Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Access manholes for inspections of utility Date: February 21, 2012 Contractor: Commonwealth Edison Permit id: Row20121133 | |||||
SCORE 93 Spot utilities in turn lane off peryville onto wb newburg for fiber optic project Date: October 22, 2008 Contractor: Kirby Cable Service Permit id: Row20081039 | |||||
SCORE 93 Hydrant dig up Date: August 4, 2011 Contractor: Rockford Water Division Permit id: Row20111879 | |||||
SCORE 100 Access manholes for inspections of utility Date: February 21, 2012 Contractor: Commonwealth Edison Permit id: Row20121133 | |||||
Repair roof and decking Date: October 24, 2008 Value: $200 Client: Johnson, Catherine | Permit id: Sfd20081066 | |||||
SCORE 56 Repair roof and decking Client: Johnson, Catherine | Permit id: Sfd20081066 | |||||
SCORE 56 Repair roof and decking Client: Johnson, Catherine | Permit id: Sfd20081066 | |||||
Complete tear off and re-roof Date: October 27, 2008 Value: $6,440 Permit id: Sfd20081082 | |||||
Btu, 95% Date: December 7, 2009 Value: $3,627 Permit id: Mech20092622 | |||||
SCORE 82 Complete tear off and re-roof Permit id: Sfd20081082 | |||||
SCORE 93 Btu, 95% Permit id: Mech20092622 | |||||
SCORE 82 Complete tear off and re-roof Permit id: Sfd20081082 | |||||
SCORE 93 Btu, 95% Client: Kellogg, Toby & Kirsti | Permit id: Mech20092622 | |||||
SCORE 93 Repair service leak Date: October 29, 2008 Contractor: Rockford Water Division Permit id: Row20081050 | |||||
SCORE 56 Replacing garage roof that was falling in and rotten wood decking Client: Elite Properties & Management, L.E. Morgan | Permit id: Sfd20081148 | |||||
Replacing garage roof that was falling in and rotten wood decking Date: November 6, 2008 Value: $3,500 Permit id: Sfd20081148 | |||||
SCORE 56 Replacing garage roof that was falling in and rotten wood decking Permit id: Sfd20081148 | |||||
SCORE 99 Hand dig two locations Date: November 14, 2008 Contractor: At And T Permit id: Row20081108 | |||||
SCORE 100 Intall 12 kvar cap bank on feeder r6088 Date: December 14, 2011 Contractor: Commonwealth Edison Permit id: Row20111661 | |||||
SCORE 100 Intall 12 kvar cap bank on feeder r6088 Date: December 14, 2011 Contractor: Commonwealth Edison Permit id: Row20111661 | |||||
SCORE 99 Hand dig two locations Date: November 14, 2008 Contractor: At And T Permit id: Row20081108 | |||||
SCORE 96 Re-route a 2" steel in storm sewer Date: December 1, 2008 Contractor: Nicor Gas Permit id: Row20081175 | |||||
SCORE 93 Emergency main break Date: December 17, 2008 Contractor: Rockford Water Division Permit id: Row20081216 | |||||
Signs now - complete tear off and re-roof (permit fees were reduced to 52. Per tc 3/2/10, building caught on fire shortly after permit was issued) Date: March 9, 2009 Value: $12,000 Client: Signs Now, Tim Anderson | Permit id: Mulcom20091133 | |||||
(electrical) "signs now" - fire repairs: (13) circuits, existing panels and replace any damaged conduit & conductors. Plan review # 09-0501. . Date: May 26, 2009 Client: Signs Now, Tim Anderson | Permit id: Elect20091294 | |||||
SCORE 93 Plan review # 09-0501. Remodel office area due to fire damage. Full scope attached to permit application. Client: Signs Now, Tim Anderson | Permit id: Mulcom20091265 | |||||
5 ton rtu, misc ductwork Date: June 1, 2009 Value: $13,600 Client: Signs Now, Tim Anderson | Permit id: Mech20091622 | |||||
Plan review # 09-0501. Remodel office area due to fire damage. Full scope attached to permit application. 3 lavs, 3 wc, gal wh Date: August 10, 2009 Client: Signs Now, Tim Anderson | Permit id: Plum20091298 | |||||
SCORE 89 (electrical) "signs now" - fire repairs: (13) circuits, existing panels and replace any damaged conduit & conductors. Plan review # 09-0501. . Date: May 26, 2009 Contractor: Gauerke Gene Client: Signs Now, Tim Anderson | Permit id: Elect20091294 | |||||
SCORE 89 Signs now - complete tear off and re-roof (permit fees were reduced to 52. Per tc 3/2/10, building caught on fire shortly after permit was issued) Client: Signs Now, Tim Anderson | Permit id: Mulcom20091133 | |||||
SCORE 89 Plan review # 09-0501. Remodel office area due to fire damage. Full scope attached to permit application. 3 lavs, 3 wc, gal wh Date: August 10, 2009 Contractor: Davis Dennis Client: Signs Now, Tim Anderson | Permit id: Plum20091298 | |||||
SCORE 96 5 ton rtu, misc ductwork Client: Signs Now, Tim Anderson | Permit id: Mech20091622 | |||||
SCORE 89 Signs now - complete tear off and re-roof (permit fees were reduced to 52. Per tc 3 2 10, building caught on fire shortly after permit was issued) Client: Signs Now, Tim Anderson | Permit id: Mulcom20091133 | |||||
SCORE 96 5 ton rtu, misc ductwork Client: Signs Now, Tim Anderson | Permit id: Mech20091622 | |||||
SCORE 89 (electrical) "signs now" - fire repairs: (13) circuits, existing panels and replace any damaged conduit & conductors. Plan review # 09-0501. . Date: May 26, 2009 Contractor: Gauerke, Gene Client: Signs Now, Tim Anderson | Permit id: Elect20091294 | |||||
SCORE 89 Plan review # 09-0501. Remodel office area due to fire damage. Full scope attached to permit application. 3 lavs, 3 wc, gal wh Date: August 10, 2009 Contractor: Davis, Dennis Client: Signs Now, Tim Anderson | Permit id: Plum20091298 | |||||
SCORE 93 Emergency repair main break Date: January 23, 2009 Contractor: Rockford Water Division Permit id: Row20091055 | |||||
Replace furnace/ac add humidifier Date: January 28, 2009 Value: $7,400 Client: Kunkel, Mary Ann | Permit id: Mech20091089 | |||||
Redo service to 1 amp. Same electric panel. Move meter to outside Date: November 7, 2011 Value: $900 Client: Kunkel, Mary Ann | Permit id: Elect20111728 | |||||
SCORE 89 Replace furnace/ac add humidifier Client: Kunkel, Mary Ann | Permit id: Mech20091089 | |||||
SCORE 96 Redo service to 1 amp. Same electric panel. Move meter to outside Client: Kunkel, Mary Ann | Permit id: Elect20111728 | |||||
SCORE 96 Redo service to 1 amp. Same electric panel. Move meter to outside Client: Kunkel, Mary Ann | Permit id: Elect20111728 | |||||
SCORE 89 Replace furnace ac add humidifier Client: Kunkel, Mary Ann | Permit id: Mech20091089 | |||||
SCORE 100 Alteration to business identification freestanding monument sign, illuminated Date: February 5, 2009 Contractor: Signs Now Permit id: Mulcom20091002 | |||||
SCORE 93 Repair service leak Date: September 8, 2009 Contractor: Rockford Water Division Permit id: Row20092074 | |||||
SCORE 100 New business identification wall sign to be installed on brackets from a previous sign Date: February 5, 2009 Contractor: Signs Now Permit id: Mulcom20091034 | |||||
SCORE 96 Install 10 of 2" pe Date: March 19, 2009 Contractor: Nicor Gas Permit id: Row20091252 | |||||
95% 60,0 btu furnace replacement Date: March 26, 2009 Value: $4,390 Client: Strawser, Cathleen | Permit id: Mech20091352 | |||||
Gal gas 24 hour notice not provided by contractor Date: November 22, 2010 Value: $745 Client: Strawser, Cathleen | Permit id: Plum20102138 | |||||
SCORE 83 95% 60,0 btu furnace replacement Client: Strawser, Cathleen | Permit id: Mech20091352 | |||||
SCORE 96 Gal gas 24 hour notice not provided by contractor Client: Strawser, Cathleen | Permit id: Plum20102138 | |||||
SCORE 96 Gal gas 24 hour notice not provided by contractor Client: Strawser, Cathleen | Permit id: Plum20102138 | |||||
SCORE 83 95% 60,0 btu furnace replacement Client: Strawser, Cathleen | Permit id: Mech20091352 | |||||
Removed existing window and replaced w/patio door. Date: March 27, 2009 Value: $400 Client: Saada, Ala | Permit id: Sfd20091165 | |||||
SCORE 56 Removed existing window and replaced w/patio door. Client: Saada, Ala | Permit id: Sfd20091165 | |||||
SCORE 56 Removed existing window and replaced w patio door. Client: Saada, Ala | Permit id: Sfd20091165 | |||||
SCORE 64 4 wood fence in side yard , 6 wood fence in rear yard Client: Denk, Tim | Permit id: Sfd20111557 | |||||
Siding house and garage. Date: April 6, 2009 Value: $6,000 Client: Denk, Tim | Permit id: Misc20091044 | |||||
