: Building, electrical | Permit status: N&v | Current use: Research & development, tenant remodel | Permit id: Pmt2005-00565 | |||||
SCORE 95 Grading and fill permit Client: Highpoint Boulder | Permit type: Sitework | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Office - administrative, existing | Permit id: Pmt2007-02523 | |||||
SCORE 95 Tenant remodel of existing conference & break room areas. Reconfiguration of interior walls, relocation of lights, outlets and reconfiguration of existing breakroom. No mechanical work under the scope of this permit. Client: Highpoint Boulder | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: August 29, 2008 | Current use: Office - technical, tenant remodel | Permit id: Pmt2007-05251 | |||||
SCORE 95 Installation of a three phase circuit, amp for air conditioning unit. Client: Highpoint Boulder | Permit type: Electrical | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Research & development, existing | Permit id: Pmt2008-03943 | |||||
SCORE 95 Installation of 7. 5 ton split system for the data processing server room at cisco systems. Client: Highpoint Boulder | Permit type: Mechanical | Permit status: Cmp | Completion date: October 1, 2008 | Current use: Research & development, existing | Permit id: Pmt2008-03958 | |||||
SCORE 95 Tenant remodel of 22,962sf for national ecological observatory network. Client: Highpoint Boulder | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 8, 2010 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2008-04494 | |||||
SCORE 95 Sprinkler tennant finish neon Client: Highpoint Boulder | Permit type: Fire | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Office - technical, existing | Permit id: Pmt2008-04877 | |||||
SCORE 100 Tennant finish fire alarm lake center Client: Highpoint Boulder | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2008-04915 | |||||
Demolition of non load-bearing partition walls, break room, construction of new non load-bearing bulkheads and a small interior wall segment, finish repair and new switching for existing lighting. Re-using existing lights, hvac and plumbing. For tenant build out. Value: $32,000 Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing, demolition | Permit status: Act | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-02519 | |||||
SCORE 95 Reconfigure hazardous waste room. New sump pits. Two new eye washes. Partial rework of hvac. Pour new exterior pad. Rework one door. Changing wall areas. 1 sf take bulk chemicals and put them in smaller usable work containers. Lake center facility. Building ac-7. Client: Production Synergen | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 25, 2006 | Current use: Research & deve | |||||
SCORE 95 Non structural demo of concrete 4x4 pad and 8x8 cinder block wall. Date: February 1, 2006 Contractor: Sun Const And Design Service Inc Client: Production Synergen | Applicant: Sun Const & Design Service Inc | Permit type: Demolition | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Research & deve | |||||
SCORE 84 Core and shell addition to an existing manufacturing facility. No plumbing at this time, only roof drains being installed. Client: Amgen, Inc | Applicant: Jacobs Construction Services | Permit type: Building, electrical | Permit status: Co | Current use: Manufacturing, | |||||
SCORE 100 Amgen Date: May 27, 2005 Contractor: Fire Alarm Services Inc Client: Production Synergen | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 100 Partial structure demoltion of 3,5 square feet of unfinished structure for amgen, inc. Date: April 17, 2003 Contractor: William D. Hillen Corporation Client: Production Synergen | Applicant: William D. Hillen Corporation | Permit type: Demolition | Permit status: Cmp | Completion date: May 16, 2003 | Current use: Manufacturing, | |||||
SCORE 98 Fire sprinkler system - bulk fill area Date: February 28, 2005 Contractor: L. Nothhaft And Son Inc Client: Production Synergen | Applicant: L. Nothhaft & Son, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Manufacturing, | |||||
SCORE 88 Total tearoff and reroof. Densdeck. Class a. New 4"i so , carlisle mil tpo, Date: February 25, 2005 Contractor: Earl F. Douglass Roofing Co Client: Production Synergen | Applicant: Earl F. Douglass Roofing Co. | Permit type: Roofing | Permit status: Cmp | Completion date: September 30, 2005 | Current use: Office - techni | |||||
SCORE 95 Amgen remodel of existing bio-pharma sample management lab space number is ac-7 2607 sf. Client: Production Synergen | Applicant: Howell Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 29, 2005 | Current use: Research & deve | |||||
SCORE 95 Interior demo of non bearing masonry wall, acoustic ceiling, sink, lighting sprinkler, duct work. See pmt 2004-04086. For new construction inspace. Date: November 4, 2004 Contractor: Howell Construction Client: Production Synergen | Applicant: Howell Construction | Permit type: Demolition | Permit status: Cls | Current use: Research & deve | |||||
SCORE 84 Interior demolition of 40 sq ft in anticipation of interior remodel (pmt2004-04139). Date: November 1, 2004 Contractor: Jacobs Construction Services Client: Production Synergen | Applicant: Jacobs Construction Services | Permit type: Demolition | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Manufacturing, | |||||
