Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 74 Service upgrade, and rewire outlet Date: August 22, 2000 Contractor: Key Electrical Contractor Inc Client: Mosele | Applicant: Key Electrical Contractor Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 9, 2000 | Current use: Single family d | |||||
SCORE 84 Total tear off and overlay of 27 squares of dimensional shingles at 5:12 pitch Date: September 21, 2012 Contractor: Global Roofing Client: Place Tentwenty | Applicant: Global Roofing | Permit type: Roofing | Permit status: Cmp | Completion date: October 23, 2012 | Current use: Single family d | |||||
SCORE 74 Service upgrade, and rewire outlet Client: Mosele | Permit type: Electrical | Permit status: Cmp | Completion date: September 9, 2000 | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-03461 | |||||
SCORE 84 Total tear off and overlay of 27 squares of dimensional shingles at 5:12 pitch Client: Place Tentwenty | Permit type: Roofing | Permit status: Cmp | Completion date: October 23, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04608 | |||||
SCORE 99 Tree pruning (cob forestry project - pat bohin) Date: September 19, 2008 Contractor: Ironwood Earthcare Inc Client: R Name | Applicant: Ironwood Earthcare, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 96 Tear-off reroof of sfd, squares on a pitch represented as 7 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Date: August 7, 2009 Contractor: 3 R Roofing Llc Client: Robert Mccaleb | Applicant: 3 R Roofing, Llc | Permit type: Roofing | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family d | |||||
SCORE 95 Installation of 4. 62 kw rooftop solar photovoltaic system. Date: February 5, 2010 Contractor: Namaste Solar Electric Inc Client: Robert Mccaleb | Applicant: Namaste Solar Electric Inc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2010 | Current use: Single family d | |||||
SCORE 95 Tear-off reroof of sfd, squares on a pitch represented as 7 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Client: Robert Mccaleb | Permit type: Roofing | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03090 | |||||
SCORE 95 Installation of 4. 62 kw rooftop solar photovoltaic system. Client: Robert Mccaleb | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00444 | |||||
SCORE 99 Installation of reduced pressure back flow, to be above grade. Date: November 8, 2010 Contractor: Barley Plumbing And Heating Inc Client: Frank Pipp, Pipp | Applicant: Barley Plumbing And Heating Inc | Permit type: Plumbing | Permit status: Cmp | Completion date: December 6, 2010 | Current use: Multifamily dwe | |||||
SCORE 95 Insstallation of a replacement gas-fired water heater -- unit a Date: January 3, 2012 Contractor: American Residential Services Client: Debra Whitehead | Applicant: American Residential Services | Permit type: Mechanical | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 89 Replacement water heater Date: September 26, 2013 Contractor: Energy Wise Homes Client: Eric Gordon,Celia Gordon | Applicant: Energy Wise Homes | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2015 | Current use: Townhomes, exis | |||||
SCORE 89 Replacement water heater Client: Eric Gordon | Permit type: Mechanical | Permit status: Cmp | Completion date: April 3, 2015 | Current use: Townhomes, existing | Permit id: Pmt2013-20369 | |||||
SCORE 95 Insstallation of a replacement gas-fired water heater -- unit a Client: Debra Whitehead | Permit type: Mechanical | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00009 | |||||
SCORE 99 Installation of reduced pressure back flow, to be above grade. Client: Frank Pipp | Permit type: Plumbing | Permit status: Cmp | Completion date: December 6, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-04923 | |||||
SCORE 95 Tap new irrigation service from private cu raw water main on campus near varsity pond. Bore across university adjacent to cu telecom in existing easement. Bore, (back of walk), along n-side university to 15th then north to ibs bldg. Date: March 21, 2011 Contractor: Left Hand Excavating Client: Of State | Applicant: Left Hand Excavating | Permit type: Right-of-way | Permit status: Iss | |||||
"moved in" res Value: $7,500 Permit type: Moved in residence | Permit id: Bp-63-7168 | |||||
"moved in" res Permit type: Moved in residence | Permit id: Bp-63-7168 | |||||
SCORE 92 Place crane in alley to take down room air unit and replace. Two-day setup Date: April 4, 2013 Contractor: Rms Cranes Llc Client: R Name | Applicant: Rms Cranes Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Bore 2,520foot of 2inch pe gas main, #12069827, xcel staff not to pickup this permit - sitewise only Date: April 30, 2015 Contractor: Xcel Energy Client: R Name | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss |