Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Dccr proposes to drill one geotechnical boring (rcagi-41) located south of riggs road ne and east of north capitol st nw (east of 5233 north capitol st ne). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schem Date: October 16, 2015 Contractor: Salut Inc Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117673 | |||||
SCORE 95 Permit 733832, wr 3106085. 4x5 cut repair on gas main at 5233 n capitol st ne. Date: February 27, 2017 Contractor: Wash Gas And Light Co Permit type: Excavation; repair gas main line | Permit status: Permit expired | Expiration date: April 24, 2017 | Permit id: Pa201432 | |||||
SCORE 96 Phase 3 takoma to harvard substation - pepco inc and accumark - use of roadway to stage trucks for 48 vacuum excavated utility test pits from 53 block north capitol street n. E, missouri avenue n. W, south on 53 block new hampshire ave n. W inter-sectiong ingraham street, hamilton street, gallatin street, farragut street, emerson street, decatur street, 3rd street, crittten street, buchanan street, allision street and ending at 44 block new hampshire avenue n. W. Date: May 11, 2017 Contractor: Accumark Inc Client: Pepco Inc. | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 13, 2017 | Permit id: Pa204194 | |||||
SCORE 79 Construction staging area Date: November 10, 2015 Contractor: Mark Fletcher Salut, Inc Permit status: Permit expired | Expiration date: December 16, 2015 | Permit id: Pa10218917 | |||||
SCORE 96 Construction staging area Date: May 11, 2017 Contractor: Accumark Inc Permit status: Permit expired | Expiration date: June 2, 2017 | Permit id: Pa10396529 |