Alteration permit Date: July 19, 2016 Client: Hanlon Christopher J | Permit status: Completed | Permit id: 708300 | |||||
Electrical permit Date: December 9, 2016 Client: Hanlon Christopher J | Permit status: Active | Permit id: 742561 | |||||
Plumbing permit Date: December 12, 2016 Client: Hanlon Christopher J | Permit status: Active | Permit id: 742570 | |||||
Administrative permit Date: January 12, 2017 Client: Hanlon Christopher J | Permit status: Active | Permit id: 744591 | |||||
Alteration permit Date: July 19, 2016 Client: Hanlon Christopher J | Permit status: Completed | Permit id: 708300 | |||||
Amend permit ap# 702525 to include additional structural (framing) work at first and second floor levels, as shown on plans. Date: January 12, 2017 Client: Hanlon Christopher J | Permit type: Administrative permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 744591 | |||||
SCORE 89 Re-rough kitchen sink (new location) w dishwasher. Relocated 2nd floor laundry, re-rough master bath toilet, double bowl vanity, shower stall and soaker tub. Set fixtures in kitchen and bathroom (2- lavs, 2- showers tub, water closet, k s and laundry sink washer) Date: December 12, 2016 Contractor: Vincent Goffredo Plumbing And He Client: Hanlon Christopher J | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 742570 | |||||
SCORE 86 Replace lite winow units as per drawings. Replace mahogony french door lite as per drawings. Install windows and door as per approved drawings by historical commission Date: July 19, 2016 Contractor: John P Hovanec Inc Client: Hanlon Christopher J | Permit type: Alteration permit | Permit status: Completed | Completion date: August 24, 2016 | Permit id: 708300 | |||||
SCORE 97 Amend permit ap# 702525 to include replacement windows, and interior alterations as shown on plans. Date: February 6, 2017 Contractor: Lang Construction Llc Client: Hanlon Christopher J | Permit type: Administrative permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 742530 | |||||
SCORE 100 Install 100a, 20- circuit sub-panel, 12- new circuits, 13- circuit extensions, 15- switch legs, 24- recessed lights, 8- new light fixtures with circuit extensions, 2- three-way switch systems, 11- hard-wired smoke co detectors... In accordance with 2008 nec for a one family building Date: December 9, 2016 Contractor: Generation 3 Electric Inc Client: Hanlon Christopher J | Permit type: Electrical permit | Permit status: Completed | Completion date: November 27, 2017 | Permit id: 742561 | |||||
Renovations to existing single family dwelling as per approved plans. Building is registered historic and all work shall be approved by the philadelhia historical commission. Date: August 11, 2016 Client: Hanlon Christopher J | Permit type: Alteration permit | Permit status: Completed | Completion date: September 8, 2017 | Permit id: 702525 |