Building Permits at 231 Missouri Avenue Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 231 Missouri Avenue Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
79
Dccr project proposes to excavate one shallow pit (rca-ph-41) for the purpose of utility location feet west of the intersection between missouri avenue and kansas avenue. The pit will be approximately 1 foot in diameter and less than 6 feet deep. The pits will be excavated using soft dig techniques (air knife and vacuum extraction). The work time to complete the excavations will be approximately 3 days and will require the full work time of 7am-7pm. The work will not impact parking meters and trees. Pedestrians will be detoured.
Date:  April 15, 2016

Client: Dc Water | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 30, 2016 | Permit id: Pa136366
2016/04/15079231 Missouri Avenue Nw Washington DcDc Water Gi Program
SCORE
82
Dccr proposes to drill one geotechnical boring (rcagi-14) located in the parking lane of missouri ave nw, south of the listed property (231 missouri ave nw). The boring will be 12 inches diameter and feet bgs, drilled by vacuum excavation methods. A monitoring well will be installed in the boring. All drilling generated waste will be drummed (solids and liquids), tested and shipped offsite for disposal. In the event the well is not completed within 1 day, the well shall be covered protected from surface water drainage, and the vertical migration of contaminants and other materials through the well casing and well annulus. A locking well cap will be installed and the rig parked over the excavation to prohibit vandalism. No drilling spoils or excavated soils will be used as backfill. If no monitoring well is installed, the boring will be abandoned following ddoe requirements. The monitoring well or well abandonment will be completed the same day. See idw management plan and attached sche
Date:  November 3, 2015
Contractor: Salut Inc

Client: Dc Water | Permit type: Excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: March 31, 2016 | Permit id: Pa118604
2015/11/03082231 Missouri Avenue Nw Washington DcSalut Inc
SCORE
79
Construction staging area
Date:  December 14, 2015

Permit status: Permit expired | Expiration date: January 16, 2016 | Permit id: Pa10223515
2015/12/14079231 Missouri Avenue Nw Washington DcMark Fletcher Salut, Inc
SCORE
79
Construction staging area
Date:  June 6, 2016

Permit status: Permit expired | Expiration date: June 24, 2016 | Permit id: Pa10275501
2016/06/06079231 Missouri Avenue Nw Washington DcDc Water Gi Program
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.