Deck 14 by 14 with stairs all around except west side of deck railing Date: April 14, 2010 Value: $1,200 Client: Denk, Tim | Permit id: Sfd20101369 | |||||
SCORE 82 Repair cob Date: March 15, 2011 Contractor: Rockford Water Dist Permit id: Row20111225 | |||||
6 by 12 deck upper w/staircase to lower deck Date: March 29, 2011 Value: $1,500 Client: Denk, Tim | Permit id: Sfd20111189 | |||||
4 wood fence in side yard , 6 wood fence in rear yard Date: May 16, 2011 Value: $1,500 Client: Denk, Tim | Permit id: Sfd20111557 | |||||
SCORE 56 Siding house and garage. Client: Denk, Tim | Permit id: Misc20091044 | |||||
SCORE 62 Deck 14 by 14 with stairs all around except west side of deck railing Client: Denk, Tim | Permit id: Sfd20101369 | |||||
SCORE 62 6 by 12 deck upper w/staircase to lower deck Client: Denk, Tim | Permit id: Sfd20111189 | |||||
SCORE 64 4 wood fence in side yard , 6 wood fence in rear yard Client: Denk, Tim | Permit id: Sfd20111557 | |||||
SCORE 56 Siding house and garage. Client: Denk, Tim | Permit id: Misc20091044 | |||||
SCORE 62 Deck 14 by 14 with stairs all around except west side of deck railing Client: Denk, Tim | Permit id: Sfd20101369 | |||||
SCORE 62 6 by 12 deck upper w staircase to lower deck Client: Denk, Tim | Permit id: Sfd20111189 | |||||
Complete tear off and re-roof. Date: April 16, 2009 Value: $4,500 Client: Mote, Susan | Permit id: Sfd20091295 | |||||
SCORE 81 Complete tear off and re-roof. Client: Mote, Susan | Permit id: Sfd20091295 | |||||
SCORE 81 Complete tear off and re-roof. Client: Mote, Susan | Permit id: Sfd20091295 | |||||
Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Date: April 20, 2009 Value: $25,600 Client: Swedish American Realty, Mike King | Permit id: Mulcom20091205 | |||||
(electrical) "p & h" - 6th floor conference room, (9) lights and (10) receptacles. Separate 975 sf room into 2 rooms. Date: April 23, 2009 Client: Swedish American Realty, Mike King | Permit id: Elect20091223 | |||||
Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Fire suppression for 1024 sq, heads Date: May 14, 2009 Value: $2,848 Client: Swedish American Realty, Mike King | Permit id: Plum20091227 | |||||
Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Date: May 27, 2009 Value: $24,700 Client: Swedish American Realty, Mike King | Permit id: Mulcom20091340 | |||||
Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Relocating a few diffusers Date: June 10, 2009 Client: Swedish American Realty, Mike King | Permit id: Mech20091423 | |||||
Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Date: June 23, 2009 Client: Swedish American Realty, Mike King | Permit id: Mech20091604 | |||||
(electrical) "camelot towers - bsmt a4" - basement office remodel, alarm addition to system. Plan review 09-0513. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets. Date: June 23, 2009 Client: Swedish American Realty, Mike King | Permit id: Elect20091363 | |||||
65 sq. Ft. 52 sprinkler heads 10,368 value Date: July 17, 2009 Value: $10,368 Client: Camelot Towers | Permit id: Plum20091511 | |||||
SCORE 99 Directional bore 163 under sidewalk on w side of williams park - under state st and west under regan Date: April 12, 2010 Contractor: At And T Permit id: Row20101477 | |||||
Camelot sprinklers only - 3rd & 8th floors Date: May 20, 2010 Value: $13,105 Client: Camelot Towers | Permit id: Plum20101345 | |||||
SCORE 72 Verizon antenna upgrade. New antenna and associated electrical. Building plan review#10-0508. Client: Vzw | Permit id: Mulcom20101306 | |||||
SCORE 99 Accessing the manhole. Date: August 18, 2010 Contractor: At And T Permit id: Row20102246 | |||||
Fire suppression 9th floor - 81 heads Date: February 10, 2011 Value: $17,957 Client: Camelot Towers | Permit id: Plum20111104 | |||||
Sprinklers - 116 heads Date: February 6, 2012 Value: $29,922 Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20121101 | |||||
Fire suppression 8th fl - 64 heads Date: November 26, 2012 Value: $18,373 Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20122144 | |||||
SCORE 77 Adding (3) new ltd antennas to existing tower. Plan review 12-1206electrical child plan review fees not paid - no electrical work is to be started until an electrician registered with the city of rockford applies for and receives an electrical permit. Permit id: Mulcom20122134 | |||||
SCORE 93 (electrical) "p & h" - 6th floor conference room, (9) lights and (10) receptacles. Separate 975 sf room into 2 rooms. Date: April 23, 2009 Contractor: Pierce Steve Client: Swedish American Realty, Mike King | Permit id: Elect20091223 | |||||
SCORE 93 (electrical) "camelot towers - bsmt a4" - basement office remodel, alarm addition to system. Plan review 09-0513. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets. Date: June 23, 2009 Contractor: Pierce Steve Client: Swedish American Realty, Mike King | Permit id: Elect20091363 | |||||
SCORE 93 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Relocating a few diffusers Date: June 10, 2009 Contractor: Gastel Judd Client: Swedish American Realty, Mike King | Permit id: Mech20091423 | |||||
SCORE 64 Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Date: June 23, 2009 Contractor: Arndt Jessie Client: Swedish American Realty, Mike King | Permit id: Mech20091604 | |||||
SCORE 59 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Client: Swedish American Realty, Mike King | Permit id: Mulcom20091205 | |||||
SCORE 93 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Fire suppression for 1024 sq, heads Client: Swedish American Realty, Mike King | Permit id: Plum20091227 | |||||
SCORE 93 65 sq. Ft. 52 sprinkler heads 10,368 value Client: Camelot Towers | Permit id: Plum20091511 | |||||
SCORE 93 Fire suppression 8th fl - 64 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20122144 | |||||
SCORE 93 Sprinklers - 116 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20121101 | |||||
SCORE 93 Camelot sprinklers only - 3rd & 8th floors Client: Camelot Towers | Permit id: Plum20101345 | |||||
SCORE 93 Fire suppression 9th floor - 81 heads Client: Camelot Towers | Permit id: Plum20111104 | |||||
SCORE 59 Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe/horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Client: Swedish American Realty, Mike King | Permit id: Mulcom20091340 | |||||
SCORE 59 Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Client: Swedish American Realty, Mike King | Permit id: Mulcom20091340 | |||||
SCORE 99 Accessing the manhole. Date: August 18, 2010 Contractor: At And T Permit id: Row20102246 | |||||
SCORE 93 Camelot sprinklers only - 3rd & 8th floors Client: Camelot Towers | Permit id: Plum20101345 | |||||
SCORE 59 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Client: Swedish American Realty, Mike King | Permit id: Mulcom20091205 | |||||
SCORE 93 Sprinklers - 116 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20121101 | |||||
SCORE 93 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Relocating a few diffusers Date: June 10, 2009 Contractor: Gastel, Judd Client: Swedish American Realty, Mike King | Permit id: Mech20091423 | |||||
SCORE 99 Directional bore 163 under sidewalk on w side of williams park - under state st and west under regan Date: April 12, 2010 Contractor: At And T Permit id: Row20101477 | |||||
SCORE 93 65 sq. Ft. 52 sprinkler heads 10,368 value Client: Camelot Towers | Permit id: Plum20091511 | |||||
SCORE 93 Fire suppression 9th floor - 81 heads Client: Camelot Towers | Permit id: Plum20111104 | |||||
SCORE 93 (electrical) "camelot towers - bsmt a4" - basement office remodel, alarm addition to system. Plan review 09-0513. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe horn install. Lights added & 8 outlets. Date: June 23, 2009 Contractor: Pierce, Steve Client: Swedish American Realty, Mike King | Permit id: Elect20091363 | |||||
SCORE 64 Plan review 09-0513. Camelot towers basement. Separate 3 sq ft room into 3 rooms, sprinkler & fire strobe horn install. Lights added & 8 outlets, no plumbing, add diffuser, gc doing remaining. Date: June 23, 2009 Contractor: Arndt, Jessie Client: Swedish American Realty, Mike King | Permit id: Mech20091604 | |||||