SCORE 84 Interior remodel (3,892 s. F.) within the existing amgen facility. Client: Production Synergen | Applicant: Jacobs Construction Services | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 2, 2005 | Current use: Manufacturing, | |||||
SCORE 95 Installation of a walk-in cooler at amgen within the existing building. No increase in floor area or plumbing fixtures. Client: Production Synergen | Applicant: Howell Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 25, 2005 | Current use: Manufacturing, | |||||
SCORE 100 New 1-1 2" irrigation meter and tap Date: August 27, 2004 Contractor: Nixcavating Inc Client: Production Synergen | Applicant: Nixcavating, Inc | Permit type: Right-of-way | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 100 Fire alarm system - cell culture Date: June 18, 2004 Contractor: Fire Alarm Services Inc Client: Production Synergen | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 1, 2004 | Current use: Research & deve | |||||
SCORE 100 Fire alarm system - facp replacement Date: June 18, 2004 Contractor: Fire Alarm Services Inc Client: Production Synergen | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Research & deve | |||||
SCORE 95 Fire sprinkler system - addition Date: December 15, 2003 Contractor: Premier Fire Protection Client: Production Synergen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Manufacturing, | |||||
SCORE 84 Set five temporary construction trailers, two single wide, one three wide, one four wide, and one five wide for use during a 26,0 square foot addition to an exisitng building. Convert one single wide frm restrom use to conference room use. Trailers to be removed before c of o. Client: Production Synergen | Applicant: Jacobs Construction Services | Permit type: Building, plumbing | Permit status: N&v | Current use: Office - admini | |||||
SCORE 84 Temporary set-up for 5 construction trailers. Two single wides, one three wide, one four wide, one five wide. Modify one single wide from restroom use to conference room use. Date: November 3, 2003 Contractor: Jacobs Construction Services Client: Production Synergen | Applicant: Jacobs Construction Services | Permit status: N&v | |||||
SCORE 84 Tenant finish of new addition. Client: Production Synergen | Applicant: Jacobs Construction Services | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Manufacturing, | |||||
SCORE 56 Existing fire hydrant relocation. Date: June 26, 2003 Contractor: Arvada Excavating Co. Inc Client: Production Synergen | Applicant: Arvada Excavating Co., Inc. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 84 Footing foundation permit for an approved expansion at amgen (adr2003-00039). [see case notes] Client: Synergen Production Corporation | Applicant: Jacobs Construction Services | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Research & deve | |||||
SCORE 100 Temporary construction power for construction trailers. Date: April 9, 2003 Contractor: Sturgeon Electric Company Inc Client: Production Synergen | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 13, 2003 | Current use: Research & deve | |||||
SCORE 89 Temporary construction power at the amgen facility. Date: May 13, 2002 Contractor: Encompass Electrical Tech Client: Production Synergen | Applicant: Encompass Electrical Tech. | Permit type: Electrical | Permit status: Cmp | Completion date: May 29, 2002 | Current use: Manufacturing, | |||||
SCORE 95 Fire sprinkler system - fermintation expansion Date: September 26, 2002 Contractor: Simplex Grinnell Client: Synergen Production Corporation | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 99 Tenant improvement at the amgen facility. [nine floor drains to be added. See pmt2002-01066 for core & shell permit, chemical storage and iecc information]. Client: Production Synergen | Applicant: M A Mortenson Company | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 99 3,632 sq. Ft. Addition to the existing amgen building. Height not specified, addition is proposed at same height as existing. (see p-91-1, h-91-1, & p-92-46) Client: Production Synergen | Applicant: M A Mortenson Company | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 88 Tenant remodel Client: Synergen Production Corporation | Applicant: G E Johnson Const Company Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - admini | |||||
SCORE 97 Fire alarm first floor Date: August 2, 2000 Contractor: Sturgeon Electric Co Inc Client: Synergen Production Corp | Applicant: Sturgeon Electric Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Research & deve | |||||
SCORE 100 Tenant finish fire sprinklers and add new backflow Date: June 5, 2000 Contractor: Grinnell Fire Protection Client: Production Synergen | Applicant: Grinnell Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: July 30, 2001 | Current use: Manufacturing, | |||||
SCORE 97 Install fire alarm system Date: May 10, 2000 Contractor: Sturgeon Electric Co Inc Client: Synergen Production Corp | Applicant: Sturgeon Electric Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Manufacturing, | |||||
SCORE 95 New parking lot for 632 cars. Phase ii only. Date: September 6, 2006 Contractor: Quinlan Construction Inc Client: Production Synergen | Applicant: Quinlan Construction Inc | Permit type: Electrical, sitework | Permit status: Cmp | Current use: Office - techni | |||||
