Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 66 Remodel of north wing 6th floor at lds hospital Date: May 6, 2009 Permit status: Closed | Completion date: February 2, 2011 | Current use: Commercial | Permit id: Bld2009-02639 | |||||
SCORE 86 Lds hospital 7th floor joint center remodel. Date: July 2, 2009 Contractor: Cameron And Company Inclds Hospital Permit status: Closed | Completion date: March 3, 2010 | Current use: Commercial | Permit id: Bld2009-03860 | |||||
SCORE 64 Electrical for a remodel of north wing 6th floor at lds hospital. Date: July 8, 2009 Permit type: Electrical | Permit status: Closed | Completion date: February 2, 2011 | Current use: Commercial | Permit id: Bld2009-03981 | |||||
SCORE 64 Low voltage fire alarm Date: July 8, 2009 Permit type: Low voltage | Permit status: Closed | Completion date: December 10, 2009 | Current use: Commercial | Permit id: Bld2009-03983 | |||||
SCORE 59 Changing ductwork & 25 vav boxes, upgrades to ductwork, diffusers, & vav boxes. Date: July 9, 2009 Permit type: Mechanical | Permit status: Closed | Completion date: February 2, 2011 | Current use: Commercial | Permit id: Bld2009-04025 | |||||
SCORE 66 18 plumbing fixtures & 3 drains for remodel of north wing 6th floor at lds hospital Date: August 18, 2009 Permit type: Plumbing | Permit status: Closed | Completion date: February 2, 2011 | Current use: Commercial | Permit id: Bld2009-04931 | |||||
SCORE 66 Remodel level 1 endoscopy and imaging Date: September 14, 2009 Contractor: Cameron And Company Inclds Hospital 1st Flr Permit status: Closed | Completion date: November 29, 2011 | Current use: Commercial | Permit id: Bld2009-05561 | |||||
SCORE 59 Elec work for 7th floor joint center remodel. Date: September 25, 2009 Contractor: Alder Electric, Llclds Hospital Permit type: Electrical | Permit status: Closed | Completion date: March 1, 2010 | Current use: Commercial | Permit id: Bld2009-05844 | |||||
SCORE 86 Patient room restroom remodel for ada. Ui zone, interior work. Ka as Date: October 5, 2009 Contractor: Cameron And Company Inclds Hospital Permit status: Closed | Completion date: June 23, 2010 | Current use: Commercial | Permit id: Bld2009-06008 | |||||
SCORE 59 Change out diffusers on level 7 & installing 4 vav boxes Date: October 7, 2009 Contractor: Steed Hvac, Llclds Hospital Permit type: Mechanical | Permit status: Closed | Completion date: March 2, 2010 | Current use: Commercial | Permit id: Bld2009-06109 | |||||
SCORE 79 Fire sprinkler system. Date: October 21, 2009 Contractor: Fire Protection Serviceslds Hospital 7th Floor Permit type: Fire | Permit status: In for review | Completion date: October 21, 2009 | Current use: Commercial | Permit id: Bld2009-06448 | |||||
SCORE 79 Fire alarm Date: October 26, 2009 Contractor: Fire Protection Serviceslds Hospital 7th Floor Permit type: Low voltage | Permit status: Closed | Completion date: March 8, 2010 | Current use: Commercial | Permit id: Bld2009-06535 | |||||
SCORE 66 17 plumbing fixtures, 5 drains, 3 medical gas piping. Date: November 4, 2009 Permit type: Plumbing | Permit status: Closed | Completion date: December 9, 2011 | Current use: Commercial | Permit id: Bld2009-06775 | |||||
SCORE 66 17 plumbing fixtures, 5 drains, 3 medical gas piping. Date: November 4, 2009 Permit type: Plumbing | Permit status: Closed | Completion date: June 10, 2010 | Current use: Commercial | Permit id: Bld2009-06776 | |||||
SCORE 64 Cooling towers over hp or tons 3 replacements. Date: January 11, 2010 Contractor: Trex Inclds Cooling Tower Replacement Permit type: Mechanical | Permit status: Closed | Completion date: January 11, 2010 | Current use: Commercial | Permit id: Bld2010-00098 | |||||
