Building Permits at 23 Balsam Av Boulder CO


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 23 Balsam Av Boulder CO over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Replace water heater
Date:  January 11, 2000

Client: T Howard | Applicant: Barday Plumbing & Heating | Permit type: Mechanical | Permit status: N&v | Current use: Single family d
2000/01/11010023 Balsam Av Boulder CoBarday Plumbing And Heating
SCORE
95
New 125 retraining wall of varying heights. None over 7 feet. Steep slope and slope identified as possible mass movement hill side.
Date:  March 13, 2006
Contractor: Agr Building Inc

Client: Shimon Kabili | Applicant: Agr Building, Inc. | Permit status: N&v | Current use: Single family d
2006/03/1309523 Balsam Av Boulder CoAgr Building Inc
SCORE
100
Replace water heater, forced air furnace and comfort cooling.
Date:  December 28, 2005

Client: Fern Hill | Applicant: Climate Masters Service, Llc | Permit type: Mechanical | Permit status: Cmp | Completion date: January 3, 2007 | Current use: Single family d
2005/12/28010023 Balsam Av Boulder CoClimate Masters Service Llc
SCORE
100
Date:  December 28, 2005
Contractor: Batco Homes Inc

Client: Fern Hill | Applicant: Batco Homes Inc | Permit status: N&v | Current use: Single family a
2005/12/28010023 Balsam Av Boulder CoBatco Homes Inc
SCORE
95
Basement finish on sfd. Rough ins existing. Set plumbing fixtures only. (see case notes regarding plumbing fixture count)
Date:  October 3, 2005
Value:   $30,000
Contractor: Agr Building Inc

Client: Shimon Kabili | Applicant: Agr Building, Inc. | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2005/10/03300009523 Balsam Av Boulder CoAgr Building Inc
SCORE
95
Tap 1" water service and install 1" water meter.
Date:  August 18, 2005

Client: Shimon Kabili | Applicant: Contractor Plumbing & Heating | Permit type: Right-of-way | Permit status: Iss
2005/08/1809523 Balsam Av Boulder CoContractor Plumbing And Heating
SCORE
56
Replace fence along south property line. Replace with 6 foot cedar privacy fence.
Date:  February 16, 2005
Contractor: Fern Hill

Client: Fern Hill | Applicant: Fern Hill | Permit type: Fence | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Single family d
2005/02/1605623 Balsam Av Boulder CoFern Hill
SCORE
56
Installation of outdoor swimming pool and associated concrete patio for single-family residence.
Date:  March 7, 2005
Value:   $19,200
Contractor: Shimon Kabili

Client: Shimon Kabili | Applicant: Shimon Kabili | Permit type: Building, electrical | Permit status: Stp | Current use: Single family d
2005/03/07192005623 Balsam Av Boulder CoShimon Kabili
SCORE
84
Installation of outdoor swimming pool and associated concrete patio for single-family residence.
Date:  July 30, 2004
Value:   $19,200

Client: Shimon Kabili | Applicant: Robson Contracting Ltd | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2004/07/30192008423 Balsam Av Boulder CoRobson Contracting Ltd
SCORE
56
Remodel single family residence to convert bedroom into master bath closet
Date:  June 9, 2004
Value:   $13,171
Contractor: Kevin Gross

Client: Lisa Landsberg,Kevin Gross | Applicant: Kevin Gross | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 22, 2004 | Current use: Single family d
2004/06/09131715623 Balsam Av Boulder CoKevin Gross
SCORE
95
New two-story single-family detached dwelling with 4496 finished square feet, 16 unfinished square feet in basement. Four bedrooms, three full baths, three 3 4 baths, and one 1 2 bath. See pmt2004-01202 for demolition permit.
Date:  September 13, 2004
Value:   $557,903
Contractor: Agr Building Inc

Client: Shimon Kabili | Applicant: Agr Building, Inc. | Permit type: Building, electrical | Permit status: Co | Current use: Single family d
2004/09/135579039523 Balsam Av Boulder CoAgr Building Inc
SCORE
100
Electrical permit for temporary construction power
Date:  May 27, 2004
Contractor: Pullenwire Inc

Client: Shimon Kabili | Applicant: Pullen-Wire, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: June 17, 2004 | Current use: Single family d
2004/05/27010023 Balsam Av Boulder CoPullenwire Inc
SCORE
95
Replace guard and handrails and re-build stairs on existing deck.
Date:  August 17, 2006
Value:   $10,600

Client: Fern Hill | Applicant: Parrish Construction Company | Permit type: Building | Permit status: Cmp | Completion date: February 22, 2007 | Current use: Single family d
2006/08/17106009523 Balsam Av Boulder CoParrish Construction Company
SCORE
56
Complete structure demolition.
Date:  April 6, 2004
Contractor: Jean Wallingford

Client: Jean Wallingford | Applicant: Jean Wallingford | Permit type: Demolition | Permit status: Cls | Current use: Single family d
2004/04/0605623 Balsam Av Boulder CoJean Wallingford
SCORE
97
Install temporary construction power.
Date:  May 15, 2001

Client: Kyle Mcdaniel,Christophe Mcdaniel | Applicant: Grant Blicker Electric | Permit type: Electrical | Permit status: Cmp | Completion date: July 25, 2001 | Current use: Single family d
2001/05/1509723 Balsam Av Boulder CoGrant Blicker Electric
SCORE
74
2nd story addition to a single family residence. Owner to be general contractor on the project.
Date:  March 13, 2001
Value:   $200,000
Contractor: Kyle Mcdaniel

Client: Kyle Mcdaniel,Christophe Mcdaniel | Applicant: Kyle Mcdaniel | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Single family d
2001/03/132000007423 Balsam Av Boulder CoKyle Mcdaniel
SCORE
99
Service change
Date:  January 16, 2001
Contractor: K P I Electric Inc

Applicant: K P I Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Single family d
2001/01/1609923 Balsam Av Boulder CoK P I Electric Inc
SCORE
100
Replacement forced air furnace
Date:  September 19, 2006

Client: William Safran,Marian Safran | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: November 29, 2006 | Current use: Single family d
2006/09/19010023 Balsam Av Boulder CoSave Home Heat Co. Inc
SCORE
95
Removal of a built-in tub and installation of a shower pan and a shower surround. Install vent fan & duct & switchleg. Existing window in proposed shower are to comply with irc 308. 4.
Date:  November 25, 2009

Client: Fern Hill | Applicant: Parrish Construction Company | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: February 25, 2010 | Current use: Single family d
2009/11/2509523 Balsam Av Boulder CoParrish Construction Company
SCORE
100
New comfort cooling
Date:  December 28, 2010

Client: Melinda Kassen | Applicant: Save Home Heat Co., Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2011 | Current use: Single family d
2010/12/28010023 Balsam Av Boulder CoSave Home Heat Co. Inc
SCORE
56
Electrical permit to install 4 outlets and hook-up air conditioner installed through pmt2010-020487
Date:  January 19, 2011
Contractor: William Goelz

Client: Melinda Kassen,William Goelz | Applicant: William Goelz | Permit type: Electrical | Permit status: Cmp | Completion date: February 8, 2011 | Current use: Single family d
2011/01/1905623 Balsam Av Boulder CoWilliam Goelz
SCORE
95
In-property sewer service repair only
Date:  August 24, 2012

Client: Lisa Landsberg,Kevin Gross | Applicant: Pipeline Industries, Inc | Permit type: Wastewater | Permit status: Iss
2012/08/2409523 Balsam Av Boulder CoPipeline Industries Inc
SCORE
100
Gas service leak repair street is less than 3 years old, special restoration requirements will apply
Date:  October 27, 2014
Contractor: Xcel Energy

Client: William Safran,Marian Safran | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss
2014/10/27010023 Balsam Av Boulder CoXcel Energy
SCORE
100
Interior non-structural demolition only associated with remodel proposed in pmt2015-03342
Date:  August 7, 2015

Client: Jesse Lawrence,Kristin Trust | Applicant: Field West Construction, Llc | Permit type: Demolition | Permit status: Iss | Current use: Single family d
2015/08/07010023 Balsam Av Boulder CoField West Construction Llc
SCORE
95
Installation of a grid tied 9. 135 kw flush mount pv system on the roof of a single family dwelling in three arrays.
Date:  March 9, 2016
Value:   $34,799

Client: Jesse Lawrence | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 16, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-01022
2016/03/09347999523 Balsam Av Boulder CoNamaste Solar Electric Inc
SCORE
95
Removal of a built-in tub and installation of a shower pan and a shower surround. Install vent fan & duct & switchleg. Existing window in proposed shower are to comply with irc 308. 4.
Date:  November 25, 2009
Value:   $1,400

Client: Fern Hill | Permit type: Electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 25, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04859
2009/11/2514009523 Balsam Av Boulder CoParrish Construction Company
SCORE
100
Replace water heater
Date:  January 11, 2000
Value:   $591

Client: T Howard | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2000-00244
2000/01/1159110023 Balsam Av Boulder CoBarday Plumbing And Heating
SCORE
99
Service change
Date:  January 16, 2001
Value:   $1,200
Contractor: K P I Electric Inc

Client: Mary King & Jayme S Dissly | Permit type: Electrical | Permit status: Cmp | Completion date: February 8, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-00166
2001/01/1612009923 Balsam Av Boulder CoK P I Electric Inc
SCORE
97
2nd story addition to a single family residence. Owner to be general contractor on the project.
Date:  March 13, 2001
Value:   $200,000

Client: Kyle Mcdaniel | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Single family detached dwelling, additio | Permit id: Pmt2001-00487
2001/03/132000009723 Balsam Av Boulder CoGrant Blicker Electric
SCORE
97
Install temporary construction power.
Date:  May 15, 2001
Value:   $75

Client: Kyle Mcdaniel | Permit type: Electrical | Permit status: Cmp | Completion date: July 25, 2001 | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-01956
2001/05/15759723 Balsam Av Boulder CoGrant Blicker Electric
Gas service leak repair street is less than 3 years old, special restoration requirements will apply
Date:  October 27, 2014

Client: William Safran | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-04717
2014/10/2709523 Balsam Av Boulder Co
SCORE
95
In-property sewer service repair only
Date:  August 24, 2012