SCORE 95 Relocate 1 fire hydrant, new 8" tap & fire hydrant run, & a 1" tap & irrigation meter Date: September 15, 2006 Contractor: Valley Excavating Inc Client: Production Synergen | Applicant: Valley Excavating Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Exterior upgrades to include new sidewalks, lighting and retaining walls. Client: Production Synergen | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Manufacturing, | |||||
SCORE 100 Install new drive pan. Date: October 19, 2006 Contractor: Willmark Enterprises Inc Client: Production Synergen | Applicant: Willmark Enterprises, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 72 Two core and shell additions to existing building Client: Production Synergen | Applicant: Jacobs Field Services N. America | Permit type: Building, electrical | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Fire sprinkler system - loading dock Date: November 28, 2006 Contractor: Premier Fire Protection Client: Production Synergen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: February 23, 2007 | Current use: Research & deve | |||||
SCORE 95 Fire sprinkler system - generator building Date: November 28, 2006 Contractor: Premier Fire Protection Client: Production Synergen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: January 29, 2007 | Current use: Research & deve | |||||
SCORE 100 Temporary power for construction project amgen Date: April 23, 2008 Contractor: Sturgeon Electric Company Inc Client: Inc Amgen | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 19, 2010 | Current use: Research & deve | |||||
SCORE 56 Construction of signle story building to house neutralization skid used to pre-treat process waste streams. Minor mod approved through adr2008-00068, site review si-98-29. Contractor tbd. Per kirk, tenant finishes may be submitted next week. Client: Inc Amgen | Applicant: Jennifer Dougherty | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Manufacturing, | |||||
SCORE 99 Tenant finish of core and shell see pmt2008-02196. Neutralization skid used to process waste streams 13 sf amgen Client: Inc Amgen | Applicant: Crb Builders, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 28, 2009 | Current use: Research & deve | |||||
SCORE 95 Remove and replace damaged crosspan Date: July 10, 2008 Contractor: Superior Aggregates Client: Inc Amgen | Applicant: Superior Aggregates | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Temp power for construction trailers. Date: August 15, 2008 Contractor: Sturgeon Electric Company Inc Client: Inc Amgen | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2009 | Current use: Research & deve | |||||
SCORE 56 Installation of temporary trailer at amgen site trailer 1. Date: August 21, 2008 Contractor: Inc Amgen Client: Inc Amgen | Applicant: Inc Amgen | Permit type: Plumbing, water, was | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Installation of temporary trailer at amgen site trailer 2. Date: August 21, 2008 Contractor: Quinlan Construction Inc Applicant: Quinlan Construction Inc | Permit type: Mobile home | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Installation of temporary trailer at amgen site trailer 3. Date: August 21, 2008 Contractor: Quinlan Construction Inc Applicant: Quinlan Construction Inc | Permit type: Plumbing, water, was | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Installation of temporary trailer at amgen site trailer 4. Date: August 21, 2008 Contractor: Quinlan Construction Inc Applicant: Quinlan Construction Inc | Permit type: Mobile home | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 95 Remodel to install new interior door and minor wall work. No electrical, mechanical or plumbing proposed. Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Building | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Manufacturing, | |||||
SCORE 95 Tennant finish water mist system Date: November 25, 2008 Contractor: Westfire Inc Client: Inc Amgen | Applicant: Westfire, Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & deve | |||||
SCORE 95 Tennant finish sprinkler neutralization room Date: December 10, 2008 Contractor: Premier Fire Protection Client: Inc Amgen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & deve | |||||
SCORE 95 Tennant finish fire alarm for amgen chemical storage Date: December 12, 2008 Contractor: Integrated Safety Services Client: Inc Amgen | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & deve | |||||
SCORE 95 Interior modifications to structural walls & steel supports to remove an existing autoclave device and reinstall a larger autoclave -- includes associated electrical. Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 24, 2009 | Current use: Research & deve | |||||
SCORE 95 Interior wall & floor demolition related to pmt2009-01161. Date: April 8, 2009 Contractor: Sun Const And Design Service Inc Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Demolition | Permit status: Cmp | Completion date: May 22, 2009 | Current use: Research & deve | |||||
SCORE 95 Tennant finish sprinkler amgen autoclave Date: June 18, 2009 Contractor: Premier Fire Protection Client: Inc Amgen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Research & deve | |||||
SCORE 72 Installation of temporary construction office trailer at amgen. Trailer to be in place from 11 30 2009 - 11 2010. Date: November 24, 2009 Contractor: Jacobs Field Services N. America Client: Inc Amgen | Applicant: Jacobs Field Services N. America | Permit type: Electrical, plumbing | Permit status: Cmp | Current use: Manufacturing, | |||||