SCORE 64 Fire sprinkler modifications Date: February 11, 2010 Permit type: Fire | Permit status: Closed | Completion date: March 10, 2010 | Current use: Commercial | Permit id: Bld2010-00715 | |||||
SCORE 59 Fire alarm modifications Date: February 26, 2010 Permit type: Low voltage | Permit status: Closed | Completion date: April 6, 2011 | Current use: Commercial | Permit id: Bld2010-01048 | |||||
SCORE 64 Elec work for cooling tower replacement project on 9th flr & roof. Date: March 1, 2010 Contractor: Dts Electric Llclds Cooling Tower Replacement Permit type: Electrical | Permit status: Closed | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2010-01057 | |||||
SCORE 66 93 plumbing fixtures, 1 water softener, 25 drains, 1 backflow preventor, & med gas piping for remodel level 1 endoscopy & imaging Date: March 10, 2010 Contractor: Marco R. Brunatti Associateslds Hospital 1st Flr Permit type: Plumbing | Permit status: Closed | Completion date: December 9, 2011 | Current use: Commercial | Permit id: Bld2010-01293 | |||||
SCORE 59 Install exhaust fan & 59 appliances for remodel level 1 endoscopy & imaging Date: March 12, 2010 Contractor: Steed Hvac, Llclds Hospital 1st Flr Permit type: Mechanical | Permit status: Closed | Completion date: February 2, 2011 | Current use: Commercial | Permit id: Bld2010-01358 | |||||
SCORE 59 Tenant improvement 3rd floor, same day surgery. 3rd floor interior remodel. Mechanical, electrical & plumbing permits reqd. K. A. Zone: a. H. Date: May 24, 2010 Permit status: Closed | Completion date: December 21, 2010 | Current use: Commercial | Permit id: Bld2010-03442 | |||||
SCORE 64 Fire sprinkler system. 1st floor Date: May 27, 2010 Contractor: First Fire Protection Inclds Hospital Permit type: Fire | Permit status: Inspections | Completion date: July 8, 2010 | Current use: Commercial | Permit id: Bld2010-03513 | |||||
SCORE 64 Low voltage fire alarm permit. Date: July 15, 2010 Permit type: Low voltage | Permit status: Inspections | Completion date: July 19, 2010 | Current use: Commercial | Permit id: Bld2010-04832 | |||||
SCORE 59 Fire sprinkler system. Date: August 4, 2010 Contractor: Fire Services, Inc.Lds Hospital Level 3 West Permit type: Fire | Permit status: Closed | Completion date: December 3, 2010 | Current use: Commercial | Permit id: Bld2010-05280 | |||||
SCORE 64 Electrical for tenant improvement 3rd floor, same day surgery. Date: August 19, 2010 Contractor: G And G Contractinglds Hospital Level 3 West Permit type: Electrical | Permit status: Closed | Completion date: December 3, 2010 | Current use: Commercial | Permit id: Bld2010-05672 | |||||
SCORE 66 Install 32 plumbing fixtures, 9 floor drains, & 3 medical gas piping tenant improvement 3rd floor, same day surgery. Date: August 20, 2010 Permit type: Plumbing | Permit status: Closed | Completion date: December 3, 2010 | Current use: Commercial | Permit id: Bld2010-05695 | |||||
SCORE 64 Interior remodel only 7th floor. K. A. Zone: ui zone, hospital. K. B. Date: October 6, 2010 Contractor: Bonneville Builders Lclds Hospital Permit status: Closed | Completion date: May 16, 2011 | Current use: Commercial | Permit id: Bld2010-06864 | |||||
SCORE 86 Relocation of existing patient rooms to create 4 bariatric patient rooms & toilet facilities. G. S. Zone: a. M. Date: October 6, 2010 Contractor: Cameron And Company Inclds Hospital Permit status: Closed | Completion date: January 3, 2011 | Current use: Commercial | Permit id: Bld2010-06865 | |||||
SCORE 64 Low voltage fire alarm permit. Date: October 21, 2010 Permit type: Low voltage | Permit status: Closed | Completion date: December 21, 2010 | Current use: Commercial | Permit id: Bld2010-07276 | |||||