Client: Lisa Landsberg | Permit type: Wastewater | Permit status: Iss | Permit id: Pmt2012-04155
2012/08/2409523 Balsam Av Boulder CoPipeline Industries, Inc
SCORE
56
Installation of outdoor swimming pool and associated concrete patio for single-family residence.
Date:  March 9, 2005
Value:   $900

Client: Shimon Kabili | Permit type: Building, electrical, mechanical | Permit status: Stp | Current use: Single family detached dwelling, swimmin | Permit id: Pmt2005-00463
2005/03/099005623 Balsam Av Boulder CoThe Pool And Spa Experts
Replace fence along south property line. Replace with 6 foot cedar privacy fence.
Date:  February 16, 2005
Value:   $1

Client: Fern Hill | Permit type: Fence | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-00512
2005/02/1619523 Balsam Av Boulder Co
SCORE
100
Contractor: Batco Homes Inc

Client: Fern Hill | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2005-04964
010023 Balsam Av Boulder CoBatco Homes Inc
SCORE
95
Complete structure demolition.
Date:  April 6, 2004
Contractor: Agr Building, Inc

Client: Jean Wallingford | Permit type: Demolition | Permit status: Cls | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-01202
2004/04/0609523 Balsam Av Boulder CoAgr Building, Inc
SCORE
100
Electrical permit for temporary construction power
Date:  May 27, 2004
Contractor: Pullenwire, Inc

Client: Shimon Kabili | Permit type: Electrical | Permit status: Cmp | Completion date: June 17, 2004 | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02044
2004/05/27010023 Balsam Av Boulder CoPullenwire, Inc
Remodel single family residence to convert bedroom into master bath closet
Date:  June 16, 2004
Value:   $9

Client: Lisa Landsberg | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 22, 2004 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2004-02210
2004/06/1699523 Balsam Av Boulder Co
SCORE
100
New comfort cooling
Date:  December 28, 2010
Value:   $2,062

Client: Melinda Kassen | Permit type: Mechanical | Permit status: Cmp | Completion date: January 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-20487
2010/12/28206210023 Balsam Av Boulder CoSave Home Heat Co., Inc
Electrical permit to install 4 outlets and hook-up air conditioner installed through pmt2010-020487
Date:  January 19, 2011
Value:   $500

Client: Melinda Kassen | Permit type: Electrical | Permit status: Cmp | Completion date: February 8, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00269
2011/01/195009523 Balsam Av Boulder Co
SCORE
95
Interior non-structural demolition only associated with remodel proposed in pmt2015-03342
Date:  August 7, 2015

Client: Jesse Lawrence | Permit type: Demolition | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-03343
2015/08/0709523 Balsam Av Boulder CoField West Construction, Llc
SCORE
95
Replace guard and handrails and re-build stairs on existing deck.
Date:  August 17, 2006
Value:   $10

Client: Fern Hill | Permit type: Building | Permit status: Cmp | Completion date: February 22, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-03381
2006/08/17109523 Balsam Av Boulder CoParrish Construction Company
SCORE
95
New two-story single-family detached dwelling with 4496 finished square feet, 16 unfinished square feet in basement. Four bedrooms, three full baths, three 3 4 baths, and one 1 2 bath. See pmt2004-01202 for demolition permit.
Date:  September 13, 2004
Value:   $557,903
Contractor: Agr Building, Inc

Client: Shimon Kabili | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new, ga | Permit id: Pmt2004-02207
2004/09/135579039523 Balsam Av Boulder CoAgr Building, Inc
Remodel single family residence to convert bedroom into master bath closet
Date:  June 16, 2004
Value:   $9,786

Client: Lisa Landsberg | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 22, 2004 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2004-02210
2004/06/1697869523 Balsam Av Boulder Co
SCORE
84
Installation of outdoor swimming pool and associated concrete patio for single-family residence.
Value:   $19,200

Client: Shimon Kabili | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02981
192008423 Balsam Av Boulder CoRobson Contracting Ltd
Replace fence along south property line. Replace with 6 foot cedar privacy fence.
Date:  February 16, 2005
Value:   $1,600

Client: Fern Hill | Permit type: Fence | Permit status: Cmp | Completion date: April 5, 2005 | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-00512
2005/02/1616009523 Balsam Av Boulder Co
SCORE
95
Tap 1inch water service and install 1inch water meter.
Date:  August 18, 2005

Client: Shimon Kabili | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2005-02837
2005/08/1809523 Balsam Av Boulder CoContractor Plumbing And Heating
SCORE
95
Basement finish on sfd. Rough ins existing. Set plumbing fixtures only. (see case notes regarding plumbing fixture count)
Date:  February 1, 2006
Value:   $6,000
Contractor: Agr Building, Inc

Client: Shimon Kabili | Permit type: Building, electrical | Permit status: N&v | Current use: Single family detached dwelling, remodel | Permit id: Pmt2005-03650
2006/02/0160009523 Balsam Av Boulder CoAgr Building, Inc
SCORE
95
Replace water heater, forced air furnace and comfort cooling.
Date:  December 29, 2005
Value:   $6,931

Client: Fern Hill | Permit type: Mechanical | Permit status: Cmp | Completion date: January 3, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-04963
2005/12/2969319523 Balsam Av Boulder CoClimate Masters Service, Llc
SCORE
95
New 125 retraining wall of varying heights. None over 7 feet. Steep slope and slope identified as possible mass movement hill side.
Value:   $5,000
Contractor: Agr Building, Inc

Client: Shimon Kabili | Permit type: Fence | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-00852
50009523 Balsam Av Boulder CoAgr Building, Inc
SCORE
100
Replacement forced air furnace
Date:  September 19, 2006
Value:   $1,406

Client: William Safran | Permit type: Mechanical | Permit status: Cmp | Completion date: November 29, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-20247
2006/09/19140610023 Balsam Av Boulder CoSave Home Heat Co., Inc
SCORE
56
Permit for the replacement of an existing concrete retaining wall with a new concrete block wall (5 feet high, 105 feet long) at the rear of a single family parcel. 03 22 17 - applicant noted no existing concrete retaining wall exists on property. Application is for a new retaining wall.
Value:   $16,187

Client: Jesse Lawrence | Permit type: Fence | Permit status: Den | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-00723
161875623 Balsam Av Boulder CoMiller Wall Company
SCORE
95
Partial tear-off & overlay at boulder community hospital. Mechanical penthouse area, 13 squares, low pitch, fibertite 45-mil fully adhered pvc system.
Date:  August 8, 2006
Contractor: Black Roofing Inc

Client: Hospital Community | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: August 11, 2006 | Current use: Hospital/instit
2006/08/0809511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
100
Relocation of oxygen system, new oxygen lines to building, construct screening wall and repair parking lot
Date:  April 26, 2006

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: October 10, 2006 | Current use: Hospital/instit
2006/04/26010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Replace mechanical duct work and unit for hvac system. Includes associated electrical.
Date:  January 30, 2006

Client: Hospital Community | Applicant: Mtech Mechanical Technologies | Permit type: Mechanical | Permit status: N&v | Current use: Hospital/instit
2006/01/3009511 Balsam Av Boulder CoMtech Mechanical Technologies
SCORE
99
4th floor addition of two nacs with approx. 6 appliances on each.
Date:  January 23, 2006

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Fire | Permit status: Cmp | Current use: Hospital/instit
2006/01/2309911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Replace cab interiors boulder community hospital
Date:  November 15, 2005

Client: Hospital Community | Applicant: Otis Elevator Company | Permit type: Elevator | Permit status: Cmp | Completion date: September 20, 2007 | Current use: Hospital/instit
2005/11/1509511 Balsam Av Boulder CoOtis Elevator Company
SCORE
99
Hospital- relocation of 3 smokes and 2 new smokes
Date:  November 2, 2005

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/instit
2005/11/0209911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
99
Icu remodel.
Date:  December 15, 2000
Value:   $69,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 10, 2001 | Current use: Hospital/instit
2000/12/15690009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Interior demo of fourth floor.
Date:  October 19, 2005

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Demolition | Permit status: N&v | Current use: Hospital/instit
2005/10/19010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Fourth floor remodel
Date:  November 14, 2005
Value:   $824,046

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 29, 2007 | Current use: Hospital/instit
2005/11/1482404610011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
99
Internal remodel, first floor
Date:  August 29, 2005
Value:   $163,160

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 19, 2008 | Current use: Hospital/instit
2005/08/291631609911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Interior remodel of bathroom relocation., 1st floor, south west corner
Date:  August 11, 2005
Value:   $42,479

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Current use: Hospital/instit
2005/08/11424799911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Relocation and addition of (16)sprinkler heads for lab remodel
Date:  August 10, 2005

Client: Hospital Community | Applicant: Faehnrich Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/instit
2005/08/1008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
99
Interior remodel only at the main community hospital building. Remodel of the ultra sound area and the adjacent waiting area.
Date:  April 12, 2000
Value:   $181,500

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2000/04/121815009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Bch 2nd floor
Date:  May 25, 2005

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 18, 2005 | Current use: Hospital/instit
2005/05/2509911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Total tear off and overlay of 55 squares with dimensional shingles. 5 12 pitch. Building is on the north-east corner of 9th & alpine, and is a part of the hospital property. Look for address on building of 905 alpine.
Date:  May 4, 2005
Contractor: Black Roofing Inc

Client: Hospital Community | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Current use: Medical and den
2005/05/0409511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
95
Sprinkler system record storage
Date:  April 27, 2005
Contractor: Simplex Grinnell

Client: Hospital Community | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: Cmp | Completion date: June 23, 2005 | Current use: Hospital/instit
2005/04/2709511 Balsam Av Boulder CoSimplex Grinnell
SCORE
88
Fire sprinkler system - 2 north and 2 central
Date:  March 21, 2005

Client: Hospital Community | Applicant: Faehnrich Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/instit
2005/03/2108811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
100
Electric work associated with the replacement of the air handling unit. Provide additional power for humidifier.
Date:  April 16, 2002

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Hospital/instit
2002/04/16010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Tenant remodel of second floor remodel of 15,0 square feet to remove and rebuild patient rooms, lounge, nurses stations, etc.
Date:  March 11, 2005
Value:   $850,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 6, 2006 | Current use: Hospital/instit
2005/03/118500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
95
Fire sprinkler system - rocky mountain cancer center
Date:  December 8, 2004