SCORE 93 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Fire suppression for 1024 sq, heads Client: Swedish American Realty, Mike King | Permit id: Plum20091227 | |||||
SCORE 93 (electrical) "p & h" - 6th floor conference room, (9) lights and (10) receptacles. Separate 975 sf room into 2 rooms. Date: April 23, 2009 Contractor: Pierce, Steve Client: Swedish American Realty, Mike King | Permit id: Elect20091223 | |||||
SCORE 93 Fire suppression 8th fl - 64 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20122144 | |||||
SCORE 93 Separate 975 sf room into 2 rooms. Mechanical contractor adding 2 thermostats. Sprinkler & fire alarm install. Lights added to 70% & 2 outlets. Gc doing remaining. Fire suppression for 1024 sq, heads Client: Swedish American Realty, Mike King | Permit id: Plum20091227 | |||||
SCORE 93 65 sq. Ft. 52 sprinkler heads 10,368 value Client: Camelot Towers | Permit id: Plum20091511 | |||||
SCORE 93 Fire suppression 8th fl - 64 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20122144 | |||||
SCORE 93 Sprinklers - 116 heads Client: Camelot Towers-Floors 1, 4, 6, 7 | Permit id: Plum20121101 | |||||
SCORE 93 Camelot sprinklers only - 3rd & 8th floors Client: Camelot Towers | Permit id: Plum20101345 | |||||
SCORE 93 Fire suppression 9th floor - 81 heads Client: Camelot Towers | Permit id: Plum20111104 | |||||
Complete tear off and re-roof Date: April 22, 2009 Value: $7,500 Client: Brickey, Joe | Permit id: Sfd20091328 | |||||
SCORE 93 Complete tear off and re-roof Client: Brickey, Joe | Permit id: Sfd20091328 | |||||
SCORE 93 Complete tear off and re-roof Client: Brickey, Joe | Permit id: Sfd20091328 | |||||
Siding. Date: April 24, 2009 Value: $7,400 Client: Gentz, Amy | Permit id: Misc20091053 | |||||
Btu, 95%humidifier 24 hour notice not provided by contractor Date: October 21, 2010 Value: $3,825 Permit id: Mech20102407 | |||||
SCORE 79 Siding. Client: Gentz, Amy | Permit id: Misc20091053 | |||||
SCORE 93 Btu, 95%humidifier 24 hour notice not provided by contractor Permit id: Mech20102407 | |||||
SCORE 93 Btu, 95%humidifier 24 hour notice not provided by contractor Permit id: Mech20102407 | |||||
SCORE 79 Siding. Client: Gentz, Amy | Permit id: Misc20091053 | |||||
SCORE 99 Access manhole Date: May 12, 2010 Contractor: At And T Permit id: Row20101672 | |||||
SCORE 93 Repairing valve box Date: May 4, 2009 Contractor: Rockford Water Division Permit id: Row20091466 | |||||
SCORE 99 Access manhole Date: May 12, 2010 Contractor: At And T Permit id: Row20101672 | |||||
4 high chain link in rear yard Date: May 5, 2009 Value: $400 Permit id: Sfd20091441 | |||||
4 wood fence in side yard , 6 wood fence in rear yard Date: May 16, 2011 Value: $100 Client: Peppers, Mike | Permit id: Sfd20111556 | |||||
Putting small wooden deck 16 x on home in back yard Date: March 21, 2012 Value: $900 Client: Peppers, Mike | Permit id: Sfd20121329 | |||||
SCORE 56 4 high chain link in rear yard Permit id: Sfd20091441 | |||||
SCORE 89 Putting small wooden deck 16 x on home in back yard Client: Peppers, Mike | Permit id: Sfd20121329 | |||||
SCORE 64 4 wood fence in side yard , 6 wood fence in rear yard Client: Peppers, Mike | Permit id: Sfd20111556 | |||||
SCORE 89 Putting small wooden deck 16 x on home in back yard Client: Peppers, Mike | Permit id: Sfd20121329 | |||||
SCORE 64 4 wood fence in side yard , 6 wood fence in rear yard Client: Peppers, Mike | Permit id: Sfd20111556 | |||||
SCORE 56 4 high chain link in rear yard Permit id: Sfd20091441 | |||||
SCORE 93 6 privacy fence in side yard Permit id: Sfd20091446 | |||||
SCORE 93 6 privacy fence in side yard Permit id: Sfd20091446 | |||||
SCORE 93 6 privacy fence in side yard Permit id: Sfd20091446 | |||||
Complete tear off and re-roof Date: May 6, 2009 Value: $8,000 Client: Williams, Ollie | Permit id: Sfd20091452 | |||||
SCORE 82 Complete tear off and re-roof Client: Williams, Ollie | Permit id: Sfd20091452 | |||||
SCORE 82 Complete tear off and re-roof Client: Williams, Ollie | Permit id: Sfd20091452 | |||||
Complete tear off and re-roof Date: May 11, 2009 Value: $6,200 Client: Mastrodonato, Franca | Permit id: Sfd20091490 | |||||
SCORE 82 Repair service leak Date: June 10, 2011 Contractor: Rockford Water Dist Permit id: Row20111605 | |||||
SCORE 82 Complete tear off and re-roof Client: Mastrodonato, Franca | Permit id: Sfd20091490 | |||||
SCORE 82 Complete tear off and re-roof Client: Mastrodonato, Franca | Permit id: Sfd20091490 | |||||
SCORE 96 Mo - not sure what this means Date: June 17, 2009 Contractor: Nicor Gas Company Permit id: Row20091685 | |||||
Underground service, meter socket apt #1 Date: June 17, 2009 Value: $342 Client: Minard, Terry | Permit id: Elect20091423 | |||||
SCORE 82 Underground service, meter socket apt #1 Client: Minard, Terry | Permit id: Elect20091423 | |||||
SCORE 82 Underground service, meter socket apt #1 Client: Minard, Terry | Permit id: Elect20091423 | |||||
SCORE 99 Emergency manhole repair Date: June 22, 2009 Contractor: At And T Permit id: Row20091702 | |||||
SCORE 99 Telephone repair Date: August 3, 2009 Contractor: At And T Permit id: Row20091877 | |||||
Repair work around manhole Date: August 11, 2009 Permit id: Row20091938 | |||||
SCORE 87 City wide patching - colin simpson - pm Date: May 25, 2010 Contractor: Colin Simpson Permit id: Row20101761 | |||||
SCORE 99 Telephone repair Date: August 3, 2009 Contractor: At And T Permit id: Row20091877 | |||||
SCORE 99 Emergency manhole repair Date: June 22, 2009 Contractor: At And T Permit id: Row20091702 | |||||
SCORE 56 Repair work around manhole Date: August 11, 2009 Contractor: At And T , Micheal Smith Permit id: Row20091938 | |||||
SCORE 93 Repair manhole Date: July 9, 2009 Contractor: Rockford Water Division Permit id: Row20091764 | |||||
SCORE 87 City wide patching - colin simpson - pm Date: May 25, 2010 Contractor: Colin Simpson Permit id: Row20101766 | |||||
SCORE 99 Open trench 125, install handholeandy madsen - 608 252 2432 Date: August 31, 2011 Contractor: At And T Permit id: Row20112007 | |||||
SCORE 99 Open trench 125, install handholeandy madsen - 608 252 2432 Date: August 31, 2011 Contractor: At And T Permit id: Row20112007 | |||||
Roof overlay Date: July 22, 2009 Value: $2,380 Client: Anderson, Kay | Permit id: Sfd20091981 | |||||
Water heater - gal - btu 38,000 Date: July 11, 2012 Value: $850 Client: Holt, Kay | Permit id: Plum20121654 | |||||
Repl. Furnace - 80% eff - btu 70,0 & repl. Ac - 2 ton - 13 seer & chimney liner Date: July 11, 2012 Value: $4,097 Client: Holt, Kay | Permit id: Mech20121860 | |||||
SCORE 86 Repl. Furnace - 80% eff - btu 70,0 & repl. Ac - 2 ton - 13 seer & chimney liner Client: Holt, Kay | Permit id: Mech20121860 | |||||
SCORE 70 Water heater - gal - btu 38,000 Client: Holt, Kay | Permit id: Plum20121654 | |||||
SCORE 93 Roof overlay Client: Anderson, Kay | Permit id: Sfd20091981 | |||||
SCORE 93 Roof overlay Client: Anderson, Kay | Permit id: Sfd20091981 | |||||
SCORE 70 Water heater - gal - btu 38,000 Client: Holt, Kay | Permit id: Plum20121654 | |||||
SCORE 86 Repl. Furnace - 80% eff - btu 70,0 & repl. Ac - 2 ton - 13 seer & chimney liner Client: Holt, Kay | Permit id: Mech20121860 | |||||
Complete tear off and re-roof Date: July 24, 2009 Value: $8,360 Client: Kamens, Kenneth | Permit id: Sfd20091994 | |||||
SCORE 100 Comed - 1 s wacker dr - chicagoreplace existing pole Date: April 7, 2011 Contractor: Commonwealth Edison Permit id: Row20111315 | |||||
SCORE 93 Complete tear off and re-roof Client: Kamens, Kenneth | Permit id: Sfd20091994 | |||||
SCORE 93 Complete tear off and re-roof Client: Kamens, Kenneth | Permit id: Sfd20091994 | |||||
SCORE 100 Comed - 1 s wacker dr - chicagoreplace existing pole Date: April 7, 2011 Contractor: Commonwealth Edison Permit id: Row20111315 | |||||
SCORE 89 6 ft wood fence in side yard Permit id: Sfd20091974 | |||||
SCORE 89 6 ft wood fence in side yard Permit id: Sfd20091974 | |||||