SCORE 64 Remodeled area - existing sprinkler heads (approx. 55) shall be replaced with quick response heads and shall be offset as necessary to accomodate changes to ceiling layouts and or revised walls Date: November 15, 2010 Contractor: Interwest Fire Protectionlevel 7 East Remodel Permit type: Fire | Permit status: Inspections | Completion date: January 26, 2011 | Current use: Commercial | Permit id: Bld2010-07894 | |||||
SCORE 59 Fire sprinklers system. Date: November 16, 2010 Permit type: Fire | Permit status: Closed | Completion date: July 22, 2011 | Current use: Commercial | Permit id: Bld2010-07929 | |||||
SCORE 59 Interior electrical remodel Date: November 19, 2010 Permit type: Electrical | Permit status: Closed | Completion date: December 29, 2010 | Current use: Commercial | Permit id: Bld2010-08053 | |||||
SCORE 64 Installing 12 plumbing fixtures to 8th floor Date: November 22, 2010 Contractor: Reliable Plumbing And Heating Inclds Hospital Permit type: Plumbing | Permit status: Closed | Completion date: December 29, 2010 | Current use: Commercial | Permit id: Bld2010-08089 | |||||
SCORE 59 Install 4 vav boxes Date: November 23, 2010 Contractor: Steed Hvac, Llclds Hospital Bariatric Nursing Permit type: Mechanical | Permit status: Closed | Completion date: December 29, 2010 | Current use: Commercial | Permit id: Bld2010-08120 | |||||
SCORE 66 Power and lighting for tenant improvement on 7th floor Date: December 10, 2010 Contractor: Jp Electricallds Hospital Permit type: Electrical | Permit status: Closed | Completion date: May 13, 2011 | Current use: Commercial | Permit id: Bld2010-08510 | |||||
SCORE 66 26 plumbing fixtures, 7 drains, & med gas piping for 7th flr remodel Date: December 20, 2010 Contractor: Pipeline Plumbing And Mechanicallds Hospital Permit type: Plumbing | Permit status: Closed | Completion date: May 13, 2011 | Current use: Commercial | Permit id: Bld2010-08746 | |||||
SCORE 64 Addition and change to existing fire system Date: December 28, 2010 Contractor: Jp Electrical Lclds Hospital Permit type: Fire | Permit status: Closed | Completion date: May 13, 2011 | Current use: Commercial | Permit id: Bld2010-08863 | |||||
SCORE 100 Install 17 fan coils vav boxes Date: February 2, 2011 Contractor: Steed Hvac, Llc Permit type: Mechanical | Permit status: Closed | Completion date: May 13, 2011 | Current use: Commercial | Permit id: Bld2011-00655 | |||||
SCORE 59 2nd and 4th flr remodel g. S. A. H. T. I. 04 12 2011 Date: April 12, 2011 Permit status: Closed | Completion date: September 8, 2011 | Current use: Commercial | Permit id: Bld2011-02084 | |||||
SCORE 66 Interior nonsturctural demo of 2nd and 4th flr Date: May 4, 2011 Permit status: Closed | Completion date: March 25, 2013 | Current use: Commercial | Permit id: Bld2011-02559 | |||||
SCORE 66 Remodel of main lobby, gift shop, pharmacy, registration, cashier and cafe. Date: May 20, 2011 Contractor: Cameron And Company Inclds Hopsital Permit status: Closed | Completion date: April 10, 2012 | Current use: Commercial | Permit id: Bld2011-02919 | |||||
SCORE 64 Fire sprinkler modifications Date: June 9, 2011 Permit type: Fire | Permit status: Closed | Completion date: September 1, 2011 | Current use: Commercial | Permit id: Bld2011-03345 | |||||
SCORE 66 Install 56 vav boxes and 1 exhaust fan for 2nd and 4th flr remodel Date: June 13, 2011 Permit type: Mechanical | Permit status: Closed | Completion date: September 7, 2011 | Current use: Commercial | Permit id: Bld2011-03406 | |||||