Client: Hospital Community | Applicant: L Nothhaft & Son Inc | Permit type: Fire | Permit status: Cmp | Completion date: January 27, 2005 | Current use: Hospital/instit
2004/12/0809511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
99
Remodel on third floor in the rocky mountain cancer center offices.
Date:  November 8, 2004
Value:   $85,000

Client: Hospital Community | Applicant: Calcon Constructors Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 30, 2005 | Current use: Medical and den
2004/11/08850009911 Balsam Av Boulder CoCalcon Constructors Inc
SCORE
95
Fire alarm system - adding h s to storage kitchen pharm.
Date:  September 29, 2004
Contractor: Simplex Grinnell

Client: Hospital Community | Applicant: Simplex Grinnell | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2005 | Current use: Hospital/instit
2004/09/2909511 Balsam Av Boulder CoSimplex Grinnell
SCORE
99
Install plumbing and electric for coffee kiosk and associated work.
Date:  August 5, 2004
Value:   $7,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 23, 2004 | Current use: Hospital/instit
2004/08/0570009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Addition of 5 sprinkler heads for new wall construction
Date:  October 19, 2005
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/instit
2005/10/19010011 Balsam Av Boulder CoFire Defense Inc
SCORE
100
Interior office remodel to install a new walk-in cooler.
Date:  July 26, 2004
Value:   $31,838

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Hospital/instit
2004/07/263183810011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Interior remodel to install office in existing first floor blood lab at boulder community hospital.
Date:  July 1, 2004
Value:   $7,552

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 13, 2004 | Current use: Hospital/instit
2004/07/01755210011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Replacement of drain system in cafeteria of boulder community hospital. Replacement pipe to be abs or pvc with fire collars at floor penetrations.
Date:  April 1, 2004
Contractor: Drainorooter

Client: Hospital Community | Applicant: Drain-O-Rooter | Permit type: Plumbing | Permit status: Cmp | Completion date: April 16, 2004 | Current use: Hospital/instit
2004/04/0109511 Balsam Av Boulder CoDrainorooter
SCORE
98
Addition to the icu at boulder community hospital.
Date:  February 21, 2002
Value:   $1,431,659

Client: Hospital Community | Applicant: Jordy & Company, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 24, 2002 | Current use: Hospital/instit
2002/02/2114316599811 Balsam Av Boulder CoJordy And Company Inc
SCORE
100
Fire alarm system - or#7
Date:  November 19, 2003

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 3, 2003 | Current use: Hospital/instit
2003/11/19010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
88
Fire sprinkler system - or7
Date:  October 20, 2003

Client: Hospital Community | Applicant: Faehnrich Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 3, 2003 | Current use: Hospital/instit
2003/10/2008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
88
Fire sprinkler system - mri room
Date:  January 3, 2001

Client: Hospital Community | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Hospital/instit
2001/01/0308811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
99
Dumpster
Date:  September 23, 2003

Client: Hospital Community | Applicant: Gerald H Phipps, Inc. | Permit type: Right-of-way | Permit status: Iss
2003/09/2309911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
95
Install electric distribution
Date:  July 1, 2003
Contractor: Xcel

Client: Hospital Community | Applicant: Xcel | Permit type: Right-of-way | Permit status: Iss
2003/07/0109511 Balsam Av Boulder CoXcel
SCORE
100
Fire alarm system - lab remodel
Date:  May 28, 2003

Client: Community Hospital Association | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/instit
2003/05/28010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Addition on south side of building for or #7. See minor modification to pud number adr2003-00051
Date:  May 28, 2003
Value:   $120,000

Client: Community Hospital Association | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 22, 2004 | Current use: Hospital/instit
2003/05/281200009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
56
Mechanical permit to replace two existing cooler towers and install new chiller unit for boulder community hospital (electrical work through pmt2003-01221)
Date:  May 5, 2003

Client: Hospital Community | Applicant: Wray Sheet Metal, Inc. | Permit type: Mechanical | Permit status: Cmp | Completion date: June 25, 2003 | Current use: Medical and den
2003/05/0505611 Balsam Av Boulder CoWray Sheet Metal Inc
SCORE
99
Addition for decontamination shower and holding tank
Date:  May 1, 2003
Value:   $84,975

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 24, 2003 | Current use: Hospital/instit
2003/05/01849759911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Electrical permit for a new chiller and revised cooling tower feeds at boulder community hospital.
Date:  April 9, 2003

Client: Community Hospital Association | Applicant: Intermountain Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: July 24, 2003 | Current use: Hospital/instit
2003/04/09010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
99
Tenant remodel, first floor, room 101-104
Date:  March 25, 2003
Value:   $115,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2003/03/251150009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm system - mri room
Date:  January 3, 2001

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Hospital/instit
2001/01/03010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
88
Fire srpinkler system - or 9
Date:  December 12, 2001

Client: Community Hospital Association | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Current use: Hospital/instit
2001/12/1208811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
100
Fire alarm systems - neuro intervention
Date:  December 4, 2002

Client: Hospital Community | Applicant: Crystal Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/instit
2002/12/04010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Interior demo only, first floor imaging department
Date:  March 21, 2000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Demolition | Permit status: N&v | Current use: Hospital/instit
2000/03/2109911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Fire sprinkler system - neuro intervention
Date:  June 6, 2002

Client: Community Hospital Association | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire, flood not requ | Permit status: Cmp | Completion date: November 1, 2002 | Current use: Hospital/instit
2002/06/0608811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
95
Modernization of traction passenger elevator at boulder community hospital.
Date:  April 26, 2002
Contractor: Kone Inc

Client: Hospital Community | Applicant: Kone, Inc | Permit type: Elevator, flood not | Permit status: Cmp | Completion date: October 31, 2002 | Current use: Hospital/instit
2002/04/2609511 Balsam Av Boulder CoKone Inc
SCORE
99
Remodel neuro-interventional suite.
Date:  April 16, 2002
Value:   $368,134

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2002/04/163681349911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Change out existing air handling unit.
Date:  April 12, 2002

Client: Hospital Community | Applicant: Murphy Company Mech Cont & Eng | Permit type: Mechanical | Permit status: Cmp | Completion date: December 2, 2002 | Current use: Hospital/instit
2002/04/12010011 Balsam Av Boulder CoMurphy Company Mech Cont And Eng
SCORE
100
Fire alarm system - icu remodel
Date:  March 11, 2002

Client: Community Hospital Association | Applicant: Intermountain Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 31, 2002 | Current use: Hospital/instit
2002/03/11010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
99
Interior remodel
Date:  March 8, 2002
Value:   $160,000

Client: Community Hospital Association | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/instit
2002/03/081600009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm system - or 9
Date:  February 5, 2002

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Current use: Hospital/instit
2002/02/05010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Fire sprinkler system - icu addition
Date:  January 9, 2002

Client: Community Hospital Association | Applicant: L Nothhaft & Son Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 22, 2002 | Current use: Hospital/instit
2002/01/0909511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
82
Fire sprinkler system - revise tie-in 3rd and 4th floor
Date:  January 9, 2002

Client: Community Hospital Association | Applicant: U. S. Engineering Company | Permit type: Fire | Permit status: N&v | Current use: Hospital/instit
2002/01/0908211 Balsam Av Boulder CoU. S. Engineering Company
SCORE
99
Dumpster
Date:  December 28, 2001

Client: Hospital Community | Applicant: Gerald H Phipps, Inc. | Permit type: Right-of-way | Permit status: Iss
2001/12/2809911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
56
Standard floodplain permit for the addition to the hospital. Reference pmt2001-04577
Date:  December 20, 2001
Contractor: Jordy And Company

Client: Hospital Community | Applicant: Jordy & Company | Permit type: Flood standard permi | Permit status: N&v | Current use: Hospital/instit
2001/12/2005611 Balsam Av Boulder CoJordy And Company
SCORE
99
Interior remodel of or # 9
Date:  November 19, 2001
Value:   $500,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/instit
2001/11/195000009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm for the imaging ultrasound
Date:  May 4, 2000

Client: Community Hospital Assoc | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Hospital/instit
2000/05/04010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
100
Reroute existing 15kv primary feeder for new addition.
Date:  October 2, 2001

Client: Hospital Community | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: Cmp | Completion date: October 29, 2001 | Current use: Hospital/instit
2001/10/02010011 Balsam Av Boulder CoSturgeon Electric Company Inc
SCORE
100
Fire alarm system - pet scan remodel
Date:  September 12, 2001

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/instit
2001/09/12010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Fire sprinkler system - lobby area
Date:  March 27, 2001

Client: Hospital Community | Applicant: L Nothhaft & Son Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/instit
2001/03/2709511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
88
Fire sprinkler system - pet imaging room
Date:  August 27, 2001

Client: Community Hospital Association | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/instit
2001/08/2708811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
88
Fire sprinkler system - reading room
Date:  July 30, 2001

Client: Community Hospital Assc | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2001 | Current use: Hospital/instit
2001/07/3008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
88
Fire sprinkler system - ct & mammo room
Date:  July 30, 2001

Client: Community Hospital Assoc | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/instit
2001/07/3008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
99
Interior remodel first floor, for imaging equipment.
Date:  July 26, 2001
Value:   $50,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2001/07/26500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
56
Install telecommunications equipment at boulder community hospital for cricket communications. Associated with adr2001-00088
Date:  August 30, 2001
Value:   $55,000
Contractor: Jeanne Strope

Client: Community Hospital Assoc | Applicant: Jeanne Strope | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 11, 2002 | Current use: Hospital/instit
2001/08/30550005611 Balsam Av Boulder CoJeanne Strope
SCORE
100
Fire alarm system - ct scan
Date:  July 24, 2001

Client: Hospital Community | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/instit
2001/07/24010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
56
Install a new internally illuminated wall sign over the emergency room entrance at the boulder community hospital addition: "emergency".
Date:  July 27, 2001
Contractor: Alan Lenzi

Client: Community Hospital | Applicant: Alan Lenzi | Permit type: Electrical, sign | Permit status: N&v | Current use: Hospital/instit
2001/07/2705611 Balsam Av Boulder CoAlan Lenzi
SCORE
88
Install an internally illuminated electric wall sign over the emergency entrance to boulder community hospital.
Date:  July 5, 2001

