Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Brazing of refrigerant piping on the roof and 1st floor interior of the renovation project associated with the new heating and cooling equipment. Bfd paid detail required Date: June 7, 2017 Contractor: Paul Obrien Client: Starr Sherman H | Permit type: Bfd cutting-burning-welding | Permit id: Cbw715865 | Parcel: 2200565000 | |||||
SCORE 82 Install new fire sprinkler system in existing construction single-story 3-unit commercial office building per npfa 13 2013. No sprinkler currently exists. Date: June 8, 2017 Contractor: Covenant Fire Protection Inc Client: Starr Sherman H | Permit type: Bfd sprinkler system | Permit id: Sprk712144 | Parcel: 2200565000 | |||||
Welding to be done at the german international school boston early education center located at 387 western ave. Includes reinforcing the sky lights using c6 channel as well as reinforcing the roof for the installation of hc units (dpl) bfd paid detail required Date: July 11, 2017 Client: Starr Sherman H | Permit type: Bfd cutting-burning-welding | Permit id: Cbw727676 | Parcel: 2200565000 |