SCORE 59 Elect work job bid 287,150. Date: June 14, 2011 Contractor: Tristar, Inc.Lds Hospital Permit type: Electrical | Permit status: Closed | Completion date: September 7, 2011 | Current use: Commercial | Permit id: Bld2011-03452 | |||||
SCORE 66 Install 122 fixtures, 1 dist piping, 1 waterline, 7 roof floor drains, 35 hose bibbs sillcocks, 3 medical gas piping for 2nd and 4th flr remodel Date: June 14, 2011 Permit type: Plumbing | Permit status: Closed | Completion date: September 7, 2011 | Current use: Commercial | Permit id: Bld2011-03457 | |||||
SCORE 64 Existing pipe and heads to be removed and replaced per spec. Existing riser and anti-freeze loop to remain. Existing system is gridded from two stairwells. System will not need to be hydraulically calulated per spec if similar to existing system. Date: July 18, 2011 Permit type: Fire | Permit status: Closed | Completion date: May 9, 2012 | Current use: Commercial | Permit id: Bld2011-04383 | |||||
SCORE 66 Low voltage fire alarm, 2nd and 4th flr remodel. Date: July 19, 2011 Permit type: Low voltage | Permit status: Closed | Completion date: September 1, 2011 | Current use: Commercial | Permit id: Bld2011-04413 | |||||
SCORE 66 Interior non-structural demolition only k. A. K. B. Date: August 4, 2011 Permit status: Closed | Completion date: April 8, 2013 | Current use: Commercial | Permit id: Bld2011-04846 | |||||
SCORE 74 Temp use for employee bbq Date: August 9, 2011 Contractor: Diamond Rentallds Hospital Permit type: Temporary use | Permit status: Closed | Completion date: August 9, 2011 | Permit id: Bld2011-04916 | |||||
SCORE 66 Elec work for interior demo and remodel, remodel work not to commence until building permit for lobby remodel has been issued. Fire alarm modifications to be authorized by seperate permit. Date: August 9, 2011 Contractor: Eagle Electric Inclds Hospital Main Lobby Permit type: Electrical | Permit status: Closed | Completion date: April 9, 2012 | Current use: Commercial | Permit id: Bld2011-04941 | |||||
SCORE 64 Install flat sign Date: August 29, 2011 Contractor: Yesco Llcpromise Hospital Of Salt Lake Permit type: Sign | Permit status: Closed | Completion date: August 29, 2011 | Permit id: Bld2011-05471 | |||||
SCORE 64 Low volatage fire alarm. Date: August 30, 2011 Contractor: Fire Protection Services Corporationlds Hopsital Permit type: Low voltage | Permit status: Closed | Completion date: April 10, 2012 | Current use: Commercial | Permit id: Bld2011-05511 | |||||
SCORE 66 18 plumbing fixtures, 4 drains for main lobby bathroom remodel. Date: September 14, 2011 Contractor: Pipeline Plumbing And Mechanicallds Hopsital Permit type: Plumbing | Permit status: Closed | Completion date: April 6, 2012 | Current use: Commercial | Permit id: Bld2011-05878 | |||||
SCORE 74 Installing temp structure (awning for walkway). Fire dept approval reqd. Date: October 6, 2011 Contractor: Diamond Rentallds Hospital Permit type: Temporary use | Permit status: Closed | Completion date: October 6, 2011 | Permit id: Bld2011-06451 | |||||
SCORE 59 Install appliances and 1 cooling tower Date: October 7, 2011 Contractor: Steed Hvac, Llclds Hopsital Permit type: Mechanical | Permit status: Closed | Completion date: April 5, 2012 | Current use: Commercial | Permit id: Bld2011-06470 | |||||
SCORE 66 Interior remodel of mri reception area l. L. A. M. Date: November 16, 2011 Permit status: Closed | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-07540 | |||||
SCORE 66 Interior remodel k. A. Ui zone, not historic, interior work a. S. Date: November 18, 2011 Contractor: Ihc Health Services Inclds Hospital Ed Triage Permit status: Closed | Completion date: September 7, 2012 | Current use: Commercial | Permit id: Bld2011-07639 | |||||