Client: Hospital Community | Applicant: Apollo Sign & Crane Service | Permit type: Sign | Permit status: N&v | Current use: Hospital/instit
2001/07/0508811 Balsam Av Boulder CoApollo Sign And Crane Service
SCORE
99
Remodel of first floor reading room ( - 1028, sq. Ft.) at boulder community hospital. No increase in floor area or any exterior modifications to structure. Includes removal of two plumbing fixtures.
Date:  July 10, 2001
Value:   $65,000

Client: Community Hospital Association | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 20, 2001 | Current use: Hospital/instit
2001/07/10650009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Enlarge chapel room
Date:  May 23, 2001
Value:   $50,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 14, 2002 | Current use: Hospital/instit
2001/05/23500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Fire sprinkler system - icu unit
Date:  May 22, 2001

Client: Community Hospital Association | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/instit
2001/05/2208811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
67
Remodel of 1st floor - ct mammography area - 10 s. F.
Date:  May 2, 2001
Value:   $137,500
Contractor: Boulder Associates

Client: Community Hospital Association | Applicant: Boulder Associates | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 7, 2001 | Current use: Hospital/instit
2001/05/021375006711 Balsam Av Boulder CoBoulder Associates
SCORE
100
Fire alarm system - icu addition
Date:  March 28, 2001

Client: Hospital Community | Applicant: Crystal Electric, Inc. | Permit type: Fire | Permit status: N&v | Current use: Hospital/instit
2001/03/28010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
100
Fire alarm system - lobby area
Date:  March 12, 2001

Client: Community Hospital Association | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/instit
2001/03/12010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
100
Installation of concrete retaining wall to create protective enclosure around gas meters at boulder community hospital. Wall to be approximately 25 in length, approximatley 3. 5 feet high with gate for access to meters.
Date:  August 16, 2006

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Flood fence flood pe | Permit status: Wdn | Current use: Hospital/instit
2006/08/16010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
99
Addition of 617 square feet to the southern portion of boulder community hospital for icu support space.
Date:  February 26, 2001
Value:   $108,000

Client: Community Hospital Association | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Co | Current use: Hospital/instit
2001/02/261080009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
67
Remodel west lobby and emergency department.
Date:  January 4, 2001
Value:   $390,000
Contractor: Boulder Associates

Client: Hospital Community | Applicant: Boulder Associates | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/instit
2001/01/043900006711 Balsam Av Boulder CoBoulder Associates
SCORE
67
Tenant remodel - imaging mri remodel.
Date:  November 21, 2000
Value:   $120,000
Contractor: Boulder Associates

Client: Hospital Community | Applicant: Boulder Associates | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2000/11/211200006711 Balsam Av Boulder CoBoulder Associates
SCORE
100
Fire alarm system
Date:  July 28, 2000

Client: Community Hospital Association | Applicant: Crystal Electric Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Hospital/instit
2000/07/28010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Fire sprinkler system - cath lab recovery
Date:  June 29, 2000

Client: Communtiy Hospital Association | Applicant: L Nothhaft & Son Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Hospital/instit
2000/06/2909511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
95
Fire sprinkler ultrasound remodel
Date:  May 22, 2000

Client: Community Hospital Assoc | Applicant: L Nothhaft & Son Inc | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Hospital/instit
2000/05/2209511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
59
Replace fence around heli-pad
Date:  May 11, 2000

Client: Hospital Community | Applicant: Boulder Community Hospital | Permit type: Fence | Permit status: N&v | Current use: Hospital/instit
2000/05/1105911 Balsam Av Boulder CoBoulder Community Hospital
SCORE
99
Interior demo only, nuclear medicine and recovery
Date:  May 11, 2000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Demolition | Permit status: N&v | Current use: Hospital/instit
2000/05/1109911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
56
Install telecommunications equipment on boulder community hospital -- approved through adr2000-00028
Date:  June 7, 2000
Value:   $31,465
Contractor: Jeff Fairchild

Client: Community Hospital Assoc. | Applicant: Jeff Fairchild | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 15, 2000 | Current use: Telecommunicati
2000/06/07314655611 Balsam Av Boulder CoJeff Fairchild
SCORE
99
First floor remodel (cath lab and recovery)
Date:  May 30, 2000
Value:   $420,000

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Hospital/instit
2000/05/304200009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
15 kv transformer replacement at the main hospital building. No taxes charged due to tax exempt status of hospitial (state tax exempt # 98-01777 city of boulder tax exempt # 3-00651-1)
Date:  March 24, 2000

Client: Hospital Community | Applicant: Sturgeon Electric Company, Inc | Permit type: Electrical | Permit status: N&v | Current use: Hospital/instit
2000/03/24010011 Balsam Av Boulder CoSturgeon Electric Company Inc
SCORE
98
Remodel of cath lab
Date:  January 18, 2000

Client: Hospital Community | Applicant: L. Nothhaft & Son, Inc. | Permit type: Fire | Permit status: N&v | Current use: Hospital/instit
2000/01/1809811 Balsam Av Boulder CoL. Nothhaft And Son Inc
SCORE
100
Remodel er to add aid station area. Move plumbing fixtures. No new plumbing fixtures.
Date:  November 7, 2006
Value:   $16,001

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 22, 2007 | Current use: Hospital/instit
2006/11/071600110011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Remodel of third floor of hospital. Includes electrical, plumbing and mechanical.
Date:  February 20, 2007
Value:   $876,143

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Hospital/instit
2007/02/2087614310011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Interior work only -- to consist of renovation of pharmacy area to comply with jacho standards. Relocation of 1 existing sink -- no new fixtures this permit.
Date:  March 1, 2007
Value:   $77,000

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Hospital/instit
2007/03/017700010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Replacement of mri magnet requires demo of path to remove magnet. Restore path.
Date:  April 9, 2007
Value:   $33,358

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 5, 2007 | Current use: Hospital/instit
2007/04/093335810011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
11 balsam boulder hospital lab scope of work letter
Date:  March 30, 2007
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2007 | Current use: Office - techni
2007/03/30010011 Balsam Av Boulder CoFire Defense Inc
SCORE
100
Scope of work letter addition of 66 new sprinkler heads
Date:  May 2, 2007
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 3, 2007 | Current use: Office - profes
2007/05/02010011 Balsam Av Boulder CoFire Defense Inc
SCORE
99
Removal of conduit in anticipation of replacement of magnet for mri unit. After installation, re-install conduit, hook-up controller for mri chiller unit.
Date:  May 1, 2007

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Electrical | Permit status: N&v | Current use: Hospital/instit
2007/05/0109911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
100
Interior tenant remodel to change hallway to storage room. Includes removing exterior door.
Date:  May 29, 2007
Value:   $7,500

Client: Hospital Community | Applicant: Melton Construction, Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Hospital/instit
2007/05/29750010011 Balsam Av Boulder CoMelton Construction Inc
SCORE
99
Tennant finish boulder community behavioral health fire alarm
Date:  August 22, 2007

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Fire, flood accessor | Permit status: Cmp | Completion date: October 3, 2007 | Current use: Hospital/instit
2007/08/2209911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
56
See lur2007-00075 floodplain development permit.
Date:  October 17, 2007
Contractor: Drexel

Client: Hospital Community | Applicant: Drexel | Permit type: Flood floodproof str | Permit status: N&v | Current use: Hospital/instit
2007/10/1705611 Balsam Av Boulder CoDrexel
SCORE
95
Roofing permit for partial tear-off and overlay for 9. 5 squares of fibertite roofing at a 1 4" slope.
Date:  October 23, 2007
Contractor: Black Roofing Inc

Client: Hospital Community | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 9, 2008 | Current use: Medical and den
2007/10/2309511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
100
Interior remodel of operating rooms 1,6 and 7 at boulder community hospital. Work includes new finishes, doors and hardware, drywall, cabinetry, accessories, and associated electrical, mechanical and plumbing.
Date:  January 17, 2008
Value:   $160,000

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Hospital/instit
2008/01/1716000010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Reconfiguration of interior walls & remodel of lab area (3,4 sf) to include relocated lights, outlets, etc
Date:  April 9, 2008
Value:   $78,746

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 12, 2008 | Current use: Hospital/instit
2008/04/097874610011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Landscaping modifications reconfiguration of a parking area restricted to the use by doctors & nurses. Relocation of electrical for relocated light poles & relocated access gate controller. Utilization of existing landscaping irrigation system.
Date:  April 23, 2008

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Electrical, flood lu | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Hospital/instit
2008/04/23010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Scope of work letter add 1 pendant head into new ceiling
Date:  March 20, 2008
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Hospital/instit
2008/03/20010011 Balsam Av Boulder CoFire Defense Inc
SCORE
100
Remodel of existing orthopedic rehabilitiation unit including new flooring, millwork, headwall units, act, doors and all work associated with reconfiguring two patient rooms. 13,8 sf. Plumbing fixture relocates only.
Date:  June 16, 2008
Value:   $741,839

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Hospital/instit
2008/06/1674183910011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Scope of work letter add two pendant heads boulder community hospital
Date:  May 2, 2008
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Hospital/instit
2008/05/02010011 Balsam Av Boulder CoFire Defense Inc
SCORE
95
Remove relocate storm inlet. Install new "type d" inlet in ne parking lot
Date:  May 19, 2008

Client: Hospital Community | Applicant: Valley Excavating Inc | Permit type: Right-of-way | Permit status: Iss
2008/05/1909511 Balsam Av Boulder CoValley Excavating Inc
SCORE
100
Place a dumpster in the r. O. W. S. Side of bldg along alpine between loading dock entrance and patient loading unloading pull-out, (approx. Mos.)
Date:  July 10, 2008

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Right-of-way | Permit status: Iss
2008/07/10010011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
100
Scope of work letter bch 2 west add 4 new heads
Date:  September 17, 2008
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Hospital/instit
2008/09/17010011 Balsam Av Boulder CoFire Defense Inc
SCORE
100
Remodel of room 122, seclusion room, to add electronic security doors, install suicide proof register, move remote camera and patch and paint room.
Date:  October 8, 2008
Value:   $15,062