SCORE 89 6 wood privacy fence in side yard Client: Spinasanta, Lisa | Permit id: Sfd20101511 | |||||
SCORE 89 6 wood privacy fence in side yard Client: Spinasanta, Lisa | Permit id: Sfd20101511 | |||||
SCORE 89 6 ft wood fence in side yard Permit id: Sfd20091974 | |||||
SCORE 99 Telephone repair Date: August 10, 2009 Contractor: At And T Permit id: Row20091930 | |||||
SCORE 96 Install 42 of 6" pe Date: August 25, 2009 Contractor: Nicor Gas Permit id: Row20092013 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101337 | |||||
SCORE 99 Adjust manhole 6 x 6 Date: January 11, 2012 Contractor: At And T Permit id: Row20121030 | |||||
SCORE 69 Directional bore. Went over water lines, locations, etch Date: June 29, 2012 Contractor: Windstream Comm Kdl Permit id: Row20121731 | |||||
SCORE 99 Adjust manhole 6 x 6 Date: January 11, 2012 Contractor: At And T Permit id: Row20121030 | |||||
SCORE 99 Telephone repair Date: August 10, 2009 Contractor: At And T Permit id: Row20091930 | |||||
SCORE 93 Gal wh Client: Skelcy, Marty | Permit id: Plum20091577 | |||||
Gal wh Date: August 10, 2009 Value: $600 Client: Skelcy, Marty | Permit id: Plum20091577 | |||||
SCORE 89 1403 eastgate prkwy Date: August 31, 2009 Contractor: Paul Larson Concrete Permit id: Row20092041 | |||||
SCORE 93 Gal wh Client: Skelcy, Marty | Permit id: Plum20091577 | |||||
Complete tear off and re-roof Date: August 13, 2009 Value: $3,600 Client: Boyer, Marrisa | Permit id: Sfd20092131 | |||||
SCORE 93 Complete tear off and re-roof Client: Boyer, Marrisa | Permit id: Sfd20092131 | |||||
SCORE 93 Complete tear off and re-roof Client: Boyer, Marrisa | Permit id: Sfd20092131 | |||||
95% 90,0 btu furnace & 3 ton a/c Date: August 20, 2009 Value: $6,000 Permit id: Mech20092017 | |||||
SCORE 93 95% 90,0 btu furnace & 3 ton a/c Permit id: Mech20092017 | |||||
SCORE 93 95% 90,0 btu furnace & 3 ton a c Client: Richter, Dean & Jennifer | Permit id: Mech20092017 | |||||
SCORE 93 Repair cob Date: September 8, 2009 Contractor: Rockford Water Division Permit id: Row20092075 | |||||
SCORE 96 Service repair Date: October 19, 2009 Contractor: Nicor Gas Company Permit id: Row20092368 | |||||
SCORE 99 Manhole 1578 Date: October 13, 2009 Contractor: At And T Permit id: Row20092321 | |||||
SCORE 99 Access manhole Date: January 13, 2010 Contractor: At And T Permit id: Row20101025 | |||||
SCORE 99 Manhole 1578 Date: October 13, 2009 Contractor: At And T Permit id: Row20092321 | |||||
SCORE 99 Access manhole Date: January 13, 2010 Contractor: At And T Permit id: Row20101025 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101335 | |||||
SCORE 96 Point repairs 2012 - 2013 contract 2, repair sewer pipeitem 2, item 3, item 4 - all in same inspection area. Date: April 16, 2012 Contractor: Rock River Water Reclamation District Permit id: Row20121320 | |||||
SCORE 96 Repair / replace sanitary sewerwork to be done march 31 - april 1 2010 Date: October 21, 2009 Contractor: Rock River Water Reclamation District Permit id: Row20092393 | |||||
SCORE 93 Hydrant repair Date: November 16, 2009 Contractor: Rockford Water Division Permit id: Row20092512 | |||||
Btu, 95% - weatherization Date: December 8, 2009 Client: White, Christian | Permit id: Mech20092637 | |||||
SCORE 93 Btu, 95% - weatherization Date: December 8, 2009 Contractor: Gough Dave Client: White, Christian | Permit id: Mech20092637 | |||||
SCORE 93 Btu, 95% - weatherization Date: December 8, 2009 Contractor: Gough, Dave Client: White, Christian | Permit id: Mech20092637 | |||||
SCORE 65 Install fiber optic storage box Date: August 15, 2011 Contractor: Andree, John Permit id: Row20111923 | |||||
SCORE 93 Manhole repair Date: November 20, 2009 Contractor: Rockford Water Division Permit id: Row20092558 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101332 | |||||
SCORE 82 Dir bore under alpine and along n side of manheim 3 total Date: October 5, 2010 Contractor: Kentucky Data Link Permit id: Row20102501 | |||||
Install fiber optic storage box Date: August 15, 2011 Permit id: Row20111923 | |||||
Directional bore for future path for ifiber duct Date: February 13, 2012 Permit id: Row20121113 | |||||
SCORE 100 Peters engineering will be boring under newburg and 4 north on east side of alpine rd for comcast Date: March 14, 2012 Contractor: Comcast Cable Permit id: Row20121194 | |||||
SCORE 100 Install aerial fiber on existing comed poles Date: January 2, 2013 Contractor: Comcast Cable Permit id: Row20131002 | |||||
SCORE 65 Install fiber optic storage box Date: August 15, 2011 Contractor: Andree John Permit id: Row20111923 | |||||
SCORE 70 Directional bore for future path for ifiber duct Date: February 13, 2012 Contractor: Baxter And Woodman Inc Permit id: Row20121113 | |||||
SCORE 70 Directional bore for future path for ifiber duct Date: February 13, 2012 Contractor: Baxter And Woodman, Inc Permit id: Row20121113 | |||||
SCORE 93 Repair manhole Date: November 20, 2009 Contractor: Rockford Water Division Permit id: Row20092556 | |||||
SCORE 99 Access manhole Date: January 13, 2010 Contractor: At And T Permit id: Row20101026 | |||||
SCORE 96 Vac excavate 18" dia hole to main to install anode and test station Date: August 13, 2010 Contractor: Nicor Gas Company Permit id: Row20102213 | |||||
Expose gas main to inspect 8x8 Date: February 15, 2011 Permit id: Row20111130 | |||||
SCORE 100 Exploratory hole for find conduit - dig in terrace. Date: March 8, 2012 Contractor: Commonwealth Edison Permit id: Row20121186 | |||||
SCORE 100 Intren will open cut mulford rd to install a 6" cable with at least 30" of cover. Temp patch of flowable fill and 6" concrete. Final patch will include a 6 wide cut with flowable fill, dowel bars, and 6" oc concrete. Date: March 12, 2012 Contractor: Commonwealth Edison Permit id: Row20121189 | |||||
SCORE 82 Expose gas main to inspect 8x8 Date: February 15, 2011 Contractor: Nicor Jason Bodily Permit id: Row20111130 | |||||
SCORE 100 Exploratory hole for find conduit - dig in terrace. Date: March 8, 2012 Contractor: Commonwealth Edison Permit id: Row20121186 | |||||
SCORE 100 Intren will open cut mulford rd to install a 6" cable with at least 30" of cover. Temp patch of flowable fill and 6" concrete. Final patch will include a 6 wide cut with flowable fill, dowel bars, and 6" oc concrete. Date: March 12, 2012 Contractor: Commonwealth Edison Permit id: Row20121189 | |||||
SCORE 99 Access manhole Date: January 13, 2010 Contractor: At And T Permit id: Row20101026 | |||||
SCORE 82 Expose gas main to inspect 8x8 Date: February 15, 2011 Contractor: Nicor, Jason Bodily Permit id: Row20111130 | |||||
Btu, 95% Date: December 23, 2009 Value: $4,458 Permit id: Mech20092725 | |||||
SCORE 89 Btu, 95% Permit id: Mech20092725 | |||||
SCORE 89 Btu, 95% Client: Forlow, Betty & John | Permit id: Mech20092725 | |||||
Btu, 90 %chimney liner weatherization Date: December 31, 2009 Client: Gonzales, Edmar | Permit id: Mech20092759 | |||||
SCORE 93 Btu, 90+%chimney liner weatherization Date: December 31, 2009 Contractor: Holder James Client: Gonzales, Edmar | Permit id: Mech20092759 | |||||
SCORE 93 Btu, 90+%chimney liner weatherization Date: December 31, 2009 Contractor: Holder, James Client: Gonzales, Edmar | Permit id: Mech20092759 | |||||
Btu, 80% Date: February 16, 2010 Value: $2,500 Client: Zweifel, Betty | Permit id: Mech20101206 | |||||
SCORE 96 Btu, 80% Client: Zweifel, Betty | Permit id: Mech20101206 | |||||
SCORE 96 Btu, 80% Client: Zweifel, Betty | Permit id: Mech20101206 | |||||
6 fence in side yard Date: February 16, 2010 Value: $100 Client: Spurling, Roy | Permit id: Mulcom20101045 | |||||
SCORE 56 6 fence in side yard Client: Spurling, Roy | Permit id: Mulcom20101045 | |||||
SCORE 56 6 fence in side yard Client: Spurling, Roy | Permit id: Mulcom20101045 | |||||
SCORE 96 Service work Date: March 18, 2010 Contractor: Nicor Gas Company Permit id: Row20101305 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101346 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101340 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101342 | |||||
Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower/tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Date: March 17, 2011 Value: $14,997 Client: Vats Llc | Permit id: Mulcom20111161 | |||||
(1) sh, (1) lav, (1) wc Date: March 28, 2011 Client: Vats Llc | Permit id: Plum20111235 | |||||
Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower/tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Date: April 19, 2011 Client: Vats Llc | Permit id: Elect20111123 | |||||
SCORE 84 (1) sh, (1) lav, (1) wc Date: March 28, 2011 Contractor: Seymour Wayne Client: Vats Llc | Permit id: Plum20111235 | |||||
SCORE 93 Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower/tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Date: April 19, 2011 Contractor: Lego William Client: Vats Llc | Permit id: Elect20111123 | |||||
SCORE 69 Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower/tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Client: Vats Llc | Permit id: Mulcom20111161 | |||||
SCORE 69 Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Client: Vats Llc | Permit id: Mulcom20111161 | |||||
SCORE 93 Remodel bathroom to make more accessible. Bathroom not intended to bu fully ada compliant. Work includes:building: new 3 foot door in bathroom, new 3 foot door from bedroom, chase behind shower tubplumbing: new lav, new shower, new water closet, and rework plumbing as required for new fixtureselectrical: rework electrical as required. Date: April 19, 2011 Contractor: Lego, William Client: Vats Llc | Permit id: Elect20111123 | |||||
SCORE 84 (1) sh, (1) lav, (1) wc Date: March 28, 2011 Contractor: Seymour, Wayne Client: Vats Llc | Permit id: Plum20111235 | |||||
SCORE 87 City wide crack sealing - colin simpson Date: March 24, 2010 Contractor: Colin Simpson Permit id: Row20101348 | |||||
SCORE 93 Repair sinking manhole Date: September 15, 2010 Contractor: Rockford Water Division Permit id: Row20102375 | |||||
SCORE 96 Manhole - mainline repair Date: March 25, 2010 Contractor: Rock River Water Reclamation District Permit id: Row20101360 | |||||
New 1 sq. Ft. Wood handicap ramp attached to the front of the residence. Date: March 26, 2010 Value: $600 Client: Frazier, Roy | Permit id: Sfd20101213 | |||||
SCORE 56 New 1 sq. Ft. Wood handicap ramp attached to the front of the residence. Client: Frazier, Roy | Permit id: Sfd20101213 | |||||
SCORE 56 New 1 sq. Ft. Wood handicap ramp attached to the front of the residence. Client: Frazier, Roy | Permit id: Sfd20101213 | |||||
Siding. Date: April 5, 2010 Value: $5,200 Client: Tinsley, Debra | Permit id: Misc20101051 | |||||
Complete tear off & re-roof. Date: April 6, 2010 Value: $4,800 Client: Tinsley, Debra | Permit id: Sfd20101295 | |||||
SCORE 61 Siding. Client: Tinsley, Debra | Permit id: Misc20101051 | |||||
SCORE 56 Complete tear off & re-roof. Client: Tinsley, Debra | Permit id: Sfd20101295 | |||||
SCORE 61 Siding. Client: Tinsley, Debra | Permit id: Misc20101051 | |||||
SCORE 56 Complete tear off & re-roof. Client: Tinsley, Debra | Permit id: Sfd20101295 | |||||
SCORE 93 4 chain link fence in rear yard Permit id: Sfd20101169 | |||||
SCORE 86 4 chain link fence in side and rear yard Client: Nelson, Gerry | Permit id: Sfd20101273 | |||||
SCORE 99 Directional bore approx 3 of 1-4" pvc Date: April 15, 2010 Contractor: At And T Permit id: Row20101497 | |||||
SCORE 99 Directional bore approx 3 of 1-4" pvc Date: April 15, 2010 Contractor: At And T Permit id: Row20101497 | |||||
SCORE 99 Remove and replace existing driveway, same dimensions Date: April 21, 2010 Contractor: Aa Construction Permit id: Row20101513 | |||||
SCORE 89 New asphalt driveway, apron, and new concrete sidewalk. Client: Jacobs, Wayne And Joanne | Permit id: Row20101671 | |||||
Complete tear off & re-roof. Date: May 19, 2010 Value: $5,900 Client: Nelson, Dennis | Permit id: Sfd20101686 | |||||
SCORE 89 Complete tear off & re-roof. Client: Nelson, Dennis | Permit id: Sfd20101686 | |||||
SCORE 89 Complete tear off & re-roof. Client: Nelson, Dennis | Permit id: Sfd20101686 | |||||
SCORE 86 6 wood privacy fence in side and rear yards Client: Person, Janet | Permit id: Sfd20101636 | |||||
1" backflow for underground sprinkler system Date: June 3, 2010 Value: $3,000 Client: Jackson, Robert | Permit id: Plum20101513 | |||||
Replace drvieway apron and public sidewalk. Date: December 11, 2012 Permit id: Row20121665 | |||||
SCORE 68 1" backflow for underground sprinkler system Client: Jackson, Robert | Permit id: Plum20101513 | |||||
SCORE 65 Replace drvieway apron and public sidewalk. Date: December 11, 2012 Contractor: King David Permit id: Row20121665 | |||||
SCORE 68 1" backflow for underground sprinkler system Client: Jackson, Robert | Permit id: Plum20101513 | |||||
SCORE 65 Replace drvieway apron and public sidewalk. Date: December 11, 2012 Contractor: King, David Permit id: Row20121665 | |||||
Complete tear off and re-roof Date: June 7, 2010 Value: $7,000 Client: Ferren, Melba | Permit id: Sfd20101836 | |||||
SCORE 56 Complete tear off and re-roof Client: Ferren, Melba | Permit id: Sfd20101836 | |||||
SCORE 56 Complete tear off and re-roof Client: Ferren, Melba | Permit id: Sfd20101836 | |||||
4 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify customer city inspection may not occur on install date Date: August 11, 2010 Value: $5,000 Client: Hofstetter, Angie | Permit id: Mech20102050 | |||||
SCORE 96 4 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify customer city inspection may not occur on install date Client: Hofstetter, Angie | Permit id: Mech20102050 | |||||
SCORE 96 4 ton, 15 seer due to insufficient notice, it is contractors responsibility to notify customer city inspection may not occur on install date Client: Hofstetter, Angie | Permit id: Mech20102050 | |||||
Complete tear off and re-roof Date: August 30, 2010 Value: $9,000 Client: Theroux, Bob | Permit id: Sfd20102621 | |||||
SCORE 96 Complete tear off and re-roof Client: Theroux, Bob | Permit id: Sfd20102621 | |||||
SCORE 96 Complete tear off and re-roof Client: Theroux, Bob | Permit id: Sfd20102621 | |||||
Complete tear off and re-roof Date: September 15, 2010 Value: $5,500 Client: Clark, Milton | Permit id: Sfd20102765 | |||||
SCORE 93 Complete tear off and re-roof Client: Clark, Milton | Permit id: Sfd20102765 | |||||
SCORE 93 Complete tear off and re-roof Client: Clark, Milton | Permit id: Sfd20102765 | |||||
(1) t/sh, (1) wd, replace most water lines Date: September 27, 2010 Value: $6,695 Client: Johnson, Kris | Permit id: Plum20101945 | |||||
SCORE 96 (1) t/sh, (1) wd, replace most water lines Client: Johnson, Kris | Permit id: Plum20101945 | |||||
SCORE 96 (1) t sh, (1) wd, replace most water lines Client: Johnson, Kris | Permit id: Plum20101945 | |||||
Complete tear off and re-roof Date: October 7, 2010 Value: $4,900 Client: Nelson, George | Permit id: Sfd20102960 | |||||
Structural repair - sagged rafters front of the house. Section up to 65-1 square feet. Remove plywood, sisten the rafters, install new rafters, install new plywood Date: October 7, 2010 Value: $1,200 Client: Nelson, George | Permit id: Sfd20102942 | |||||
SCORE 96 Complete tear off and re-roof Client: Nelson, George | Permit id: Sfd20102960 | |||||
SCORE 89 Structural repair - sagged rafters front of the house. Section up to 65-1 square feet. Remove plywood, sisten the rafters, install new rafters, install new plywood Client: Nelson, George | Permit id: Sfd20102942 | |||||
SCORE 96 Complete tear off and re-roof Client: Nelson, George | Permit id: Sfd20102960 | |||||
SCORE 89 Structural repair - sagged rafters front of the house. Section up to 65-1 square feet. Remove plywood, sisten the rafters, install new rafters, install new plywood Client: Nelson, George | Permit id: Sfd20102942 | |||||
SCORE 96 Sewer manhole repair @ intersection Date: October 7, 2010 Contractor: Rock River Water Reclamation District Permit id: Row20102509 | |||||
Complete tear off and re-roof Date: October 22, 2010 Value: $6,989 Client: Nicholson, Wanda | Permit id: Sfd20103107 | |||||