SCORE 100 Temporary construction power Date: December 11, 2009 Contractor: Sturgeon Electric Company Inc Client: Inc Amgen | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: January 5, 2010 | Current use: Existing | |||||
SCORE 95 Installation of temporary construction trailer for equipment retrofit at amgen facility. Trailer to be in place through september 2010. Date: January 6, 2010 Contractor: Sun Const And Design Service Inc Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Electrical, mobile h | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 100 Installation of temporary construction trailer for equipment retrofit at amgen facility. Trailer to be in place through september 2010. Date: January 8, 2010 Contractor: Kenny Electric Service Inc Client: Inc Amgen | Applicant: Kenny Electric Service, Inc. | Permit type: Electrical, mobile h | Permit status: N&v | Current use: Manufacturing, | |||||
SCORE 72 Construction of new foundation for relocation of centrifuge and addition of small platform with handrail on second floor. Client: Inc Amgen | Applicant: Jacobs Field Services N. America | Permit type: Building | Permit status: Cmp | Completion date: October 22, 2012 | Current use: Manufacturing, | |||||
SCORE 95 Temporary trailer for offices during construction at amgen. Trailer is 12foot x 40foot, will be up until march of 2011 and includes electrical. Date: August 18, 2010 Contractor: Sun Const And Design Service Inc Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Electrical, mobile h | Permit status: Cmp | Completion date: August 25, 2010 | Current use: Manufacturing, | |||||
SCORE 100 Tennant finish fire alarm addition of new duct detectors Date: September 28, 2010 Contractor: Kenny Electric Service Inc Client: Inc Amgen | Applicant: Kenny Electric Service, Inc | Permit type: Fire | Permit status: Iss | Current use: Research & deve | |||||
SCORE 95 Installation of temporary construction trailer for equipment retrofit at amgen facility. Trailer to be in place through 2012. Date: March 15, 2012 Contractor: Ma Mortenson Client: Inc Amgen | Applicant: Ma Mortenson | Permit type: Mobile home | Permit status: Iss | Current use: Manufacturing, | |||||
SCORE 95 Fire sprinkler - scope of work for mezz. Date: August 17, 2012 Contractor: Premier Fire Protection Client: Inc Amgen | Applicant: Premier Fire Protection | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Research & deve | |||||
SCORE 95 In lab area l118 and l119, conversion of 968 sf of unused lab area into a common goods storage area. No change to doorways or exiting. Removal of three sinks, associated cabinetry and case work. Remove unneeded electrical and plumbing and relabel panel circuits. Install new vct floor and shelving units (units to be less than 5foot 9inch in height). Modification of fire sprinkler system by separate permit. Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 28, 2012 | Current use: Manufacturing, | |||||
SCORE 95 Modification of ductwok, dampers and construct an airtight pipe chase in utility room. (p219 on plans). No electrical or plumbing on this permit. Client: Inc Amgen | Applicant: Sun Const & Design Service Inc | Permit type: Building, mechanical | Permit status: Cmp | Completion date: April 24, 2013 | Current use: Manufacturing, | |||||
SCORE 91 Fa - replace facp only Date: January 4, 2013 Contractor: Fire Detection Systems Llc Client: Inc Amgen | Applicant: Fire Detection Systems Llc | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - techni | |||||
SCORE 84 Fa - monitor of savis equipment (refrigeration systems) - x2 breakglass stations for start stop of refrigerant process in case of emergency, monitoring six panels for high refrigerant leaks. Updating graphic annunciator. Date: February 4, 2013 Contractor: Phoenix Fire Systems Inc Client: Inc Amgen | Applicant: Phoenix Fire Systems Inc | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Manufacturing, | |||||
SCORE 84 Electrical permit for refrigerant leak monitoring equipment to be integrated within fire alarm panel. Date: February 5, 2013 Contractor: Phoenix Fire Systems Inc Client: Inc Amgen | Applicant: Phoenix Fire Systems Inc | Permit type: Electrical | Permit status: Iss | Current use: Research & deve | |||||
SCORE 100 Access to mh required for splicing, and additional fiber repairs. Includes work at 55th & pearl pkwy and sterling cir. Date: October 27, 2014 Contractor: Qwest Comm Centurylink Client: Inc Amgen | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 56 Alteration of existing, non-illuminated, freestanding sign. Re-imaged sign inchastrazeneca biologics manufacturing centerinch on existing base. Client: Llc Medimmune | Permit type: Sign | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2016-00726 | |||||
SCORE 95 Interior demolition in preparation for tenant remodel under separate building permit. Scope includes demolition of walls, ceilings, floors, electrical components, and mechanical piping ducting. Client: Llc Medimmune | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Manufacturing, tenant remodel | Permit id: Pmt2016-00975 | |||||