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Hospital/instit
2008/10/081506210011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Overlay of existing cancer center roof, fibertite 45-mil fleece back, fully adhered, 21 squares, 3 12 pitch.
Date:  October 9, 2008
Contractor: Black Roofing Inc

Client: Hospital Community | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Medical and den
2008/10/0909511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
100
Installation of seven (7) new isolation panels.
Date:  December 10, 2008

Client: Hospital Community | Applicant: Intermountain Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: January 8, 2009 | Current use: Hospital/instit
2008/12/10010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
100
Remodel of cath lab area (569 sf) to include relocation addition of lights.& outlets, new electrical circuits, removal reinstallation of hvac ductwork, removal of existing reflected ceiling -- reinstallation of new ceiling at a minimum height of 8 11" (raise & reinstall sprinkler heads) for anticipated installation of a new mri machine. No plumbing.
Date:  December 18, 2008
Value:   $152,481

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 24, 2009 | Current use: Hospital/instit
2008/12/1815248110011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Overlay roof of north wing of boulder community hospital with fibertite fleeceback, 1 squares.
Date:  December 31, 2008
Contractor: Black Roofing Inc

Client: Hospital Community | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: N&v | Current use: Hospital/instit
2008/12/3109511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
100
New computer distribution panel.
Date:  January 29, 2010

Client: Hospital Community | Applicant: Intermountain Electric, Inc. | Permit type: Electrical | Permit status: N&v | Current use: Hospital/instit
2010/01/29010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
100
Interior remodel of operating room #4 including removal of casework, door and partition to combine existing spaces. New finish, relocate medical gas recepticals, install 3 ceiling outlets.
Date:  April 28, 2010
Value:   $69,488

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 16, 2012 | Current use: Hospital/instit
2010/04/286948810011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Connect new underground (due to break) to existing backflow
Date:  August 25, 2010

Client: Hospital Community | Applicant: Frontier Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: February 10, 2011 | Current use: Hospital/instit
2010/08/2509511 Balsam Av Boulder CoFrontier Fire Protection Inc
SCORE
100
Electrical permit - for installation of new ups in server room of boulder community hospital - broadway campus.
Date:  October 1, 2010

Client: Hospital Community | Applicant: Intermountain Electric, Inc. | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2015 | Current use: Hospital/instit
2010/10/01010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
99
North side miscellaneous tree pruning & removal for cob forestry: contract #19 - patrick bohin. Locs. Include: broad mapleton, pine 22nd-24th, elder, kalmia, yarmouth, iris, spine, orchard (see also pmt2010-05753 {s. Side})
Date:  December 28, 2010

Client: Hospital Community | Applicant: Ironwood Earthcare, Inc | Permit type: Right-of-way | Permit status: Iss
2010/12/2809911 Balsam Av Boulder CoIronwood Earthcare Inc
SCORE
98
Temporary capture of on-street parking area along alpine for placement of roll-off dumpster
Date:  March 22, 2011

Client: Hospital Community | Applicant: Golden Triangle Const, Inc | Permit type: Right-of-way | Permit status: Act
2011/03/2209811 Balsam Av Boulder CoGolden Triangle Const Inc
SCORE
100
Tenant remodel - of existing space including minor demolition, framing of new walls, misc. Finish work, relocation of existing hvac distribution for new layout and relocation of electrical power receptacles and lighting. Includes electrical and mechanical only.
Date:  June 13, 2011
Value:   $163,555

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 22, 2011 | Current use: Hospital/instit
2011/06/1316355510011 Balsam Av Boulder CoGolden Triangle Const. Inc
SCORE
95
Scope of work letter for bch - ed admissions
Date:  August 4, 2011

Client: Hospital Community | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: November 30, 2011 | Current use: Hospital/instit
2011/08/0409511 Balsam Av Boulder CoFreedom Fire Protection. Llc
SCORE
95
It room cooling equipment upgrade at boulder community hospital broadway campus
Date:  September 30, 2011

Client: Hospital Community | Applicant: Trautman & Shreve Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: April 23, 2012 | Current use: Hospital/instit
2011/09/3009511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
77
Installation of one additional panel antenna on the east face of boulder community hospital -- includes associated electrical work. See adr2011-00212 (minor modification) and adr2011-00213 (antennae) for supplemental information.
Date:  January 3, 2012
Value:   $3,125

Client: Hospital Community | Applicant: Mc Squared Holdings Inc | Permit type: Electrical, antenna | Permit status: Cmp | Completion date: January 9, 2012 | Current use: Hospital/instit
2012/01/0331257711 Balsam Av Boulder CoMc Squared Holdings Inc
SCORE
61
Installation of eight (8) new remote radio units (rru) on existing roof mounted cable trays. Replacement of one equipment cabinet with a smaller cabinet. See adrs 2012-00124 and -00125 for supplemental information.
Date:  October 3, 2012
Value:   $1,200
Contractor: Darren Hunter

Client: Hospital Community | Applicant: Darren Hunter | Permit type: Antenna | Permit status: Cmp | Completion date: June 2, 2015 | Current use: Hospital/instit
2012/10/0312006111 Balsam Av Boulder CoDarren Hunter
SCORE
95
Replace boiler for boulder community hospital. Scope of work includes removal of portion interior non-bearing walls to facilitate delivery of boiler unit into space. Separate permit for replacement of walls and associated electrical.
Date:  December 21, 2012

Client: Hospital Community | Applicant: Trautman & Shreve Inc | Permit type: Mechanical, demoliti | Permit status: Cmp | Completion date: April 18, 2013 | Current use: Hospital/instit
2012/12/2109511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
99
Replace approximately linear feet of interior wall in basement level that was removed through separate permit to facillitate boiler replacement.
Date:  January 10, 2013
Value:   $34,874

Client: Hospital Community | Applicant: Gerald H Phipps Inc | Permit type: Building, flood acce | Permit status: Iss | Current use: Hospital/instit
2013/01/10348749911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Electrical permit to provide power to new boiler. See pmt2012-05983 for boiler.
Date:  February 15, 2013

Client: Hospital Community | Applicant: Montgomery Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Hospital/instit
2013/02/1509911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Aka 1155 alpine, mechanical work associated with new, redundant it room inchchillerinch for boulder community hospital. Unit to be placed on roof (see engineerfoots letter and drawings for details). Associated electrical work under separate permit.
Date:  October 17, 2013

Client: Hospital Community | Applicant: Trautman & Shreve Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: October 22, 2014 | Current use: Hospital/instit
2013/10/1709511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
62
Replacement of 4 existing panel antennas with three new panel antennas using existing mounts and hardware.
Date:  December 9, 2013
Value:   $5,000

Client: Hospital Community | Applicant: Ethos Distributed Energy | Permit type: Antenna | Permit status: Cmp | Completion date: December 24, 2013 | Current use: Telecommunicati
2013/12/0950006211 Balsam Av Boulder CoEthos Distributed Energy
SCORE
98
Non-structural demolition and rebuild associated with removal of mri machine. Change in scope approved 2 7 14 to lower sill height of window per elevation and structural engineerfoots letter.
Date:  December 17, 2013
Value:   $125,245

Client: Hospital Community | Applicant: Golden Triangle Const, Inc | Permit type: Building | Permit status: Iss | Current use: Hospital/instit
2013/12/171252459811 Balsam Av Boulder CoGolden Triangle Const Inc
SCORE
100
Fs - sowl - inchrelocate a total of 6 pendent sprinklers in units 101, 102, & 103 for the removal of the mri room and provide coverage for a new light hazard occupancy. Inch
Date:  March 10, 2014

Client: Hospital Community | Applicant: Freedom Fire Protection, Llc | Permit type: Fire | Permit status: Iss | Current use: Hospital/instit
2014/03/10010011 Balsam Av Boulder CoFreedom Fire Protection Llc
SCORE
98
Interior remodel of boulder community hospital including demolition, new wall framing, drywall, flooring, ceilings, and rework of existing mechanical and electrical systems.
Date:  July 18, 2014
Value:   $5,342,155

Client: Hospital Community | Applicant: Golden Triangle Const, Inc | Permit type: Building, electrical | Permit status: Iss | Current use: Hospital/instit
2014/07/1853421559811 Balsam Av Boulder CoGolden Triangle Const Inc
SCORE
89
Replacement of 4 existing 7 mhz antennas with new units. Installation of 4 rrufoots (one per sector). (minor structural modifications necessary -- see last page of engineerfoots letter.) approved per minor modification and admin. Reviews adr2014-00187 and adr2014-00188.
Date:  May 6, 2015
Value:   $3,500

Client: Hospital Community | Applicant: Centerline Solutions, Llc | Permit type: Antenna | Permit status: Iss | Current use: Hospital/instit
2015/05/0635008911 Balsam Av Boulder CoCenterline Solutions Llc
Access manholes near broadway & balsam alpine for splicing. Job #094391
Date:  June 9, 2016

Client: Of City | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-02529
2016/06/0909511 Balsam Av Boulder Co
SCORE
99
Electrical permit to provide power to new boiler. See pmt2012-05983 for boiler.
Date:  February 15, 2013
Value:   $9,629

Client: Hospital Community | Permit type: Electrical | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Hospital/institutional, existing | Permit id: Pmt2013-00699
2013/02/1596299911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Aka 1155 alpine, mechanical work associated with new, redundant it room inchchillerinch for boulder community hospital. Unit to be placed on roof (see engineerfoots letter and drawings for details). Associated electrical work under separate permit.
Date:  October 17, 2013
Value:   $65,300

Client: Hospital Community | Permit type: Mechanical | Permit status: Cmp | Completion date: October 22, 2014 | Current use: Hospital/institutional, existing | Permit id: Pmt2013-04870
2013/10/17653009511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
95
Non-structural demolition and rebuild associated with removal of mri machine. Change in scope approved 2 7 14 to lower sill height of window per elevation and structural engineerfoots letter.
Date:  January 16, 2014
Value:   $125,245

Client: Hospital Community | Permit type: Building | Permit status: Cmp | Completion date: August 5, 2016 | Current use: Hospital/institutional, remodel | Permit id: Pmt2013-07072
2014/01/161252459511 Balsam Av Boulder CoGolden Triangle Const, Inc
Install telecommunications equipment on boulder community hospital -- approved through adr2000-00028
Date:  June 7, 2000
Value:   $31