SCORE 64 Tenant improvement, mech, elec & plmbg permits reqd k. A. A. H. T. I. Date: January 27, 2012 Permit status: Inspections | Completion date: April 30, 2012 | Current use: Commercial | Permit id: Bld2012-00755 | |||||
SCORE 66 Elec work for remodel. Date: February 9, 2012 Contractor: Ihc Health Serviceslds Hospital Ed Triage Permit type: Electrical | Permit status: Closed | Completion date: October 29, 2013 | Current use: Commercial | Permit id: Bld2012-01123 | |||||
SCORE 64 We are remodeling the existing cafeteria. Existing booths and banquets, finishes, and ceiling will be removed. New banquets, booths, finishes, and ceiling will be installed. Date: April 19, 2012 Permit status: Closed | Completion date: September 13, 2012 | Current use: Commercial | Permit id: Bld2012-02844 | |||||
SCORE 64 Remodel of adminstation offices fire alarm (5 9 12) Date: May 9, 2012 Permit type: Fire | Permit status: Inspections | Completion date: August 27, 2012 | Current use: Commercial | Permit id: Bld2012-03386 | |||||
SCORE 59 Tenant improvement, elec permits - admin offices. Date: May 9, 2012 Permit type: Electrical | Permit status: Closed | Completion date: August 2, 2012 | Current use: Commercial | Permit id: Bld2012-03396 | |||||
SCORE 66 Interior remodel of approximately 9,9 s. F. Of existing patient room space located on the 6th floor north portion of the hospital for a 12 bed medical detoxification unit. This unit will provide two patient rooms with medical beds, two accessible patient rooms with the remainder being general patient rooms. Date: May 14, 2012 Permit status: Closed | Completion date: November 14, 2012 | Current use: Commercial | Permit id: Bld2012-03492 | |||||
SCORE 64 Add and relocate of existing fire sprinkler heads. 5 29 Date: May 30, 2012 Permit type: Fire | Permit status: Closed | Completion date: August 9, 2012 | Current use: Commercial | Permit id: Bld2012-03921 | |||||
SCORE 66 T. I. Date: August 30, 2012 Permit type: Fire | Permit status: Closed | Completion date: November 13, 2012 | Current use: Commercial | Permit id: Bld2012-06467 | |||||
SCORE 66 Fire alarm upgrade to 6th floor Date: November 1, 2012 Permit type: Low voltage | Permit status: Closed | Completion date: November 14, 2012 | Current use: Commercial | Permit id: Bld2012-08124 | |||||
SCORE 59 Phase 1 work - relocate approx. Sprinklers due to ceiling demolition and infrastructure upgrades throughout basement level communications equipment server room. Date: January 8, 2013 Permit type: Fire | Permit status: Inspections | Completion date: January 24, 2013 | Current use: Commercial | Permit id: Bld2013-00129 | |||||
SCORE 59 Lds hospital third floor pre-op remodel involving approximately 15 heads to be added and or respaced to maintain proper coverage in remodeled area. Date: January 25, 2013 Contractor: Interwest Fire Protectionlds Hospital Preop Ti Permit type: Fire | Permit status: Closed | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-00463 | |||||
SCORE 59 Remodel existing pre-op rooms Date: February 4, 2013 Permit type: Plumbing | Permit status: Closed | Completion date: April 10, 2013 | Current use: Commercial | Permit id: Bld2013-00654 | |||||
SCORE 66 Remodel of a nuc camera and nuc treadmill rooms into a ct scanner room Date: February 15, 2013 Permit status: Closed | Completion date: May 10, 2013 | Current use: Commercial | Permit id: Bld2013-00863 | |||||
SCORE 66 Remodeling an existing portion of the hospital into a gym and wellness center for the staff at the hospital. Date: February 22, 2013 Permit status: Closed | Completion date: July 23, 2013 | Current use: Commercial | Permit id: Bld2013-00999 | |||||