SCORE 95 Temporary modular restroom facility per adr2016-00034. Scope of work includes associated meps - please note mechanical and plumbing valuations to be provided at a later date. Client: Llc Medimmune | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Cmp | Completion date: May 23, 2016 | Current use: Manufacturing, existing, office, new | Permit id: Pmt2016-01322 | |||||
SCORE 95 Temporary modular emergency medical facility per adr2016-00065. Scope of work includes associated Client: Llc Medimmune | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: May 23, 2016 | Current use: Manufacturing, existing, office, new | Permit id: Pmt2016-01323 | |||||
SCORE 95 Temporary modular office facility (10-plex) per adr2016-00034. Scope of work includes associated meps - please note mechanical and plumbing valuations to be provided at a later date. Client: Llc Medimmune | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Cmp | Completion date: May 23, 2016 | Current use: Manufacturing, existing, office, new | Permit id: Pmt2016-01325 | |||||
SCORE 95 Temporary modular office facility (3-plex) per adr2016-00034. Scope of work includes associated meps - please note mechanical and plumbing valuations to be provided at a later date. Client: Llc Medimmune | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Cmp | Completion date: May 23, 2016 | Current use: Manufacturing, existing, office, new | Permit id: Pmt2016-01327 | |||||
SCORE 95 Temporary modular office facility (6-plex) per adr2016-00034. Scope of work includes associated meps - please note mechanical and plumbing valuations to be provided at a later date. Client: Llc Medimmune | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 23, 2016 | Current use: Carport - detached, new | Permit id: Pmt2016-01584 | |||||
SCORE 72 Install 1 1 2inch water tap, meter & pit to serve several modular facilities. See pmt2016-01322 for approved tap, meter, & released parts. Date: May 9, 2016 Contractor: Rocky Mountain Water Works Client: Llc Medimmune | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-01950 | |||||
SCORE 61 Permit to relocate risers through slab for plumbing lines and sanitary sewer in advance of future tenant finish. No addition of fixtures in this scope. Client: Llc Medimmune | Permit type: Plumbing | Permit status: Cmp | Completion date: November 4, 2016 | Current use: Manufacturing, existing | Permit id: Pmt2016-02680 | |||||
SCORE 61 Phase 1 building permit for durvalumab to include the installation of new walls, ceilings, electrical, and hvac. Client: Llc Medimmune | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Manufacturing, tenant remodel | Permit id: Pmt2016-03001 | |||||
SCORE 95 Fs - es - upgrade spk piping to accomate correct current hazard classifications and associated design densities (:::firepump:::) Client: Llc Medimmune | Permit type: Fire | Permit status: Cmp | Completion date: November 4, 2016 | Current use: Manufacturing, existing | Permit id: Pmt2016-04249 | |||||
SCORE 95 Fs - es - sprinkler phase 2 & new 4 inch main (existing system - density change ord ii) Client: Llc Medimmune | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2016-04863 | |||||
SCORE 61 Tenant remodel-scope to include removing walls, ceilings, relocating existing lighting, and install new flooring. The location of work is at room w118 (storage room), locker bathrooms (east side of building), and l112 (conference room). Client: Llc Medimmune | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Manufacturing, tenant remodel | Permit id: Pmt2016-04915 | |||||
SCORE 84 Fire alarm ti for phase i Client: Llc Medimmune | Permit type: Fire | Permit status: Cmp | Completion date: November 4, 2016 | Current use: Research & development | Permit id: Pmt2016-04936 | |||||
SCORE 95 Adding a 6,0 gallon oxygen tank,14 ton co2 tank, and new pad for two new o2 vaporizers. Reference adr2016-00266 for minor modification. Fence under spearate permit. Client: Llc Medimmune | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Commercial/retail, remodel | Permit id: Pmt2016-05079 | |||||
SCORE 95 Interior modifications to structural walls & steel supports to remove an existing autoclave device and reinstall a larger autoclave -- includes associated electrical. Client: Inc Amgen | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 24, 2009 | Current use: Research & development, tenant remodel | Permit id: Pmt2009-01161 | |||||
SCORE 95 Tennant finish sprinkler amgen autoclave Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Research & development, existing | Permit id: Pmt2009-02280 | |||||
SCORE 72 Installation of temporary construction office trailer at amgen. Trailer to be in place from 11 30 2009 - 11 2010. Client: Inc Amgen | Permit type: Electrical, plumbing, water, wastewater, mobile home | Permit status: Cmp | Current use: Manufacturing, existing | Permit id: Pmt2009-04828 | |||||
SCORE 95 Temporary construction power Client: Inc Amgen | Permit type: Electrical | Permit status: Cmp | Completion date: January 5, 2010 | Current use: Existing | Permit id: Pmt2009-05045 | |||||
SCORE 91 Fa - replace facp only Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: June 3, 2013 | Current use: Office - technical, existing | Permit id: Pmt2013-00041 | |||||
SCORE 84 Fa - monitor of savis equipment (refrigeration systems) - x2 breakglass stations for start stop of refrigerant process in case of emergency, monitoring six panels for high refrigerant leaks. Updating graphic annunciator. Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Manufacturing, existing | Permit id: Pmt2013-00468 | |||||
