SCORE 100 Repair overhead capacitor bank in alley between pine and spruce. Date: March 1, 2005 Contractor: Xcel Energy Client: Harley Lyons | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Total tear-off & reroof of sfd, 14. 5 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Date: December 17, 2013 Contractor: Viking Roofing Inc Client: Spruce 2541.0 | Applicant: Viking Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family d | |||||
SCORE 100 Total tear-off & reroof of sfd, 14. 5 squares of asphalt shingles on a pitch represented as 5 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed - see section r907. 3 (specifically item 4) of 2006 irc. Mid-roof inspection required if pitch is less than 4 12. Client: Spruce | Permit type: Roofing | Permit status: Cmp | Completion date: April 6, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-07074 | |||||
Repair overhead capacitor bank in alley between pine and spruce. Date: March 1, 2005 Client: Harley Lyons | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2005-00672 |