Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Build 2 landings 1) 5 x 8 and 1) 4 x 4 also build 46 lf ada ramp with handrails to connect landings. ![]() ![]() Client: Herold, Chris | Permit id: Sfd20123430 | |||||
SCORE 86 Build 2 landings 1) 5 x 8 and 1) 4 x 4 also build 46 lf ada ramp with handrails to connect landings. Client: Herold, Chris | Permit id: Sfd20123430 | |||||
SCORE 86 Build 2 landings 1) 5 x 8 and 1) 4 x 4 also build 46 lf ada ramp with handrails to connect landings. Client: Herold, Chris | Permit id: Sfd20123430 |