SCORE 84 Electrical permit for refrigerant leak monitoring equipment to be integrated within fire alarm panel. Client: Inc Amgen | Permit type: Electrical | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2013-00493 | |||||
Access to mh required for splicing, and additional fiber repairs. Includes work at 55th & pearl pkwy and sterling cir. Date: October 27, 2014 Client: Inc Amgen | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-04656 | |||||
SCORE 95 Fire sprinkler - scope of work for mezz. Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: October 10, 2012 | Current use: Research & development, existing | Permit id: Pmt2012-04030 | |||||
SCORE 95 In lab area l118 and l119, conversion of 968 sf of unused lab area into a common goods storage area. No change to doorways or exiting. Removal of three sinks, associated cabinetry and case work. Remove unneeded electrical and plumbing and relabel panel circuits. Install new vct floor and shelving units (units to be less than 5foot 9inch in height). Modification of fire sprinkler system by separate permit. Client: Inc Amgen | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: September 28, 2012 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2012-04563 | |||||
SCORE 95 Modification of ductwok, dampers and construct an airtight pipe chase in utility room. (p219 on plans). No electrical or plumbing on this permit. Client: Inc Amgen | Permit type: Building, mechanical | Permit status: Cmp | Completion date: April 24, 2013 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2012-05974 | |||||
SCORE 84 Interior demolition of 40 sq ft in anticipation of interior remodel (pmt2004-04139). Date: June 14, 2005 Contractor: Jacobs Construction Services Client: Production Synergen | Permit type: Demolition | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Manufacturing, alteration | Permit id: Pmt2004-04232 | |||||
SCORE 95 Installation of temporary construction trailer for equipment retrofit at amgen facility. Trailer to be in place through september 2010. Client: Inc Amgen | Permit type: Electrical, mobile home | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2010-00055 | |||||
SCORE 95 Installation of temporary construction trailer for equipment retrofit at amgen facility. Trailer to be in place through september 2010. Client: Inc Amgen | Permit type: Electrical, mobile home | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2010-00082 | |||||
SCORE 95 Temporary trailer for offices during construction at amgen. Trailer is 12foot x 40foot, will be up until march of 2011 and includes electrical. Client: Inc Amgen | Permit type: Electrical, mobile home | Permit status: Cmp | Completion date: August 25, 2010 | Current use: Manufacturing, existing | Permit id: Pmt2010-03482 | |||||
SCORE 56 Existing fire hydrant relocation. Date: June 26, 2003 Contractor: Arvada Excavating Co., Inc Client: Production Synergen | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-02508 | |||||
Construction of signle story building to house neutralization skid used to pre-treat process waste streams. Minor mod approved through adr2008-00068, site review si-98-29. Contractor tbd. Per kirk, tenant finishes may be submitted next week. Date: August 6, 2008 Value: $81 Client: Inc Amgen | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Manufacturing, core and shell | Permit id: Pmt2008-02196 | |||||
SCORE 95 Remodel to install new interior door and minor wall work. No electrical, mechanical or plumbing proposed. Client: Inc Amgen | Permit type: Building | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Manufacturing, tenant remodel | Permit id: Pmt2008-04530 | |||||
SCORE 95 Install new drive pan. Date: October 19, 2006 Contractor: Willmark Enterprises, Inc Client: Production Synergen | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2006-04498 | |||||
SCORE 95 Fs - sowl - add x13 Client: Llc Medimmune | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2016-05908 | |||||
SCORE 84 Fire alarm - phase ii Client: Llc Medimmune | Permit type: Fire | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2017-00095 | |||||
SCORE 84 Fire alarm - conference room Client: Llc Medimmune | Permit type: Fire | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2017-00096 | |||||
SCORE 95 Fs - es - locker rooms Client: Llc Medimmune | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2017-00053 | |||||
SCORE 84 Fire alarm ti for locker room area Client: Llc Medimmune | Permit type: Fire | Permit status: Cmp | Completion date: May 23, 2017 | Current use: Manufacturing, existing | Permit id: Pmt2017-00471 | |||||
SCORE 97 Install fire alarm system Client: Synergen Production Corp | Permit type: Fire | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Manufacturing, existing | Permit id: Pmt2000-01778 | |||||
SCORE 100 Tenant finish fire sprinklers and add new backflow Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: July 30, 2001 | Current use: Manufacturing, existing | Permit id: Pmt2000-02246 | |||||
SCORE 97 Fire alarm first floor Client: Synergen Production Corp | Permit type: Fire | Permit status: Cmp | Completion date: September 12, 2000 | Current use: Research & development, existing | Permit id: Pmt2000-03156 | |||||