SCORE 59 Relocating the existing library to a new location in the hospital. Date: March 5, 2013 Permit status: Closed | Completion date: July 1, 2013 | Current use: Commercial | Permit id: Bld2013-01255 | |||||
SCORE 64 Remodel of hte pugh board room at lds hospital Date: March 13, 2013 Permit status: Closed | Completion date: July 11, 2013 | Current use: Commercial | Permit id: Bld2013-01447 | |||||
SCORE 64 Furnish and install 8 vav boxes Date: March 28, 2013 Contractor: Lds Hospital Permit type: Mechanical | Permit status: Closed | Completion date: April 4, 2013 | Current use: Commercial | Permit id: Bld2013-01850 | |||||
SCORE 59 Electrical up to 10,000. Job bid 8,000. Remodel of a nuc camera and nuc treadmill rooms into a ct scanner room Date: May 8, 2013 Permit type: Electrical | Permit status: Closed | Completion date: May 10, 2013 | Current use: Commercial | Permit id: Bld2013-02948 | |||||
SCORE 66 Fire alarm upgrade to the lds hospital wellness center. Date: May 15, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: July 22, 2013 | Current use: Commercial | Permit id: Bld2013-03137 | |||||
SCORE 66 Fire alarm upgrade to lds hospital library Date: May 15, 2013 Contractor: Fire Protection Serviceslds Hospital Library Permit type: Low voltage | Permit status: Closed | Completion date: July 8, 2013 | Current use: Commercial | Permit id: Bld2013-03138 | |||||
SCORE 66 Electrical for wellness ti at lds hospital Date: May 17, 2013 Contractor: Bdb Electricwellness Center Permit type: Electrical | Permit status: Closed | Completion date: July 23, 2013 | Current use: Commercial | Permit id: Bld2013-03205 | |||||
SCORE 64 Hvac for saunders construction Date: May 17, 2013 Permit type: Mechanical | Permit status: Closed | Completion date: July 18, 2013 | Current use: Commercial | Permit id: Bld2013-03208 | |||||
SCORE 66 Plumbing of new restrooms and locker rooms for employee use, in wellness center. Date: May 20, 2013 Permit type: Plumbing | Permit status: Inspections | Completion date: July 18, 2013 | Current use: Commercial | Permit id: Bld2013-03230 | |||||
SCORE 59 Electrical remodel of library Date: May 20, 2013 Permit type: Electrical | Permit status: Closed | Completion date: June 28, 2013 | Current use: Commercial | Permit id: Bld2013-03248 | |||||
SCORE 64 3-vav boxes Date: May 22, 2013 Permit type: Mechanical | Permit status: Closed | Completion date: July 1, 2013 | Current use: Commercial | Permit id: Bld2013-03378 | |||||
SCORE 59 Rough in electrical Date: June 7, 2013 Contractor: Arco Electric, Inc.Lds Hospital Pugh Boardroom Permit type: Electrical | Permit status: Closed | Completion date: July 11, 2013 | Current use: Commercial | Permit id: Bld2013-03799 | |||||
SCORE 66 The 7th floor psychiatric unit remodel in the lds hospital is a complete remodel project to create a new 34-bed psychiatric unit with patient and staff support functions. All patient rooms are single occupancy and serving patients 18 years and older. This project not only increases the number of licensed psychiatric beds, but it also updates the patient environment to current safety standards and technology appropriate for the care of this type of patient. The design minimizes hiding corners, shortens travel themselves or others. The unit has been designed as an i-2 area of the hospital. Date: November 1, 2013 Permit status: Inspections | Completion date: March 28, 2014 | Current use: Commercial | Permit id: Bld2013-08119 | |||||
SCORE 64 Fire alarm remodel in the womens center Date: December 2, 2013 Permit type: Low voltage | Permit status: Closed | Completion date: January 27, 2014 | Current use: Commercial | Permit id: Bld2013-08860 | |||||
