Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Equipment work Date: October 22, 2012 Contractor: Rb Htg Consulting Gpoup Permit status: Permit issued | Permit id: 42078007901 | |||||
SCORE 99 Plumbing Date: August 6, 2013 Contractor: Maxwell Plumb Mech. Corp Permit status: Permit issued | Permit id: 42078007902 | |||||
SCORE 100 Equipment work Date: October 22, 2012 Contractor: Par Plumbing Co., Inc Permit status: Permit issued | Permit id: 42078007901 | |||||
Please abate the following 1. East room1 aka:bedroom, ceiling dust wipe 130sqft. 2) east room (4) aka kitchen dust wipe. 3) (additional finding) Date: February 14, 2000 Value: $1,146 Permit type: Delead | Permit id: E017136 | |||||
Apt #3 kitchen install 1 window stop and screws. Date: October 7, 1999 Value: $111 Permit type: Gc | Permit id: E012244 | |||||
Apartment# 2e unclug stoppage in bathroom bathtub and wash basin. Date: August 21, 2002 Value: $93 Permit type: Plumb | Permit id: E303900 | |||||
As per the attached scope of work, scrub mildewed surfaces with a solution of one cup of chlorine bleach to one gallon of water. A detergent such as t Date: January 18, 2004 Permit type: Gc | Permit id: E413770 | |||||
(apt. #4b) install (5) window guards complete at livingroom (1), bedroom #1 (1), bedroom #2 (2) and bathroom (1). Remove all work related debris. Date: August 17, 2004 Permit type: Gc | Permit id: E506519 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: April 6, 2007 Permit type: Delead | Permit id: E726991 | |||||
Apartment #4b supply and install one (1) window guard complete in bathroom. Reinstall one (1) window guard with stops in livingroom. Reinstall thre Date: June 8, 2007 Value: $183 Permit type: Gc | Permit id: E732637 | |||||
Make proper adjustments to restore hot water temperature according to local codes, present temp. 1 degree. Date: June 17, 2008 Value: $89 Permit type: Plumb | Permit id: E835320 | |||||
L l-1 ( clean only ) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursuan Date: March 5, 2009 Value: $149 Permit type: Delead | Permit id: E929693 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 3, 2009 Permit type: Delead | Permit id: E928569 | |||||
Remove side entrance door on right side of building. Supply and install h. M. Door with frame complete with standard hardware (fire rated). Remove Date: February 9, 2000 Permit type: Gc | Permit id: E016364 | |||||
Apartment#e2: scrape, plaster and paint ceiling in livingroom from border up same color as is. Roof: cut out all blisters and air packets on entire Date: August 29, 2001 Permit type: Gc | Permit id: E203358 | |||||
Apartment# e3: locate and repair roof leak over apartment. Plaster patch ceiling in livingroom area sqft. Paint entire ceiling livingroom area 1 Date: September 7, 2001 Permit type: Gc | Permit id: E203921 | |||||
Apartment #1d: repair plaster ceiling in 3rd room from east approximately 12 square feet. Note: contractor must contact hpd @ (718) 636-3021, 63 Date: November 5, 2003 Permit type: Gc | Permit id: E406982 | |||||
T r concealed leak from above in bathroom. Scrape, plaster and paint damaged areas in bedroom of apt. 1d. Note: contractor must contact hpd @ (718) Date: January 28, 2004 Permit type: Gc | Permit id: E413453 | |||||
As per rc #20020011883 (emsl), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: November 9, 2002 Permit type: Delead | Permit id: E309069 | |||||
Erp ll 38 violation: as per rc #20020016278 (pdg) and attached scope of work thoroughly remove all lead violations as per new york city health secti Date: March 21, 2003 Permit type: Delead | Permit id: E318477 | |||||
As per rc #2002001188305 (emsl), perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method Date: May 27, 2003 Permit type: Delead | Permit id: E323192 | |||||
Erp ll 38 violation: as per rc #20020016278 (pdg) and attached scope of work thoroughly remove all lead violations as per new york city health sectio Date: November 18, 2002 Permit type: Delead | Permit id: E309078 | |||||
Apartment #3d: install sheetrock at ceiling of kitchen approx. 4 square feet; tape, compound, sand down to smooth finish. Plaster and paint entire k Date: August 27, 2004 Permit type: Gc | Permit id: E506060 | |||||
As per tertiary rc #20000018711 (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 Date: March 24, 2000 Permit type: Delead | Permit id: E018911 | |||||
Apartment #4b: trace, locate and repair all leaks in the bathroom. Replace parts as necessary. Replace g. W. B. Ceiling approx. 35 square feet; tape, Date: August 27, 2004 Permit type: Gc | Permit id: E506062 | |||||
At apt 4b bathroom: demo all loose plaster at ceiling approx. Sqft. Trace and make all necessary repairs to stop water leak from above. Repair Date: February 5, 2009 Permit type: Gc | Permit id: E923755 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 23, 2009 Permit type: Delead | Permit id: E931703 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 16, 2008 Permit type: Delead | Permit id: E919486 | |||||
Apt # 4d >>>> trace and repair the water leak from above at the bathroom ceiling. Replace the ceiling approx. 40sft with sheet rock. Tape, compoun Date: May 15, 2014 Permit type: Gc | Permit id: Ee23748 |