SCORE 88 Tenant remodel Client: Synergen Production Corporation | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-04728 | |||||
SCORE 99 3,632 sq. Ft. Addition to the existing amgen building. Height not specified, addition is proposed at same height as existing. (see p-91-1, h-91-1, & p-92-46) Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, addition | Permit id: Pmt2002-01066 | |||||
SCORE 99 Tenant improvement at the amgen facility. [nine floor drains to be added. See pmt2002-01066 for core & shell permit, chemical storage and iecc information]. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, tenant finish | Permit id: Pmt2002-02237 | |||||
SCORE 95 Fire sprinkler system - fermintation expansion Client: Synergen Production Corporation | Permit type: Fire | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2002-04204 | |||||
SCORE 95 Temporary construction power for construction trailers. Client: Production Synergen | Permit type: Electrical | Permit status: Cmp | Completion date: May 13, 2003 | Current use: Research & development, existing | Permit id: Pmt2003-01248 | |||||
SCORE 84 Footing foundation permit for an approved expansion at amgen (adr2003-00039). [see case notes] Client: Synergen Production Corporation | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Research & development, addition | Permit id: Pmt2003-01384 | |||||
SCORE 84 Core and shell addition to an existing manufacturing facility. No plumbing at this time, only roof drains being installed. Client: Amgen, Inc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Manufacturing, addition and remodel | Permit id: Pmt2003-01926 | |||||
SCORE 84 Tenant finish of new addition. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: April 7, 2006 | Current use: Manufacturing, tenant finish | Permit id: Pmt2003-04047 | |||||
SCORE 84 Temporary set-up for 5 construction trailers. Two single wides, one three wide, one four wide, one five wide. Modify one single wide from restroom use to conference room use. Contractor: Jacobs Construction Services Client: Production Synergen | Permit type: Temporary event | Permit status: N&v | Current use: Manufacturing, remodel | Permit id: Pmt2003-04750 | |||||
SCORE 84 Set five temporary construction trailers, two single wide, one three wide, one four wide, and one five wide for use during a 26,0 square foot addition to an exisitng building. Convert one single wide frm restrom use to conference room use. Trailers to be removed before c of o. Value: $18,713 Contractor: Jacobs Construction Services Client: Production Synergen | Permit type: Building, plumbing | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2003-04760 | |||||
SCORE 95 Fire sprinkler system - addition Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: September 30, 2004 | Current use: Manufacturing, existing | Permit id: Pmt2003-05274 | |||||
SCORE 95 Fire alarm system - facp replacement Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Research & development, existing | Permit id: Pmt2004-02279 | |||||
SCORE 95 Fire alarm system - cell culture Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: October 1, 2004 | Current use: Research & development, existing | Permit id: Pmt2004-02280 | |||||
SCORE 95 New 1-1 2inch irrigation meter and tap Date: August 27, 2004 Contractor: Nixcavating, Inc Client: Production Synergen | Permit type: Right-of-way | Permit status: Iss | Current use: Manufacturing, existing | Permit id: Pmt2004-03349 | |||||
SCORE 95 Installation of a walk-in cooler at amgen within the existing building. No increase in floor area or plumbing fixtures. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 25, 2005 | Current use: Manufacturing, alteration | Permit id: Pmt2004-04086 | |||||
SCORE 84 Interior remodel (3,892 s. F.) within the existing amgen facility. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 2, 2005 | Current use: Manufacturing, remodel | Permit id: Pmt2004-04139 | |||||
SCORE 95 Amgen remodel of existing bio-pharma sample management lab space number is ac-7 2607 sf. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 29, 2005 | Current use: Research & development, remodel | Permit id: Pmt2004-04519 | |||||
SCORE 88 Total tearoff and reroof. Densdeck. Class a. New 4inchi so , carlisle mil tpo, Client: Production Synergen | Permit type: Roofing | Permit status: Cmp | Completion date: September 30, 2005 | Current use: Office - technical, existing | Permit id: Pmt2005-00645 | |||||
SCORE 98 Fire sprinkler system - bulk fill area Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: August 12, 2005 | Current use: Manufacturing, existing | Permit id: Pmt2005-00657 | |||||
SCORE 95 Amgen Client: Production Synergen | Permit type: Fire | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2005-02017 | |||||
SCORE 95 Reconfigure hazardous waste room. New sump pits. Two new eye washes. Partial rework of hvac. Pour new exterior pad. Rework one door. Changing wall areas. 1 sf take bulk chemicals and put them in smaller usable work containers. Lake center facility. Building ac-7. Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 25, 2006 | Current use: Research & development, tenant remodel | Permit id: Pmt2005-04953 | |||||