SCORE 64 Fire alarm remodel of psychiatric unit. Date: February 13, 2014 Permit type: Low voltage | Permit status: Inspections | Completion date: March 31, 2014 | Current use: Commercial | Permit id: Bld2014-00964 | |||||
SCORE 59 7th floor electrical upgrade Date: February 14, 2014 Permit type: Electrical | Permit status: Closed | Completion date: October 14, 2014 | Current use: Commercial | Permit id: Bld2014-00993 | |||||
SCORE 59 Low voltage alarm Date: February 18, 2014 Permit type: Low voltage | Permit status: Closed | Completion date: October 14, 2014 | Current use: Commercial | Permit id: Bld2014-01038 | |||||
SCORE 64 Furnsh and install hvac ductwork, vav boxes, spit system, grilles, diffusers, exh fans. Date: March 28, 2014 Permit type: Mechanical | Permit status: Closed | Completion date: January 15, 2015 | Current use: Commercial | Permit id: Bld2014-02002 | |||||
SCORE 64 Remodel of the 7th floor adding restrooms and exam sinks Date: April 2, 2014 Permit type: Plumbing | Permit status: Closed | Completion date: October 8, 2014 | Current use: Commercial | Permit id: Bld2014-02082 | |||||
SCORE 66 Fire sprinkler system Date: April 16, 2014 Contractor: Preferred Fire Protection Inclds Hospital Permit type: Fire | Permit status: Closed | Completion date: October 15, 2014 | Current use: Commercial | Permit id: Bld2014-02483 | |||||
SCORE 64 Re-use existing fuel tank enclosure for a steam generator, raise walls & add a flat roof deck t. B. Ui zone, not historic, location is in buildable area a. S. Date: August 26, 2014 Permit status: Closed | Completion date: April 13, 2015 | Current use: Commercial | Permit id: Bld2014-06200 | |||||
SCORE 77 1 floor sink, add 1- additional floor sink, 1-sink, 2-roof drains Date: September 12, 2014 Contractor: Vo Brothers Mechanical Llclds Hospital Permit type: Plumbing | Permit status: Closed | Completion date: April 2, 2015 | Current use: Commercial | Permit id: Bld2014-06658 | |||||
SCORE 64 Boiler plant electrical Date: September 19, 2014 Permit type: Electrical | Permit status: Closed | Completion date: March 20, 2015 | Current use: Commercial | Permit id: Bld2014-06852 | |||||
SCORE 66 Area of tenant improvement remodel to be located in the existing lds hospital, level 03, northwest wing. Remodel construction: existing floor, walls and ceiling fire ratings to remain and repaired as needed. Existing penetrations in rated wall and floor systems to be sealed with an approved ul design. All new interior wall construction to be non-load bearing cold rolled steel framing with gypsum board per assigned wall type. Date: September 29, 2014 Permit status: Closed | Completion date: June 18, 2015 | Current use: Commercial | Permit id: Bld2014-07073 | |||||
SCORE 64 Fire alarm monitor modules for new riser Date: October 2, 2014 Contractor: Lds Hospital Pob Permit type: Low voltage | Permit status: Closed | Completion date: November 13, 2014 | Current use: Commercial | Permit id: Bld2014-07167 | |||||
SCORE 66 Fire alarm installation Date: January 5, 2015 Contractor: Lds Hospital Boiler Room Permit type: Low voltage | Permit status: Closed | Completion date: February 9, 2015 | Current use: Commercial | Permit id: Bld2015-00057 | |||||
SCORE 77 1-suspended heater, 1-boiler, 1-cooler Date: January 12, 2015 Contractor: Vo Brothers Mechanical Llclds Hospital Permit type: Mechanical | Permit status: Closed | Completion date: April 9, 2015 | Current use: Commercial | Permit id: Bld2015-00209 | |||||
SCORE 59 Remodel for the lds 3rd floor: install 1 eru air handler and supply fan install (4) fire dampers, 14 vav boxes with associate duct work Date: January 13, 2015 Permit type: Mechanical | Permit status: Closed | Completion date: June 17, 2015 | Current use: Commercial | Permit id: Bld2015-00236 | |||||