Client: Community Hospital Assoc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 15, 2000 | Current use: Telecommunications, new | Permit id: Pmt2000-01859
2000/06/07319511 Balsam Av Boulder Co
SCORE
88
Fire sprinkler system - mri room
Date:  January 3, 2001
Value:   $10,150

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-00019
2001/01/03101508811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
100
Fire alarm system - mri room
Date:  January 3, 2001
Value:   $8,105

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: February 15, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-00025
2001/01/03810510011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Addition of 617 square feet to the southern portion of boulder community hospital for icu support space.
Date:  February 26, 2001
Value:   $48,200

Client: Community Hospital Association | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Hospital/institutional, addition | Permit id: Pmt2001-00437
2001/02/26482009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm system - lobby area
Date:  March 12, 2001
Value:   $19,515

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-00896
2001/03/121951510011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Fire sprinkler system - lobby area
Date:  March 27, 2001
Value:   $14,500

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-01105
2001/03/27145009511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
98
Fire alarm system - icu addition
Date:  March 28, 2001
Value:   $1,863

Client: Hospital Community | Permit type: Fire | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2001-01137
2001/03/2818639811 Balsam Av Boulder CoCrystal Electric, Inc
SCORE
99
Remodel of 1st floor - ct mammography area + - 10 s. F.
Date:  August 3, 2001
Value:   $56,000

Client: Community Hospital Association | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: November 7, 2001 | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-01256
2001/08/03560009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Fire sprinkler system - icu unit
Date:  May 23, 2001
Value:   $1,650

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-02092
2001/05/2316508811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
99
Enlarge chapel room
Date:  May 23, 2001
Value:   $50,000

Client: Hospital Community | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: June 14, 2002 | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-02111
2001/05/23500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Remodel of first floor reading room (+ - 1028, sq. Ft.) at boulder community hospital. No increase in floor area or any exterior modifications to structure. Includes removal of two plumbing fixtures.
Date:  September 20, 2001
Value:   $65,000

Client: Community Hospital Association | Permit type: Building, electrical, mechanical, plumbing, flood over-the-counter permit | Permit status: Cmp | Completion date: September 20, 2001 | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-02487
2001/09/20650009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Install a new internally illuminated wall sign over the emergency room entrance at the boulder community hospital addition: inchemergencyinch.
Date:  July 31, 2001
Value:   $6,400

Client: Community Hospital | Permit type: Electrical, sign | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2001-02833
2001/07/3164008811 Balsam Av Boulder CoApollo Sign And Crane Service
SCORE
100
Fire alarm system - ct scan
Date:  July 24, 2001
Value:   $2,710

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-03171
2001/07/24271010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
59
Install telecommunications equipment at boulder community hospital for cricket communications. Associated with adr2001-00088
Date:  September 6, 2001
Value:   $55,000

Client: Community Hospital Assoc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 11, 2002 | Current use: Hospital/institutional, alteration | Permit id: Pmt2001-03221
2001/09/06550005911 Balsam Av Boulder CoElkins Telecom, Inc
SCORE
99
Interior remodel first floor, for imaging equipment.
Date:  July 26, 2001
Value:   $50,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-03229
2001/07/26500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Fire sprinkler system - reading room
Date:  July 31, 2001
Value:   $1,500

Client: Community Hospital Assc | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-03278
2001/07/3115008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
88
Fire sprinkler system - ct & mammo room
Date:  July 31, 2001
Value:   $1,500

Client: Community Hospital Assoc | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-03279
2001/07/3115008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
88
Fire sprinkler system - pet imaging room
Date:  August 28, 2001
Value:   $1,300

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-03758
2001/08/2813008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
100
Fire alarm system - pet scan remodel
Date:  September 12, 2001
Value:   $2,310

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 24, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-04010
2001/09/12231010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Reroute existing 15kv primary feeder for new addition.
Date:  October 2, 2001
Value:   $40,000

Client: Hospital Community | Permit type: Electrical | Permit status: Cmp | Completion date: October 29, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-04346
2001/10/02400009511 Balsam Av Boulder CoSturgeon Electric Company, Inc
SCORE
95
Addition to the icu at boulder community hospital.
Date:  February 21, 2002
Value:   $468,596

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, sitework | Permit status: Cmp | Completion date: June 24, 2002 | Current use: Hospital/institutional, addition | Permit id: Pmt2001-04577
2002/02/214685969511 Balsam Av Boulder CoJordy And Company, Inc
SCORE
99
Interior remodel of or # 9
Date:  November 20, 2001
Value:   $500,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-05124
2001/11/205000009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Fire srpinkler system - or 9
Date:  December 14, 2001
Value:   $2,800

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Current use: Hospital/institutional | Permit id: Pmt2001-05386
2001/12/1428008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
Standard floodplain permit for the addition to the hospital. Reference pmt2001-04577
Date:  December 20, 2001

Client: Hospital Community | Permit type: Flood standard permit | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2001-05443
2001/12/2009511 Balsam Av Boulder Co
SCORE
83
Dumpster
Date:  December 28, 2001

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2001-05600
2001/12/2808311 Balsam Av Boulder CoGerald H Phipps, Inc
SCORE
95
Fs - sowl - inchrelocate a total of 6 pendent sprinklers in units 101, 102, & 103 for the removal of the mri room and provide coverage for a new light hazard occupancy. Inch
Date:  March 11, 2014
Value:   $750

Client: Hospital Community | Permit type: Fire | Permit status: Iss | Current use: Hospital/institutional, existing | Permit id: Pmt2014-01002
2014/03/117509511 Balsam Av Boulder CoFreedom Fire Protection, Llc
SCORE
95
Interior remodel of boulder community hospital including demolition, new wall framing, drywall, flooring, ceilings, and rework of existing mechanical and electrical systems.
Date:  September 30, 2015
Value:   $5,342,155

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood nonsubstantial mod/add | Permit status: Iss | Current use: Hospital/institutional, remodel | Permit id: Pmt2014-01729
2015/09/3053421559511 Balsam Av Boulder CoGolden Triangle Const, Inc
SCORE
84
Replacement of 4 existing 7 mhz antennas with new units. Installation of 4 rrufoots (one per sector). (minor structural modifications necessary -- see last page of engineerfoots letter.) approved per minor modification and admin. Reviews adr2014-00187 and adr2014-00188.
Date:  May 6, 2015
Value:   $3,500

Client: Hospital Community | Permit type: Antenna | Permit status: Iss | Current use: Hospital/institutional, existing | Permit id: Pmt2014-05305
2015/05/0635008411 Balsam Av Boulder CoCenterline Solutions, Llc
Installation of eight (8) new remote radio units (rru) on existing roof mounted cable trays. Replacement of one equipment cabinet with a smaller cabinet. See adrs 2012-00124 and -00125 for supplemental information.
Date:  February 4, 2013
Value:   $1,200

Client: Hospital Community | Permit type: Antenna | Permit status: Cmp | Completion date: June 2, 2015 | Current use: Hospital/institutional, existing | Permit id: Pmt2012-04607
2013/02/0412009511 Balsam Av Boulder Co
SCORE
95
Replace boiler for boulder community hospital. Scope of work includes removal of portion interior non-bearing walls to facilitate delivery of boiler unit into space. Separate permit for replacement of walls and associated electrical.
Date:  January 10, 2013
Value:   $122,773

Client: Hospital Community | Permit type: Mechanical, demolition | Permit status: Cmp | Completion date: April 18, 2013 | Current use: Hospital/institutional, existing | Permit id: Pmt2012-05983
2013/01/101227739511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
95
Addition of 5 sprinkler heads for new wall construction
Date:  October 19, 2005
Value:   $500
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-04042
2005/10/195009511 Balsam Av Boulder CoFire Defense, Inc
SCORE
95
Interior demo of fourth floor.
Date:  October 19, 2005

Client: Hospital Community | Permit type: Demolition | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2005-04052
2005/10/1909511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Fire sprinkler system - rocky mountain cancer center
Date:  December 10, 2004
Value:   $490

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: January 27, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2004-04652
2004/12/104909511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
99
New computer distribution panel.
Date:  January 29, 2010
Value:   $30,000

Client: Hospital Community | Permit type: Electrical | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2010-00306
2010/01/29300009911 Balsam Av Boulder CoIntermountain Electric, Inc
SCORE
95
Interior remodel of operating room #4 including removal of casework, door and partition to combine existing spaces. New finish, relocate medical gas recepticals, install 3 ceiling outlets.
Date:  May 3, 2010
Value:   $69,488

Client: Hospital Community | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: August 16, 2012 | Current use: Hospital/institutional, remodel | Permit id: Pmt2010-01499
2010/05/03694889511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Connect new underground (due to break) to existing backflow
Date:  September 1, 2010
Value:   $1,200

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: February 10, 2011 | Current use: Hospital/institutional, existing | Permit id: Pmt2010-03574
2010/09/0112009511 Balsam Av Boulder CoFrontier Fire Protection Inc
SCORE
99
Electrical permit - for installation of new ups in server room of boulder community hospital - broadway campus.
Date:  March 18, 2011
Value:   $15,000

Client: Hospital Community | Permit type: Electrical | Permit status: Cmp | Completion date: June 2, 2015 | Current use: Hospital/institutional, existing | Permit id: Pmt2010-04268
2011/03/18150009911 Balsam Av Boulder CoIntermountain Electric, Inc
SCORE
95
North side miscellaneous tree pruning & removal for cob forestry: contract #19 - patrick bohin. Locs. Include: broad mapleton, pine 22nd-24th, elder, kalmia, yarmouth, iris, spine, orchard (see also pmt2010-05753 {s. Side})
Date:  December 28, 2010

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-05747
2010/12/2809511 Balsam Av Boulder CoIronwood Earthcare, Inc
SCORE
83
Dumpster
Date:  September 23, 2003

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-04115
2003/09/2308311 Balsam Av Boulder CoGerald H Phipps, Inc
SCORE
63
Fire sprinkler system - or7
Date:  October 20, 2003
Value:   $850

