Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 65 All work and occupancy during construction of fence must take place behind sidewalk. Pedestrians must have full unobstructed access to sidewalk. ![]() ![]() Permit status: Permit expired | Expiration date: February 25, 2006 | Permit id: Pa17425 | |||||
SCORE 100 Repair water main line in the roadway. ![]() ![]() Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 26, 2016 | Permit id: Pa122159 | |||||
SCORE 65 ![]() ![]() Permit status: 8 | Expiration date: February 25, 2006 | Permit id: Pa17425 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Expired | Expiration date: March 26, 2016 | Permit id: Pa10229517 | |||||
SCORE 100 Construction staging area ![]() ![]() Permit status: Permit expired | Expiration date: March 26, 2016 | Permit id: Pa10229517 | |||||
SCORE 100 Repair water main line in the roadway. ![]() ![]() Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 26, 2016 | Permit id: Pa122159 |