SCORE 64 Remodel northeast corner 3rd floor sewer and waterlines, install new plumbing fixtures Date: February 25, 2015 Permit type: Plumbing | Permit status: Closed | Completion date: June 3, 2015 | Current use: Commercial | Permit id: Bld2015-01274 | |||||
SCORE 59 Remodel of 3rd floor, ihc lds hospital Date: March 6, 2015 Contractor: B. D. B. Electric, Inc.Ihc Simulation Center Permit type: Electrical | Permit status: Closed | Completion date: May 29, 2015 | Current use: Commercial | Permit id: Bld2015-01483 | |||||
SCORE 79 Awning & 4 directional signs Date: March 9, 2015 Contractor: Ig Group Llcintermountain Health Care Permit type: Sign | Permit status: Closed | Completion date: March 25, 2015 | Permit id: Bld2015-01535 | |||||
SCORE 59 Approximately 11,0 square feet. Removal of an existing icu in 7th floor east wing of lds hospital and a remodel of that space for a new bmt clinic. Interior improvements only, no exterior work to be done. Date: March 10, 2015 Contractor: Hunt Construction Of Utah, Incbmt Clinic Remodel Permit status: Closed | Completion date: November 3, 2015 | Current use: Commercial | Permit id: Bld2015-01563 | |||||
SCORE 79 Wall sign @ 3 n c st Date: March 11, 2015 Contractor: Ig Group Llcintermountain Health Care Permit type: Sign | Permit status: Closed | Completion date: March 25, 2015 | Permit id: Bld2015-01592 | |||||
SCORE 64 Fire alarm installation Date: March 12, 2015 Contractor: Lds Hospital Simulation Center Permit type: Low voltage | Permit status: Closed | Completion date: June 3, 2015 | Current use: Commercial | Permit id: Bld2015-01617 | |||||
SCORE 69 Fire sprinkler plans. Date: March 30, 2015 Contractor: Quality Fire Protection Incihc Simulation Center Permit type: Fire | Permit status: Inspections | Completion date: July 21, 2015 | Current use: Commercial | Permit id: Bld2015-02073 | |||||
SCORE 59 Does not include ductwork fees. Vav s only lds hospital 7th floor - demo and install 31 - dual duct vav boxes, 16 fd with duct access doors, ductwork as per plans. Install new grds and manual volume dampers Date: May 5, 2015 Contractor: Steed Hvac, Llclds Bone Marrow Transplant Ti Permit type: Mechanical | Permit status: Closed | Completion date: October 30, 2015 | Current use: Commercial | Permit id: Bld2015-03107 | |||||
SCORE 69 Plumbing permit mop sink 13x sinks water closet removal of an existing icu in 7th floor east wing of lds hospital Date: May 12, 2015 Permit type: Plumbing | Permit status: Closed | Completion date: October 19, 2015 | Current use: Commercial | Permit id: Bld2015-03345 | |||||
SCORE 92 Remodel two rooms on the first floor Date: June 2, 2015 Contractor: Tom Stevens Construction Inc Permit status: Closed | Completion date: September 30, 2015 | Current use: Commercial | Permit id: Bld2015-03879 | |||||
SCORE 64 Mailed out 6-29-15 fire sprinkler systems Date: June 8, 2015 Permit type: Fire | Permit status: Closed | Completion date: October 12, 2015 | Current use: Commercial | Permit id: Bld2015-04054 | |||||
SCORE 64 Bmt clinic remodel interior electrical improvements only, no exterior work to be done. Date: July 8, 2015 Contractor: Jordan Valley Electric Inclds Bmt Permit type: Electrical | Permit status: Closed | Completion date: October 19, 2015 | Current use: Commercial | Permit id: Bld2015-05081 | |||||
SCORE 61 Fire alarm install Date: August 14, 2015 Permit type: Low voltage | Permit status: Inspections | Completion date: September 1, 2015 | Current use: Commercial | Permit id: Bld2015-06488 |