Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Work on this demolition permit must commence within thirty (30) days of issuance and be completed sixty (60) days after commencement. This permit expires days after the permit is issued. Please call 811 before you dig. To demolish existing residence. Not to be burned on lot. Pursuant to ordinance no. 2006-1263 of the metropolitan code of laws, i (the holder on this permit) hereby certify that all construction and demolition waste generated by any and all activities governed by this permit shall be disposed of in an approved landfill. Further, i certify that no construction and demolition waste shall be stored on the property in violation of any provision of the metropolitan code. Permit type: Building demolition permit | Permit id: 201554266 | Parcel: 11701009800 | |||||
SCORE 88 To construct a new single family res at 4118 sqft with attached garage at 527 sqft with porches and decks... This is one of two single family houses on this property... See 2016-027999... Min 6 between houses... Sides min 10... Rear min 20... Front min 41. 5... Based on average... Max ht 3 stories and 423 .... Width at 339 ..... Need to comply with bl2014-7 which reads: the height of two detached dwelling units on a single lot cannot exceed a ratio of 1 horizontal to 1. 5 vertical for each structure. Maximum height shall be measured from the natural grade. The natural grade shall be determined based on the average elevation of most exterior corners of the front facade, to the very top of the structure.. Natural grade is the base ground elevation prior to grading. And definition of . Story means a portion of a building between the surface of any floor and the surface of the floor above it, or, if there is no floor above it, the space between such floor and the ceiling above it. A basement or cellar Permit type: Building residential - new | Permit id: 2016071108 | Parcel: 117010i00200co |