SCORE 89 Complete tear off and re-roof Client: Nicholson, Wanda | Permit id: Sfd20103107 | |||||
SCORE 89 Complete tear off and re-roof Client: Nicholson, Wanda | Permit id: Sfd20103107 | |||||
SCORE 93 Repair hydrant Date: November 5, 2010 Contractor: Rockford Water Division Permit id: Row20102609 | |||||
SCORE 93 Repair manhole Date: November 10, 2010 Contractor: Rockford Water Division Permit id: Row20102631 | |||||
SCORE 96 San sewer replacement - 20 facility plat cip # 1 a & b Date: January 10, 2011 Contractor: Rock River Water Reclamation District Permit id: Devlop20101000 | |||||
Gal gas Date: January 19, 2011 Value: $995 Client: Wilson, Mark | Permit id: Plum20111041 | |||||
SCORE 96 Gal gas Client: Wilson, Mark | Permit id: Plum20111041 | |||||
SCORE 96 Gal gas Client: Wilson, Mark | Permit id: Plum20111041 | |||||
Btu, 94% Date: February 8, 2011 Value: $4,465 Client: Diehl, Val | Permit id: Mech20111160 | |||||
SCORE 93 Btu, 94% Client: Diehl, Val | Permit id: Mech20111160 | |||||
SCORE 93 Btu, 94% Client: Diehl, Val | Permit id: Mech20111160 | |||||
SCORE 56 Sight obscuring fence 7 in height Client: Krzysztof Sokolowski | Permit id: Mulcom20111096 | |||||
Complete tear off and re-roof Date: March 2, 2011 Value: $700 Client: Fernandez, Zeferino | Permit id: Sfd20111069 | |||||
SCORE 56 Complete tear off and re-roof Client: Fernandez, Zeferino | Permit id: Sfd20111069 | |||||
SCORE 56 Complete tear off and re-roof Client: Fernandez, Zeferino | Permit id: Sfd20111069 | |||||
Btu, 80%2. 5 ton, 13 seer Date: March 28, 2011 Value: $7,705 Permit id: Mech20111530 | |||||
SCORE 93 Btu, 80%2. 5 ton, 13 seer Permit id: Mech20111530 | |||||
SCORE 93 Btu, 80%2. 5 ton, 13 seer Client: Oellig, Tricia & Ashley | Permit id: Mech20111530 | |||||
Gal, 36 btu Date: March 30, 2011 Value: $700 Client: Beary, Ben | Permit id: Plum20111295 | |||||
SCORE 93 4 black vinyl chain link fence in side & rear yard Permit id: Sfd20122372 | |||||
SCORE 96 Gal, 36 btu Client: Beary, Ben | Permit id: Plum20111295 | |||||
SCORE 96 Gal, 36 btu Client: Beary, Ben | Permit id: Plum20111295 | |||||
Repair Date: April 4, 2011 Value: $2,500 Client: Marino, Anthony | Permit id: Plum20111314 | |||||
SCORE 96 Repair Client: Marino, Anthony | Permit id: Plum20111314 | |||||
SCORE 96 Repair Client: Marino, Anthony | Permit id: Plum20111314 | |||||
Complete tear off and re-roof Date: April 6, 2011 Value: $7,175 Permit id: Sfd20111252 | |||||
SCORE 93 Complete tear off and re-roof Permit id: Sfd20111252 | |||||
SCORE 93 Complete tear off and re-roof Client: Vehmeyer, John & Pam | Permit id: Sfd20111252 | |||||
SCORE 99 Directional bore total of 2040, 3 new hand holes Date: April 8, 2011 Contractor: At And T Permit id: Row20111323 | |||||
SCORE 99 Directional bore total of 2040, 3 new hand holes Date: April 8, 2011 Contractor: At And T Permit id: Row20111323 | |||||
Siding garage Date: April 14, 2011 Value: $2,357 Client: Pettepiece, Vie | Permit id: Misc20111045 | |||||
Repair roof Date: April 14, 2011 Value: $2,335 Client: Pettepiece, Vie | Permit id: Sfd20111331 | |||||
SCORE 56 Siding garage Client: Pettepiece, Vie | Permit id: Misc20111045 | |||||
SCORE 56 Repair roof Client: Pettepiece, Vie | Permit id: Sfd20111331 | |||||
SCORE 56 Repair roof Client: Pettepiece, Vie | Permit id: Sfd20111331 | |||||
SCORE 56 Siding garage Client: Pettepiece, Vie | Permit id: Misc20111045 | |||||
SCORE 96 Install anodes on gas main using vacumn excavation and coring Date: May 6, 2011 Contractor: Nicor Gas Permit id: Row20111455 | |||||
Replacing piping196 btu Date: May 6, 2011 Value: $1,600 Client: Sands, Brenda | Permit id: Mech20111683 | |||||
Gal, btu Date: May 6, 2011 Value: $2,000 Client: Sands, Brenda | Permit id: Plum20111435 | |||||
SCORE 96 Replacing piping196 btu Client: Sands, Brenda | Permit id: Mech20111683 | |||||
SCORE 96 Gal, btu Client: Sands, Brenda | Permit id: Plum20111435 | |||||
SCORE 96 Gal, btu Client: Sands, Brenda | Permit id: Plum20111435 | |||||
SCORE 96 Replacing piping196 btu Client: Sands, Brenda | Permit id: Mech20111683 | |||||
Complete tear off and re-roof Date: May 6, 2011 Value: $4,875 Client: Lind, Mitch | Permit id: Sfd20111475 | |||||
SCORE 93 Complete tear off and re-roof Client: Lind, Mitch | Permit id: Sfd20111475 | |||||
SCORE 93 Complete tear off and re-roof Client: Lind, Mitch | Permit id: Sfd20111475 | |||||
SCORE 93 3 ton, 13 seer Permit id: Mech20111772 | |||||
3 ton, 13 seer Date: May 26, 2011 Value: $4,355 Permit id: Mech20111772 | |||||
SCORE 93 3 ton, 13 seer Permit id: Mech20111772 | |||||
Unit #4 gal elec Date: May 27, 2011 Value: $845 Client: Minard, Terry | Permit id: Plum20111524 | |||||
SCORE 96 Unit #4 gal elec Client: Minard, Terry | Permit id: Plum20111524 | |||||
SCORE 96 Unit #4 gal elec Client: Minard, Terry | Permit id: Plum20111524 | |||||
Water service Date: June 27, 2011 Value: $2,000 Client: Minardi, Nick | Permit id: Plum20111630 | |||||
SCORE 96 Water service Client: Minardi, Nick | Permit id: Plum20111630 | |||||
SCORE 96 Water service Client: Minardi, Nick | Permit id: Plum20111630 | |||||
Complete tear off Date: July 5, 2011 Value: $8,315 Permit id: Sfd20112075 | |||||
SCORE 82 Complete tear off Permit id: Sfd20112075 | |||||
SCORE 82 Complete tear off Permit id: Sfd20112075 | |||||
Complete tear off Date: July 6, 2011 Value: $10,810 Client: Hoffman, Helen | Permit id: Sfd20112085 | |||||
SCORE 89 Complete tear off Client: Hoffman, Helen | Permit id: Sfd20112085 | |||||
SCORE 89 Complete tear off Client: Hoffman, Helen | Permit id: Sfd20112085 | |||||
Complete tear off Date: August 2, 2011 Value: $2,400 Client: Mandujano, Jose | Permit id: Sfd20112551 | |||||
Weatherization project 2012-023-201-7095% 80,0 btu furnace Date: January 31, 2012 Value: $2,227 Client: Mandujano, Jose | Permit id: Mech20121113 | |||||
SCORE 89 Complete tear off Client: Mandujano, Jose | Permit id: Sfd20112551 | |||||
SCORE 96 Weatherization project 2012-023-201-7095% 80,0 btu furnace Client: Mandujano, Jose | Permit id: Mech20121113 | |||||
SCORE 96 Weatherization project 2012-023-201-7095% 80,0 btu furnace Client: Mandujano, Jose | Permit id: Mech20121113 | |||||
SCORE 89 Complete tear off Client: Mandujano, Jose | Permit id: Sfd20112551 | |||||
Replace furnace - ac replace - 2 ton - 13 seer Date: August 11, 2011 Value: $2,395 Permit id: Mech20112154 | |||||
SCORE 93 Replace furnace - ac replace - 2 ton - 13 seer Permit id: Mech20112154 | |||||
SCORE 93 Replace furnace - ac replace - 2 ton - 13 seer Client: Fink, Steve & Renee | Permit id: Mech20112154 | |||||
SCORE 96 Service abandonment Date: September 19, 2011 Contractor: Nicor Gas Company Permit id: Row20112135 | |||||
SCORE 100 Tim from comed - 815 262 2862 - use of two trucks for work on pole - close the turn lane for 3 hours Date: September 22, 2011 Contractor: Commonwealth Edison Permit id: Row20112148 | |||||
SCORE 100 Tim from comed - 815 262 2862 - use of two trucks for work on pole - close the turn lane for 3 hours Date: September 22, 2011 Contractor: Commonwealth Edison Permit id: Row20112148 | |||||
Curb, sidewalk and sturcture repairs as needed Date: September 27, 2011 Permit id: Row20112174 | |||||
Complete tear off and re-roof Date: October 11, 2011 Value: $4,985 Client: Mcdanial, Nancy | Permit id: Sfd20113776 | |||||
SCORE 89 Complete tear off and re-roof Client: Mcdanial, Nancy | Permit id: Sfd20113776 | |||||
SCORE 89 Complete tear off and re-roof Client: Mcdanial, Nancy | Permit id: Sfd20113776 | |||||
SCORE 86 Curb, sidewalk and sturcture repairs as needed Date: September 27, 2011 Contractor: City Of Rockford, Public Works Water Div Permit id: Row20112174 | |||||
Removal and replacement of 8 large patches on eastgate btn westgate and minnesota Date: September 28, 2011 Permit id: Row20112182 | |||||
SCORE 86 Removal and replacement of 8 large patches on eastgate btn westgate and minnesota Date: September 28, 2011 Contractor: City Of Rockford, Public Works Water Div Permit id: Row20112182 | |||||
