Building Permits at 51 New Hampshire Avenue Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 51 New Hampshire Avenue Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Repair water services (meter pit) in tree space 6x6
Date:  July 20, 2017
Contractor: Dcwater

Permit type: Excavation; repair water service lateral | Permit status: Permit expired | Expiration date: September 17, 2017 | Permit id: Pa219404
2017/07/20010051 New Hampshire Avenue Nw Washington DcDcwater
SCORE
100
Construction staging area
Contractor: Dcwater

Permit status: Notpaid | Expiration date: September 30, 2017 | Permit id: 0
010051 New Hampshire Avenue Nw Washington DcDcwater
SCORE
82
Dccr proposes to drill one geotechnical boring (rcagi-29) located in the southbound parking lane of new hampshire ave nw east of 51 new hampshire ave. Nw. The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. No drilling spoils or excavated soils will be used as backfill. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached schemat
Date:  October 16, 2015
Contractor: Salut Inc

Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa117672
2015/10/1608251 New Hampshire Avenue Nw Washington DcSalut Inc
SCORE
100
Repair water services (meter pit) in tree space 6x6
Date:  July 27, 2017
Contractor: Dcwater Ops

Permit status: Permit expired | Expiration date: September 17, 2017 | Permit id: Pa219404
2017/07/27010051 New Hampshire Avenue Nw Washington DcDcwater Ops
SCORE
79
Construction staging area
Date:  November 11, 2015

Permit status: Permit expired | Expiration date: December 16, 2015 | Permit id: Pa10218939
2015/11/1107951 New Hampshire Avenue Nw Washington DcMark Fletcher Salut, Inc
SCORE
100
Construction staging area
Contractor: Dcwater Ops

Permit status: Not paid | Expiration date: September 30, 2017 | Permit id: 0
010051 New Hampshire Avenue Nw Washington DcDcwater Ops
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.