Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp used mh Date: March 5, 2012 Permit status: Closed | Permit id: 12-00827 | |||||
SCORE 100 Wellington mhp used mh Date: March 5, 2012 Contractor: Energy Solutions Co Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00827 | Parcel: 24122 | |||||
SCORE 100 Wellington mhp used mh Date: March 5, 2012 Contractor: Bartlett Brothers Plumbing Con Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00827 | Parcel: 24122 | |||||
SCORE 88 Wellington mhp used mh Date: March 5, 2012 Contractor: Mountain Top Mobile Mover Client: Wellington Mhp Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-00827 | Parcel: 24122 | |||||
February 15, 2012 3:14:03 pm kneel. Wellington mhp - used mh, master approval 09-6160. Location: airport rd to wellington mhp.; february 27, 2012 9:16:07 am kneel. Addition of mechanical permit.; march 5, 2012 10:34:01 am jfortner. Wellington mhp - used mh, master approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requir Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00827 | Parcel: 24122 | |||||
February 15, 2012 3:14:03 pm kneel. Wellington mhp - used mh, master approval 09-6160. Location: airport rd to wellington mhp.; february 27, 2012 9:16:07 am kneel. Addition of mechanical permit.; march 5, 2012 10:34:01 am jfortner. Wellington mhp - used mh, master approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requir Date: March 5, 2012 Permit type: Permits - historical | Permit status: Closed | Permit id: 12-00827 | Parcel: 24122 |