Resurfacing project that includes 5 inlets to be reconstructed with new castings Date: September 30, 2011 Permit id: Row20112205 | |||||
SCORE 86 Resurfacing project that includes 5 inlets to be reconstructed with new castings Date: September 30, 2011 Contractor: City Of Rockford, Public Works Water Div Permit id: Row20112205 | |||||
SCORE 89 Hydrant repair Date: October 3, 2011 Contractor: Rockford Water Department Permit id: Row20112212 | |||||
Complete tear off Date: October 21, 2011 Value: $7,900 Client: Heaslip, Daniel P | Permit id: Sfd20114006 | |||||
SCORE 89 Complete tear off Client: Heaslip, Daniel P | Permit id: Sfd20114006 | |||||
SCORE 89 Complete tear off Client: Heaslip, Daniel P | Permit id: Sfd20114006 | |||||
SCORE 96 Sanitary sewer service Date: November 3, 2011 Contractor: Rock River Water Reclamation District Permit id: Row20112333 | |||||
SCORE 56 Complete tear off Client: Bunting, Charles & Becky | Permit id: Sfd20114327 | |||||
Complete tear off Date: November 15, 2011 Value: $8,500 Permit id: Sfd20114327 | |||||
SCORE 56 Complete tear off Permit id: Sfd20114327 | |||||
Repl. Furnace - 95% eff - btu 60k Date: December 2, 2011 Value: $5,360 Client: Person, Bruce | Permit id: Mech20112722 | |||||
SCORE 96 Repl. Furnace - 95% eff - btu 60k Client: Person, Bruce | Permit id: Mech20112722 | |||||
SCORE 96 Repl. Furnace - 95% eff - btu 60k Client: Person, Bruce | Permit id: Mech20112722 | |||||
Repl. Furnace - 80% eff - btu 90k Date: December 6, 2011 Value: $2,110 Client: Capriola, Kathleen D | Permit id: Mech20112747 | |||||
SCORE 93 Repl. Furnace - 80% eff - btu 90k Client: Capriola, Kathleen D | Permit id: Mech20112747 | |||||
SCORE 93 Repl. Furnace - 80% eff - btu 90k Client: Capriola, Kathleen D | Permit id: Mech20112747 | |||||
1 water heater - gal - btu 38,000 Date: December 8, 2011 Value: $845 Client: Ford, Thomas G Trustee | Permit id: Plum20112243 | |||||
Repl. Furnace - 80% eff - btu 75k Date: December 22, 2011 Value: $2,190 Client: Ford, Thomas G Trustee | Permit id: Mech20112834 | |||||
SCORE 96 Repl. Furnace - 80% eff - btu 75k Client: Ford, Thomas G Trustee | Permit id: Mech20112834 | |||||
SCORE 96 1 water heater - gal - btu 38,000 Client: Ford, Thomas G Trustee | Permit id: Plum20112243 | |||||
SCORE 96 1 water heater - gal - btu 38,000 Client: Ford, Thomas G Trustee | Permit id: Plum20112243 | |||||
SCORE 96 Repl. Furnace - 80% eff - btu 75k Client: Ford, Thomas G Trustee | Permit id: Mech20112834 | |||||
Remove existing siding & install new Date: December 13, 2011 Value: $13,250 Permit id: Misc20111747 | |||||
SCORE 61 Remove existing siding & install new Permit id: Misc20111747 | |||||
SCORE 61 Remove existing siding & install new Client: Montoya, Jose A & Jaquelina | Permit id: Misc20111747 | |||||
Complete tear off Date: December 13, 2011 Value: $5,400 Client: Seal, Mark C | Permit id: Sfd20114606 | |||||
SCORE 89 Complete tear off Client: Seal, Mark C | Permit id: Sfd20114606 | |||||
SCORE 89 Complete tear off Client: Seal, Mark C | Permit id: Sfd20114606 | |||||
Framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits. Jcalcs required with mechanical application. No electrical or mechanical work is to be started until licensed electrician and licensed mechanical person obtain permitsif foundation walls are installed, insulation is to be r-13 value. Date: February 23, 2012 Value: $2,000 Permit id: Sfd20121144 | |||||
SCORE 100 Mechanical: move (2) returns and add (2) hyeat runs to existing ductworkframing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permitsif foundation walls are installed, insulation is to be r-13 value. Date: March 15, 2012 Contractor: Home Owner Permit id: Mech20121198 | |||||
Misc wiring for basement remodel and install larger breaker box framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits Date: May 29, 2012 Value: $2,000 Permit id: Elect20121130 | |||||
SCORE 56 Framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits. Jcalcs required with mechanical application. No electrical or mechanical work is to be started until licensed electrician and licensed mechanical person obtain permitsif foundation walls are installed, insulation is to be r-13 value. Permit id: Sfd20121144 | |||||
SCORE 89 Misc wiring for basement remodel and install larger breaker box framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits Permit id: Elect20121130 | |||||
SCORE 89 Misc wiring for basement remodel and install larger breaker box framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits Client: Brown, Ryan & Kristina | Permit id: Elect20121130 | |||||
SCORE 56 Framing and drywall to create three separate rooms. Drywall ceiling, painting, carpeting. These rooms will not be bedrooms or bath. Electrical and mechanical child permits. Jcalcs required with mechanical application. No electrical or mechanical work is to be started until licensed electrician and licensed mechanical person obtain permitsif foundation walls are installed, insulation is to be r-13 value. Client: Brown, Ryan & Kristina | Permit id: Sfd20121144 | |||||
Dedicated 4-plex for medical equipment Date: February 24, 2012 Value: $550 Client: Specialized Care For Children | Permit id: Elect20121132 | |||||
SCORE 100 Dedicated 4-plex for medical equipment Client: Specialized Care For Children | Permit id: Elect20121132 | |||||
SCORE 93 Dedicated 4-plex for medical equipment Client: Specialized Care For Children | Permit id: Elect20121132 | |||||
4-25-12 canceled - juan cortez w/jc remodeling said homeowner doesnt want the work done. See attachmentelectrical: install (2) outlets on 2 walls (1 each). Install (2) switches on 2 walls (1 each)build new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Date: February 27, 2012 Value: $300 Client: Kim, Young | Permit id: Elect20121137 | |||||
4-25-12 canceled - juan cortez w/jc remodeling said homeowner doesnt want the work done. See attachment5. 11. 12 check returned nsfbuild new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Date: February 27, 2012 Value: $2,100 Client: Kim, Young | Permit id: Sfd20121161 | |||||
SCORE 61 4-25-12 canceled - juan cortez w/jc remodeling said homeowner doesnt want the work done. See attachmentelectrical: install (2) outlets on 2 walls (1 each). Install (2) switches on 2 walls (1 each)build new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Client: Kim, Young | Permit id: Elect20121137 | |||||
SCORE 61 4-25-12 canceled - juan cortez w/jc remodeling said homeowner doesnt want the work done. See attachment5. 11. 12 check returned nsfbuild new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Client: Kim, Young | Permit id: Sfd20121161 | |||||
SCORE 61 4-25-12 canceled - juan cortez w jc remodeling said homeowner doesnt want the work done. See attachment5. 11. 12 check returned nsfbuild new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Client: Kim, Young | Permit id: Sfd20121161 | |||||
SCORE 61 4-25-12 canceled - juan cortez w jc remodeling said homeowner doesnt want the work done. See attachmentelectrical: install (2) outlets on 2 walls (1 each). Install (2) switches on 2 walls (1 each)build new attached deck in rear yard 22 x 14 with 2 steps. Child permit for electrical work for outlets and switches in basement. Client: Kim, Young | Permit id: Elect20121137 | |||||
SCORE 89 Repair hydrant Date: March 26, 2012 Contractor: Rockford Water Department Permit id: Row20121221 | |||||
Complete tear off and re-roof Date: June 15, 2012 Value: $6,000 Permit id: Sfd20122368 | |||||
SCORE 94 Complete tear off and re-roof Permit id: Sfd20122368 | |||||
SCORE 94 Complete tear off and re-roof Client: Truax, Devon & Lindsay | Permit id: Sfd20122368 | |||||
SCORE 82 2 ton, 13 seer a c Client: Hart, Brian | Permit id: Mech20121403 | |||||
2 ton, 13 seer a/c Date: April 6, 2012 Value: $2,550 Client: Hart, Brian | Permit id: Mech20121403 | |||||
SCORE 82 2 ton, 13 seer a/c Client: Hart, Brian | Permit id: Mech20121403 | |||||
Complete tear off and re-roof Date: April 11, 2012 Value: $6,915 Client: Ortiz, Edgar | Permit id: Sfd20121577 | |||||
SCORE 82 Complete tear off and re-roof Client: Ortiz, Edgar | Permit id: Sfd20121577 | |||||
SCORE 82 Complete tear off and re-roof Client: Ortiz, Edgar | Permit id: Sfd20121577 | |||||
Complete tear off Date: April 16, 2012 Value: $7,700 Permit id: Sfd20121616 | |||||
SCORE 89 Complete tear off Permit id: Sfd20121616 | |||||
SCORE 89 Complete tear off Client: Wilson, Richard D & Denise L | Permit id: Sfd20121616 | |||||
1 gas water heater - gal - btu 38,000 Date: April 17, 2012 Value: $895 Client: Geiger, Alissa M | Permit id: Plum20121374 | |||||
SCORE 96 1 gas water heater - gal - btu 38,000 Client: Geiger, Alissa M | Permit id: Plum20121374 | |||||
SCORE 96 1 gas water heater - gal - btu 38,000 Client: Geiger, Alissa M | Permit id: Plum20121374 | |||||
Cip city wide street repairs by william charles Date: April 27, 2012 Permit id: Row20121394 | |||||
SCORE 86 Cip city wide street repairs by william charles Date: April 27, 2012 Contractor: City Of Rockford, Public Works Water Div Permit id: Row20121394 | |||||
Install new siding over existing siding/materials Date: May 17, 2012 Value: $3,600 Client: Cwiklo, Stacy | Permit id: Misc20121253 | |||||
SCORE 56 Install new siding over existing siding/materials Client: Cwiklo, Stacy | Permit id: Misc20121253 | |||||
SCORE 56 Install new siding over existing siding materials Client: Cwiklo, Stacy | Permit id: Misc20121253 | |||||
SCORE 96 Sanitary sewer repair - pavement cut 8 x 14 Date: June 5, 2012 Contractor: Rock River Water Reclamation District Permit id: Row20121627 | |||||
Repairs to sidewalk, ada ramps Date: June 8, 2012 Permit id: Row20121652 | |||||
SCORE 82 Repairs to sidewalk, ada ramps Date: June 8, 2012 Contractor: City Of Rockford, Public Works Engineering Permit id: Row20121652 | |||||
Repairs to sidewalk, ada ramps Date: June 8, 2012 Permit id: Row20121653 | |||||
SCORE 82 Repairs to sidewalk, ada ramps Date: June 8, 2012 Contractor: City Of Rockford, Public Works Engineering Permit id: Row20121653 | |||||
SCORE 69 Install new siding over existing siding/materials Client: Beaver, Dennis | Permit id: Misc20121565 | |||||
SCORE 62 Drive apron/sidewalk, double fee due to no prior permit Date: June 22, 2012 Contractor: Belrock Asphalt Permit id: Row20121704 | |||||
4 side yard, wood, picket fence. Interior lot. Date: June 28, 2012 Value: $2,000 Client: Lam, Dinh | Permit id: Sfd20122496 | |||||
SCORE 56 4 side yard, wood, picket fence. Interior lot. Client: Lam, Dinh | Permit id: Sfd20122496 | |||||
SCORE 56 4 side yard, wood, picket fence. Interior lot. Client: Lam, Dinh | Permit id: Sfd20122496 | |||||
Complete tear off and re-roof Date: July 9, 2012 Value: $6,340 Client: Polsean, Jeffrey | Permit id: Sfd20122601 | |||||
SCORE 96 Complete tear off and re-roof Client: Polsean, Jeffrey | Permit id: Sfd20122601 | |||||
SCORE 96 Complete tear off and re-roof Client: Polsean, Jeffrey | Permit id: Sfd20122601 | |||||
SCORE 93 Roof repair Client: Sandoval, John | Permit id: Sfd20122627 | |||||
Roof repair Date: July 10, 2012 Value: $2,800 Client: Sandoval, John | Permit id: Sfd20122627 | |||||
SCORE 61 6 wood solid privacy fence in the side & rear yards Permit id: Sfd20122640 | |||||
SCORE 93 Roof repair Client: Sandoval, John | Permit id: Sfd20122627 | |||||
6 vinyl fence in side yard Date: July 13, 2012 Value: $2,000 Client: Konopa, Brian | Permit id: Sfd20122670 | |||||
SCORE 56 6 vinyl fence in side yard Client: Konopa, Brian | Permit id: Sfd20122670 | |||||
SCORE 56 6 vinyl fence in side yard Client: Konopa, Brian | Permit id: Sfd20122670 | |||||
Replace ac - 2 ton - 13 seer Date: July 17, 2012 Value: $2,530 Client: Sandstrom, Marilyn | Permit id: Mech20121896 | |||||
SCORE 93 Replace ac - 2 ton - 13 seer Client: Sandstrom, Marilyn | Permit id: Mech20121896 | |||||
SCORE 93 Replace ac - 2 ton - 13 seer Client: Sandstrom, Marilyn | Permit id: Mech20121896 | |||||
SCORE 96 Vacuum excavate 12" hole to gas main, install anode on main spots in parkway Date: August 29, 2012 Contractor: Nicor Gas Permit id: Row20122002 | |||||
New water service Date: September 17, 2012 Value: $1,400 Client: Hernandez, Rueben | Permit id: Plum20121905 | |||||
SCORE 96 New water service Client: Hernandez, Rueben | Permit id: Plum20121905 | |||||
SCORE 96 New water service Client: Hernandez, Rueben | Permit id: Plum20121905 | |||||
Complete tear off and re-roof Date: September 27, 2012 Value: $9,000 Client: Jakupi, Elasat | Permit id: Sfd20123206 | |||||
SCORE 84 Complete tear off and re-roof Client: Jakupi, Elasat | Permit id: Sfd20123206 | |||||
SCORE 84 Complete tear off and re-roof Client: Jakupi, Elasat | Permit id: Sfd20123206 | |||||
SCORE 97 Curb, gutter, ada, median Date: October 9, 2012 Contractor: Lang Construction Permit id: Row20122228 | |||||
Install 4" hope pipe under highgrove place by directional bore Date: October 12, 2012 Permit id: Row20122221 | |||||
SCORE 69 Install 4" hope pipe under highgrove place by directional bore Date: October 12, 2012 Contractor: Underground Services Dave Permit id: Row20122221 | |||||
SCORE 69 Install 4" hope pipe under highgrove place by directional bore Date: October 12, 2012 Contractor: Underground Services, Dave Permit id: Row20122221 | |||||
SCORE 86 Backflow rpz -1" Client: Bradley, Shawn P & Dawn | Permit id: Plum20122017 | |||||
Backflow/rpz -1" Date: October 16, 2012 Value: $630 Permit id: Plum20122017 | |||||
SCORE 86 Backflow/rpz -1" Permit id: Plum20122017 | |||||
One-store addition with basement, kitchen, laundry room addition and remodeling. 5 square foot addition. Electrical, plumbing and mechanical child permit fees are paid with this permit, but no electrical plumbing or mechanical work may be started until a licensed electrician, plumber or mechanical contractor applies for and receives their own permit. Each subcontractor must call for their own inspections. Building addition and altered components must comply with the 2009 iecc. Wall cavity insulation= r-20, exterior perimeter foundation insluation = r- (must extend from foundation sill plate to top of footing), ceiling/attic insulation = r-38, window u factor = u0. 35 or lower. Heat load calcs required prior to issuance of mechanical permit. Must obtain all proper inspections to verify code compliance. Date: January 10, 2013 Value: $135,000 Permit id: Sfd20123730 | |||||
SCORE 67 One-store addition with basement, kitchen, laundry room addition and remodeling. 5 square foot addition. Electrical, plumbing and mechanical child permit fees are paid with this permit, but no electrical plumbing or mechanical work may be started until a licensed electrician, plumber or mechanical contractor applies for and receives their own permit. Each subcontractor must call for their own inspections. Building addition and altered components must comply with the 2009 iecc. Wall cavity insulation= r-20, exterior perimeter foundation insluation = r- (must extend from foundation sill plate to top of footing), ceiling/attic insulation = r-38, window u factor = u0. 35 or lower. Heat load calcs required prior to issuance of mechanical permit. Must obtain all proper inspections to verify code compliance. Permit id: Sfd20123730 | |||||
SCORE 67 One-store addition with basement, kitchen, laundry room addition and remodeling. 5 square foot addition. Electrical, plumbing and mechanical child permit fees are paid with this permit, but no electrical plumbing or mechanical work may be started until a licensed electrician, plumber or mechanical contractor applies for and receives their own permit. Each subcontractor must call for their own inspections. Building addition and altered components must comply with the 2009 iecc. Wall cavity insulation= r-20, exterior perimeter foundation insluation = r- (must extend from foundation sill plate to top of footing), ceiling attic insulation = r-38, window u factor = u0. 35 or lower. Heat load calcs required prior to issuance of mechanical permit. Must obtain all proper inspections to verify code compliance. Client: Olson, Tad & Angela | Permit id: Sfd20123730 |