Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 42 sf re-roof for sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material clay tile proposed roofing material relay existing clay tile manufacturer na brand and model na color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) na specific exemption from cool roof requirements (if applicable) climate zone 7, 4 12 exempt from cool roof required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: April 14, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: August 23, 2005 Permit status: Pass | Permit id: Pds2005-1007-20 |