Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Heinmiller mh lot 34 Date: September 23, 2008 Permit status: Closed | Permit id: 08-04759 | |||||
SCORE 100 Heinmiller mh lot 34 Date: September 23, 2008 Contractor: Energy Solutions Co Client: Heinmiller Mh Lot 34 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04759 | Parcel: 20726 | |||||
Heinmiller mh lot 34 Client: Heinmiller Mh Lot 34 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04759 | Parcel: 20726 | |||||
August 13, 2008 12:29:25 pm kneel. Heinmiller-used mh to lot 34 location: fairview rd to onteora to janice dr.; september 23, 2008 10:50:22 am heatherr. Premise #redacted phone number9; september 23, 2008 1:13:44 pm kneel. Heinmiller-used mh to lot 34; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommen Permit type: Permits - historical | Permit status: Closed | Permit id: 08-04759 | Parcel: 20726 | |||||
August 13, 2008 12:29:25 pm kneel. Heinmiller-used mh to lot 34 location: fairview rd to onteora to janice dr.; september 23, 2008 10:50:22 am heatherr. Premise #redacted phone number9; september 23, 2008 1:13:44 pm kneel. Heinmiller-used mh to lot 34; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommen Date: September 23, 2008 Permit type: Permits - historical | Permit status: Closed | Permit id: 08-04759 | Parcel: 20726 |