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 3, 2003 | Current use: Hospital/institutional, existing | Permit id: Pmt2003-04533
2003/10/208506311 Balsam Av Boulder CoFaehnrich Fire Protection, Inc
SCORE
95
Scope of work letter add 1 pendant head into new ceiling
Date:  March 24, 2008
Value:   $200
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2008-01042
2008/03/242009511 Balsam Av Boulder CoFire Defense, Inc
SCORE
95
Scope of work letter add two pendant heads boulder community hospital
Date:  July 17, 2008
Value:   $200
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: September 22, 2008 | Current use: Hospital/institutional, existing | Permit id: Pmt2008-01643
2008/07/172009511 Balsam Av Boulder CoFire Defense, Inc
SCORE
95
Place a dumpster in the r. O. W. S. Side of bldg along alpine between loading dock entrance and patient loading unloading pull-out, (approx. Mos.)
Date:  July 10, 2008

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-02794
2008/07/1009511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Scope of work letter bch 2 west add 4 new heads
Date:  September 18, 2008
Value:   $500
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Iss | Current use: Hospital/institutional, existing | Permit id: Pmt2008-04081
2008/09/185009511 Balsam Av Boulder CoFire Defense, Inc
SCORE
95
Remodel of room 122, seclusion room, to add electronic security doors, install suicide proof register, move remote camera and patch and paint room.
Date:  October 21, 2008
Value:   $400

Client: Hospital Community | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: January 5, 2009 | Current use: Hospital/institutional, remodel | Permit id: Pmt2008-04308
2008/10/214009511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
11 balsam boulder hospital lab scope of work letter
Date:  April 2, 2007
Value:   $300
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: June 5, 2007 | Current use: Office - technical, existing | Permit id: Pmt2007-01079
2007/04/023009511 Balsam Av Boulder CoFire Defense, Inc
SCORE
95
Scope of work letter addition of 66 new sprinkler heads
Date:  May 2, 2007
Value:   $800
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: October 3, 2007 | Current use: Office - professional, existing | Permit id: Pmt2007-01609
2007/05/028009511 Balsam Av Boulder CoFire Defense, Inc
See lur2007-00075 floodplain development permit.

Client: Hospital Community | Permit type: Flood floodproof structure | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2007-04599
09511 Balsam Av Boulder Co
SCORE
98
Fire alarm systems - neuro intervention
Date:  December 4, 2002
Value:   $900

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-05160
2002/12/049009811 Balsam Av Boulder CoCrystal Electric, Inc
SCORE
95
Tenant remodel - of existing space including minor demolition, framing of new walls, misc. Finish work, relocation of existing hvac distribution for new layout and relocation of electrical power receptacles and lighting. Includes electrical and mechanical only.
Date:  June 15, 2011
Value:   $37,390

Client: Hospital Community | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: September 22, 2011 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2011-02284
2011/06/15373909511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Scope of work letter for bch - ed admissions
Date:  August 8, 2011
Value:   $550

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: November 30, 2011 | Current use: Hospital/institutional, existing | Permit id: Pmt2011-03322
2011/08/085509511 Balsam Av Boulder CoFreedom Fire Protection. Llc
SCORE
95
It room cooling equipment upgrade at boulder community hospital broadway campus
Date:  September 30, 2011
Value:   $307,532

Client: Hospital Community | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: April 23, 2012 | Current use: Hospital/institutional, existing | Permit id: Pmt2011-03990
2011/09/303075329511 Balsam Av Boulder CoTrautman And Shreve Inc
SCORE
77
Installation of one additional panel antenna on the east face of boulder community hospital -- includes associated electrical work. See adr2011-00212 (minor modification) and adr2011-00213 (antennae) for supplemental information.
Date:  January 3, 2012
Value:   $500

Client: Hospital Community | Permit type: Electrical, antenna | Permit status: Cmp | Completion date: January 9, 2012 | Current use: Hospital/institutional, existing | Permit id: Pmt2011-05418
2012/01/035007711 Balsam Av Boulder CoMc Squared Holdings Inc
SCORE
56
Sidewalk closures associated with monitoring well borings on private property
Date:  October 2, 2015

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04308
2015/10/0205611 Balsam Av Boulder CoVista Geoscience Llc
SCORE
98
Remodel of cath lab
Date:  January 18, 2000
Value:   $10,300

Client: Hospital Community | Permit type: Fire | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2000-00320
2000/01/18103009811 Balsam Av Boulder CoL. Nothhaft And Son, Inc
SCORE
95
15 kv transformer replacement at the main hospital building. No taxes charged due to tax exempt status of hospitial (state tax exempt # 98-01777 city of boulder tax exempt # 3-00651-1)
Date:  April 7, 2000
Value:   $104,565

Client: Hospital Community | Permit type: Electrical | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2000-01159
2000/04/071045659511 Balsam Av Boulder CoSturgeon Electric Company, Inc
SCORE
99
Interior remodel only at the main community hospital building. Remodel of the ultra sound area and the adjacent waiting area.
Date:  April 18, 2000
Value:   $91,500

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood over-the-counter permit | Permit status: N&v | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2000-01276
2000/04/18915009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm for the imaging ultrasound
Date:  May 10, 2000
Value:   $4,650

Client: Community Hospital Assoc | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Hospital/institutional, existing | Permit id: Pmt2000-01825
2000/05/10465010011 Balsam Av Boulder CoCrystal Electric Inc
Install telecommunications equipment on boulder community hospital -- approved through adr2000-00028
Date:  June 7, 2000
Value:   $31,465

Client: Community Hospital Assoc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 15, 2000 | Current use: Telecommunications, new | Permit id: Pmt2000-01859
2000/06/07314659511 Balsam Av Boulder Co
SCORE
99
First floor remodel (cath lab and recovery)
Date:  June 6, 2000
Value:   $420,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Hospital/institutional, remodel | Permit id: Pmt2000-01864
2000/06/064200009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
59
Replace fence around heli-pad
Date:  May 12, 2000
Value:   $3,200

Client: Hospital Community | Permit type: Fence | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2000-01952
2000/05/1232005911 Balsam Av Boulder CoBoulder Community Hospital
SCORE
95
Fire sprinkler ultrasound remodel
Date:  May 22, 2000
Value:   $4,000

Client: Community Hospital Assoc | Permit type: Fire | Permit status: Cmp | Completion date: October 11, 2000 | Current use: Hospital/institutional, existing | Permit id: Pmt2000-02050
2000/05/2240009511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
95
Fire sprinkler system - cath lab recovery
Date:  July 6, 2000
Value:   $2,000

Client: Communtiy Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Hospital/institutional, existing | Permit id: Pmt2000-02669
2000/07/0620009511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
100
Fire alarm system
Date:  July 28, 2000
Value:   $7,386

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: August 23, 2000 | Current use: Hospital/institutional, existing | Permit id: Pmt2000-03075
2000/07/28738610011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Tenant remodel - imaging mri remodel.
Date:  December 6, 2000
Value:   $65,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2000-04257
2000/12/06650009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Remodel west lobby and emergency department.
Date:  February 13, 2001
Value:   $390,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood over-the-counter permit | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/institutional, remodel | Permit id: Pmt2000-04605
2001/02/133900009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Icu remodel.
Date:  January 2, 2001
Value:   $69,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 10, 2001 | Current use: Hospital/institutional, remodel | Permit id: Pmt2000-04788
2001/01/02690009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
88
Install an internally illuminated electric wall sign over the emergency entrance to boulder community hospital.
Value:   $6,400

Client: Hospital Community | Permit type: Sign | Permit status: N&v | Current use: Hospital/institutional, new | Permit id: Pmt2001-02832
64008811 Balsam Av Boulder CoApollo Sign And Crane Service
SCORE
95
Fire sprinkler system - icu addition
Date:  January 7, 2002
Value:   $6,455

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: July 22, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-00034
2002/01/0764559511 Balsam Av Boulder CoL Nothhaft And Son Inc
SCORE
82
Fire sprinkler system - revise tie-in 3rd and 4th floor
Date:  January 9, 2002
Value:   $12,000

Client: Community Hospital Association | Permit type: Fire | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2002-00035
2002/01/09120008211 Balsam Av Boulder CoU. S. Engineering Company
SCORE
100
Fire alarm system - or 9
Date:  February 5, 2002
Value:   $5,800

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Current use: Hospital/institutional, existing | Permit id: Pmt2002-00460
2002/02/05580010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Interior remodel
Date:  March 8, 2002
Value:   $39,000

Client: Community Hospital Association | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 8, 2002 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2002-00833
2002/03/08390009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm system - icu remodel
Date:  March 15, 2002
Value:   $18,000

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: May 31, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-00854
2002/03/151800010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
100
Change out existing air handling unit.
Date:  April 12, 2002
Value:   $375,000

Client: Hospital Community | Permit type: Mechanical | Permit status: Cmp | Completion date: December 2, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-01372
2002/04/1237500010011 Balsam Av Boulder CoMurphy Company Mech Cont And Eng
SCORE
99
Remodel neuro-interventional suite.
Date:  April 16, 2002
Value:   $368,134

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2002-01375
2002/04/163681349911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Electric work associated with the replacement of the air handling unit. Provide additional power for humidifier.
Date:  April 16, 2002
Value:   $12,000

Client: Hospital Community | Permit type: Electrical | Permit status: Cmp | Completion date: May 28, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-01435
2002/04/161200010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
97
Modernization of four stop traction passenger elevator at boulder community hospital.
Date:  May 1, 2002
Value:   $89,287
Contractor: Kone, Inc

Client: Hospital Community | Permit type: Elevator, flood not required | Permit status: Cmp | Completion date: October 31, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-01610
2002/05/01892879711 Balsam Av Boulder CoKone, Inc
SCORE
88
Fire sprinkler system - neuro intervention
Date:  June 12, 2002
Value:   $2,500

Client: Community Hospital Association | Permit type: Fire, flood not required | Permit status: Cmp | Completion date: November 1, 2002 | Current use: Hospital/institutional, existing | Permit id: Pmt2002-02311
2002/06/1225008811 Balsam Av Boulder CoFaehnrich Fire Protection Inc
SCORE
99
Tenant remodel, first floor, room 101-104
Date:  March 25, 2003
Value:   $71,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2003-01047
2003/03/25710009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Electrical permit for a new chiller and revised cooling tower feeds at boulder community hospital.
Date:  April 10, 2003
Value:   $40,000

