Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: January 27, 2003 Permit type: Util | Permit id: E314193 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: May 7, 2003 Permit type: Util | Permit id: E321980 | |||||
Perform asbestos abatement work as per hpd specification throughout boiler room, on 22 ft. Of pipe insultaton, and 3 sq. Ft. Of breeching sealant insu Date: February 19, 2003 Permit type: Asbest | Permit id: E315799 | |||||
As per mini rc #k301520a (emsl) and hpd specification perform phase contrast microscopy (pcm) analysis of 08 air samples for fiber content utilizing n Date: February 25, 2003 Permit type: Asbest | Permit id: E315800 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to building. Note: contractor must cont Permit type: Heat | Permit id: E315288 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fue Date: March 13, 2003 Permit type: Util | Permit id: E317866 | |||||
Remove existing heating plant and install new boiler. Install new cast iron / steel #2 oil boiler to supply adequate heat and hot water to building. Date: February 24, 2003 Permit type: Heat | Permit id: E316107 | |||||
As per mini rc #k301520a (emsl) and hpd specification perform polarized light microscopy (plm) analysis of 02 samples for asbestos content utilizing p Date: February 14, 2003 Permit type: Asbest | Permit id: E315798 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to building. Note: contractor must cont Permit type: Heat | Permit id: E315288 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to building. Note: contractor must cont Permit type: Heat | Permit id: E315288 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel #2 oil boiler to supply adequate heat and hot water to building. Date: February 24, 2003 Permit type: Heat | Permit id: E316107 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to building. Note: contractor must cont Permit type: Heat | Permit id: E315288 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat and hot water to building. Note: contractor must cont Permit type: Heat | Permit id: E315288 | |||||
Supply and install oil gage on tank in cellar restore to boiler to working condition. Note:contractor must contact hpd @ (718) 636-3035 or 636-307 Date: March 26, 2003 Permit type: Heat | Permit id: E318650 | |||||
Provide and install wire glass on the vestibule door and make door self closing. Glass is approximately 2 1/2x4. {rr} note: contractor must co Date: March 18, 2003 Permit type: Gc | Permit id: E317387 | |||||
Public area: provide and install a new mortise lock at vestibule door. Note: contract must contract hpd @ (718) 636-3035; 636-3037; 636-3039 with Date: May 20, 2003 Permit type: Intcom | Permit id: E322432 | |||||
Apt. #2f kit; middle rm;livrm: replace (1) radiator air valve in each room. Date: April 23, 2003 Value: $155 Permit type: Plumb | Permit id: E321185 | |||||
SCORE 99 Date: December 8, 2004 Contractor: Joseph Schimicci Client: Miguel Cruz | Client Address: 252 Essex Street Brooklyn Ny 11208 | Client Phone: (917) 324-2156 | Permit status: Initial | Permit id: 301865872 | |||||
Provide and install wire glass on the vestibule door and make door self closing. Glass is approximately 2 1 2x4. {rr} note: contractor must co Date: March 18, 2003 Permit type: Gc | Permit id: E317387 |