SCORE 95 New parking lot for 632 cars. Phase ii only. Client: Production Synergen | Permit type: Electrical, sitework | Permit status: Cmp | Current use: Office - technical, existing | Permit id: Pmt2006-03746 | |||||
SCORE 95 Relocate 1 fire hydrant, new 8inch tap & fire hydrant run, & a 1inch tap & irrigation meter Date: September 15, 2006 Contractor: Valley Excavating Inc Client: Production Synergen | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2006-03914 | |||||
SCORE 95 Exterior upgrades to include new sidewalks, lighting and retaining walls. Client: Production Synergen | Permit type: Building, electrical, fence | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Manufacturing, existing | Permit id: Pmt2006-04368 | |||||
SCORE 72 Two core and shell additions to existing building Value: $789,480 Contractor: Jacobs Field Services N. America Client: Production Synergen | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Manufacturing, core and shell | Permit id: Pmt2006-04831 | |||||
SCORE 95 Fire sprinkler system - loading dock Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: February 23, 2007 | Current use: Research & development, existing | Permit id: Pmt2006-05023 | |||||
SCORE 95 Fire sprinkler system - generator building Client: Production Synergen | Permit type: Fire | Permit status: Cmp | Completion date: January 29, 2007 | Current use: Research & development, existing | Permit id: Pmt2006-05024 | |||||
SCORE 95 Temporary power for construction project amgen Client: Inc Amgen | Permit type: Electrical | Permit status: Cmp | Completion date: May 19, 2010 | Current use: Research & development, existing | Permit id: Pmt2008-01540 | |||||
Construction of signle story building to house neutralization skid used to pre-treat process waste streams. Minor mod approved through adr2008-00068, site review si-98-29. Contractor tbd. Per kirk, tenant finishes may be submitted next week. Date: August 6, 2008 Value: $81,000 Client: Inc Amgen | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: November 19, 2009 | Current use: Manufacturing, core and shell | Permit id: Pmt2008-02196 | |||||
SCORE 99 Tenant finish of core and shell see pmt2008-02196. Neutralization skid used to process waste streams 13 sf amgen Client: Inc Amgen | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: September 28, 2009 | Current use: Research & development, tenant finish | Permit id: Pmt2008-02533 | |||||
SCORE 95 Temp power for construction trailers. Client: Inc Amgen | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2009 | Current use: Research & development, existing | Permit id: Pmt2008-03509 | |||||
SCORE 95 Installation of temporary trailer at amgen site trailer 1. Client: Inc Amgen | Permit type: Plumbing, water, wastewater, mobile home | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2008-03633 | |||||
SCORE 95 Installation of temporary trailer at amgen site trailer 3. Value: $5,000 Contractor: Quinlan Construction Inc Permit type: Plumbing, water, wastewater, mobile home | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2008-03635 | |||||
SCORE 99 Tennant finish water mist system Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & development, existing | Permit id: Pmt2008-05182 | |||||
SCORE 95 Tennant finish sprinkler neutralization room Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & development, existing | Permit id: Pmt2008-05334 | |||||
SCORE 95 Tennant finish fire alarm for amgen chemical storage Client: Inc Amgen | Permit type: Fire | Permit status: Cmp | Completion date: February 20, 2009 | Current use: Research & development, existing | Permit id: Pmt2008-05388 | |||||
SCORE 95 Tennant finish fire alarm addition of new duct detectors Value: $31,500 Contractor: Kenny Electric Service, Inc Client: Inc Amgen | Permit type: Fire | Permit status: Iss | Current use: Research & development, existing | Permit id: Pmt2010-04201 | |||||
SCORE 95 Temporary aluminum storage tent per adr2016-00034. Scope of work includes associated mes - please note mechanical valuation to be provided at a later date. Value: $150,000 Contractor: Howell Construction Client: Llc Medimmune | Permit type: Building, electrical, mechanical | Permit status: Den | Current use: Manufacturing, existing, carport - detac | Permit id: Pmt2016-01326 | |||||
SCORE 84 Fire alarm ti for locker room area. Value: $8,200 Contractor: Phoenix Fire Systems Inc Client: Llc Medimmune | Permit type: Fire | Permit status: N&v | Current use: Manufacturing, existing | Permit id: Pmt2017-00470 | |||||
SCORE 83 Roof overlay of an accessory structure used to house mechanical equipment, 21 squares of mil tpo on a pitch represented as 0. 25 12 (flat roof). All roof materials shall be installed per manufacturerfoots specs. Mid-roof inspection required if pitch is less than 4 12. Client: Pharmaceut Astrazeneca | Permit type: Roofing | Permit status: Cmp | Completion date: September 11, 2017 | Current use: Warehousing, existing | Permit id: Pmt2017-03450 | |||||
SCORE 79 Installation of clearwire cellular telecommunications facility per adr2010-00155. Client: Of City | Applicant: Advanced Wireless Solutions | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunicati | |||||
SCORE 79 Installation of clearwire cellular telecommunications facility per adr2010-00155. Client: Of City | Permit type: Building, electrical | Permit status: N&v | Current use: Telecommunications, remodel | Permit id: Pmt2010-04626 |