Client: Community Hospital Association | Permit type: Electrical | Permit status: Cmp | Completion date: July 24, 2003 | Current use: Hospital/institutional, existing | Permit id: Pmt2003-01221
2003/04/104000010011 Balsam Av Boulder CoIntermountain Electric Inc
SCORE
99
Addition for decontamination shower and holding tank
Date:  May 1, 2003
Value:   $84,975

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 24, 2003 | Current use: Hospital/institutional, addition | Permit id: Pmt2003-01634
2003/05/01849759911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
59
Mechanical permit to replace two existing cooler towers and install new chiller unit for boulder community hospital (electrical work through pmt2003-01221)
Date:  May 5, 2003
Value:   $270,000

Client: Hospital Community | Permit type: Mechanical | Permit status: Cmp | Completion date: June 25, 2003 | Current use: Medical and dental clinics, existing | Permit id: Pmt2003-01663
2003/05/052700005911 Balsam Av Boulder CoWray Sheet Metal, Inc
SCORE
100
Fire alarm system - lab remodel
Date:  May 28, 2003
Value:   $1,400

Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2003-02068
2003/05/28140010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
99
Addition on south side of building for or #7. See minor modification to pud number adr2003-00051
Date:  May 28, 2003
Value:   $35,000

Client: Community Hospital Association | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: March 22, 2004 | Current use: Hospital/institutional, addition and rem | Permit id: Pmt2003-02069
2003/05/28350009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
100
Fire alarm system - or#7
Date:  November 19, 2003
Value:   $2,200

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 3, 2003 | Current use: Hospital/institutional, existing | Permit id: Pmt2003-04979
2003/11/19220010011 Balsam Av Boulder CoCrystal Electric Inc
SCORE
95
Replacement of drain system in cafeteria of boulder community hospital. Replacement pipe to be abs or pvc with fire collars at floor penetrations.
Date:  April 1, 2004
Value:   $13,875
Contractor: Drainorooter

Client: Hospital Community | Permit type: Plumbing | Permit status: Cmp | Completion date: April 16, 2004 | Current use: Hospital/institutional, existing | Permit id: Pmt2004-01149
2004/04/01138759511 Balsam Av Boulder CoDrainorooter
SCORE
95
Interior remodel to install office in existing first floor blood lab at boulder community hospital.
Date:  July 1, 2004
Value:   $7,552

Client: Hospital Community | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 13, 2004 | Current use: Hospital/institutional, remodel | Permit id: Pmt2004-02559
2004/07/0175529511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Interior office remodel to install a new walk-in cooler.
Date:  August 6, 2004
Value:   $31,838

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 28, 2004 | Current use: Hospital/institutional, remodel | Permit id: Pmt2004-02876
2004/08/06318389511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
99
Install plumbing and electric for coffee kiosk and associated work.
Date:  August 5, 2004
Value:   $7,000

Client: Hospital Community | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: September 23, 2004 | Current use: Hospital/institutional, remodel | Permit id: Pmt2004-03071
2004/08/0570009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
95
Fire alarm system - adding h s to storage kitchen pharm.
Date:  September 29, 2004
Value:   $3,800
Contractor: Simplex Grinnell

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2004-03786
2004/09/2938009511 Balsam Av Boulder CoSimplex Grinnell
SCORE
99
Remodel on third floor in the rocky mountain cancer center offices.
Date:  November 8, 2004
Value:   $85,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: March 30, 2005 | Current use: Medical and dental clinics, tenant remod | Permit id: Pmt2004-04028
2004/11/08850009911 Balsam Av Boulder CoCalcon Constructors Inc
SCORE
99
Tenant remodel of second floor remodel of 15,0 square feet to remove and rebuild patient rooms, lounge, nurses stations, etc.
Date:  March 15, 2005
Value:   $850,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: September 6, 2006 | Current use: Hospital/institutional, remodel | Permit id: Pmt2005-00397
2005/03/158500009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
63
Fire sprinkler system - 2 north and 2 central
Date:  March 21, 2005
Value:   $2,400

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: August 8, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-00991
2005/03/2124006311 Balsam Av Boulder CoFaehnrich Fire Protection, Inc
SCORE
95
Sprinkler system record storage
Date:  April 27, 2005
Value:   $14,000
Contractor: Simplex Grinnell

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: June 23, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01423
2005/04/27140009511 Balsam Av Boulder CoSimplex Grinnell
SCORE
95
Total tear off and overlay of 55 squares with dimensional shingles. 5 12 pitch. Building is on the north-east corner of 9th & alpine, and is a part of the hospital property. Look for address on building of 905 alpine.
Date:  May 5, 2005
Value:   $9,240
Contractor: Black Roofing Inc

Client: Hospital Community | Permit type: Roofing | Permit status: Cmp | Current use: Medical and dental clinics, existing | Permit id: Pmt2005-01626
2005/05/0592409511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
99
Bch 2nd floor
Date:  May 27, 2005
Value:   $5,684

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: August 18, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01989
2005/05/2756849911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
63
Relocation and addition of (16)sprinkler heads for lab remodel
Date:  August 18, 2005
Value:   $1,200

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-03132
2005/08/1812006311 Balsam Av Boulder CoFaehnrich Fire Protection, Inc
SCORE
99
Interior remodel of bathroom relocation., 1st floor, south west corner
Date:  August 11, 2005
Value:   $42,479

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Current use: Hospital/institutional, remodel | Permit id: Pmt2005-03157
2005/08/11424799911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
99
Internal remodel, first floor
Date:  September 6, 2005
Value:   $204,800

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: February 19, 2008 | Current use: Hospital/institutional, remodel | Permit id: Pmt2005-03327
2005/09/062048009911 Balsam Av Boulder CoGerald H Phipps Inc
SCORE
95
Fourth floor remodel
Date:  November 16, 2005
Value:   $824,046

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: January 29, 2007 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2005-04053
2005/11/168240469511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
99
Hospital- relocation of 3 smokes and 2 new smokes
Date:  November 15, 2005
Value:   $2,480

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-04251
2005/11/1524809911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Replace cab interiors on two five stop passenger elevators at boulder community hospital.
Date:  November 14, 2005
Value:   $123,900

Client: Hospital Community | Permit type: Elevator | Permit status: Cmp | Completion date: September 20, 2007 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-04384
2005/11/141239009511 Balsam Av Boulder CoOtis Elevator Company
SCORE
99
4th floor addition of two nacfoots with approx. 6 appliances on each.
Date:  January 26, 2006
Value:   $6,430

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Current use: Hospital/institutional, existing | Permit id: Pmt2006-00199
2006/01/2664309911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Replace mechanical duct work and unit for hvac system. Includes associated electrical.
Date:  January 31, 2006
Value:   $49,500

Client: Hospital Community | Permit type: Mechanical | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2006-00226
2006/01/31495009511 Balsam Av Boulder CoMtech Mechanical Technologies
SCORE
95
Relocation of oxygen system, new oxygen lines to building, construct screening wall and repair parking lot
Date:  April 26, 2006
Value:   $122,250

Client: Hospital Community | Permit type: Electrical, mechanical, fence | Permit status: Cmp | Completion date: October 10, 2006 | Current use: Hospital/institutional, existing | Permit id: Pmt2006-01523
2006/04/261222509511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Installation of concrete retaining wall to create protective enclosure around gas meters at boulder community hospital. Wall to be approximately 25foot in length, approximatley 3. 5 feet high with gate for access to meters.
Date:  August 16, 2006
Value:   $30,000

Client: Hospital Community | Permit type: Flood fence flood permit, fence | Permit status: Wdn | Current use: Hospital/institutional, existing | Permit id: Pmt2006-03149
2006/08/16300009511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Partial tear-off & overlay at boulder community hospital. Mechanical penthouse area, 13 squares, low pitch, fibertite 45-mil fully adhered pvc system.
Date:  August 9, 2006
Value:   $13,408
Contractor: Black Roofing Inc

Client: Hospital Community | Permit type: Roofing | Permit status: Cmp | Completion date: August 11, 2006 | Current use: Hospital/institutional, existing | Permit id: Pmt2006-03225
2006/08/09134089511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
95
Remodel er to add aid station area. Move plumbing fixtures. No new plumbing fixtures.
Date:  November 15, 2006
Value:   $5,950

Client: Hospital Community | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: February 22, 2007 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2006-04813
2006/11/1559509511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Remodel of third floor of hospital. Includes electrical, plumbing and mechanical.
Date:  March 21, 2007
Value:   $876,143

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: May 20, 2008 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2007-00263
2007/03/218761439511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Interior work only -- to consist of renovation of pharmacy area to comply with jacho standards. Relocation of 1 existing sink -- no new fixtures this permit.
Date:  March 21, 2007
Value:   $77,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: May 14, 2007 | Current use: Hospital/institutional, remodel | Permit id: Pmt2007-00469
2007/03/21770009511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Replacement of mri magnet requires demo of path to remove magnet. Restore path.
Date:  April 11, 2007
Value:   $35,083

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 5, 2007 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2007-00958
2007/04/11350839511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
99
Removal of conduit in anticipation of replacement of magnet for mri unit. After installation, re-install conduit, hook-up controller for mri chiller unit.
Date:  May 1, 2007
Value:   $5,193

Client: Hospital Community | Permit type: Electrical | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2007-01629
2007/05/0151939911 Balsam Av Boulder CoMontgomery Electric Inc
SCORE
95
Interior tenant remodel to change hallway to storage room. Includes removing exterior door.
Date:  June 15, 2007
Value:   $7,500

Client: Hospital Community | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2007-01862
2007/06/1575009511 Balsam Av Boulder CoMelton Construction, Inc
SCORE
99
Tennant finish boulder community behavioral health fire alarm
Date:  August 23, 2007
Value:   $7,881

Client: Hospital Community | Permit type: Fire, flood accessory/remodel | Permit status: Cmp | Completion date: October 3, 2007 | Current use: Hospital/institutional, existing | Permit id: Pmt2007-03531
2007/08/2378819911 Balsam Av Boulder CoMontgomery Electric Inc
See lur2007-00075 floodplain development permit.

Client: Hospital Community | