Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Excavation for exterior foundation waterproofing at front side of building. Contact miss utility to mark underground utility lines in area of proposed excavation. Installation of silt and construction fencing. Excavate from grade line down to footer at exterior front side of building in area highlighted in blue on detail exwp-18. After exposing wall, seal holes and cracks that may have formed within foundation wall. Scarify walls to remove any existing waterproofing or loose parging. Installation of parge coat as may be required. Installation of liquid cold-applied waterproofing membrane. Installation of protection course over newly installed waterproof membrane. After membrane has cured, perform water test, preferably with owner or designate representative present. After completion of successful water test, proceed to backfill, using mechanical tamper to compact soil. Add soil to raise grade and create slight slope away from house. Removal of construction fencing to complete. Date: November 12, 2015 Contractor: Chamberlinwashington Inc Client: Crescent Property Management Crescent Property Management | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601662 | |||||
SCORE 86 Excavation for exterior foundation waterproofing at front side of building. Contact miss utility to mark underground utility lines in area of proposed excavation. Installation of silt and construction fencing. Excavate from grade line down to footer at exterior front side of building in area highlighted in blue on detail exwp-18. After exposing wall, seal holes and cracks that may have formed within foundation wall. Scarify walls to remove any existing waterproofing or loose parging. Installation of parge coat as may be required. Installation of liquid cold-applied waterproofing membrane. Installation of protection course over newly installed waterproof membrane. After membrane has cured, perform water test, preferably with owner or designate representative present. After completion of successful water test, proceed to backfill, using mechanical tamper to compact soil. Add soil to raise grade and create slight slope away from house. Removal of construction fencing to complete. Date: November 12, 2015 Contractor: Chamberlinwashington, Inc Client: Crescent Property Management Crescent Property Management | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601662 |