Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Basement add a bedroom, new wet bar, relocate the full bath and relocate the washer dryer and mechanical room. First floor remove the interior non-load bearing wall, replace the existing kitchen cabinets and minor interior wall work. Second floor one full bath and new washer dryer. New mechanical duct system upgrade the electrical panel exterior windows will be replaced as needed. Garage door will be replaced abd ceiling damaged joist will be replaced as needed. Date: December 27, 2016 Contractor: Farrukh Ahmed; Aydeniz Client: Farrukh Ahmed | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1702981 | |||||
SCORE 96 Electrical Date: January 10, 2017 Contractor: Eugene S Ahns Client: Rochelle E Eubanks | Permit status: Completed | Permit id: E1702505 | |||||
SCORE 88 Plumbing and gas Date: January 10, 2017 Contractor: Gregory D Bennett Client: Rochelle E Eubanks | Permit status: Completed | Permit id: P1702521 | |||||
SCORE 96 Mechanical Date: February 9, 2017 Contractor: David Movafagh Client: Global Telecom Group Real Estate Llc | Permit status: Completed | Permit id: M1701235 |