Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 General repairs double residence repair and renovate existing double, some rafter and stud wall replacement. Date: March 21, 2003 Contractor: George W. Stemley Client: Gabriel 3, Clarence E | Permit id: B03001583 | |||||
SCORE 59 Building renovations double residence plumbing, hvac, insulate,hang sheetrock tile,carpet, add two 5x11 utility rooms. Date: June 17, 2003 Contractor: George W. Stemley Client: Gabriel 3, Clarence E | Permit id: B03003302 | |||||
SCORE 98 Electrical construction loop double residence don davis Date: March 28, 2003 Contractor: Don Davis Client: Gabriel 3, Clarence E | Permit id: E03002344 | |||||
SCORE 98 Electrical rewiring double residence don davis Date: August 5, 2003 Contractor: Don Davis Client: Gabriel 3, Clarence E | Permit id: E03006038 | |||||
SCORE 96 Install mechanical equipment double residence install gas line, gas water heater, gas warm air furnace and 3-ton ac. Rader carter 945-5685 Date: February 16, 2004 Contractor: Carter And Sons Plumbing Client: Gabriel 3, Clarence E | Permit id: M04001209 |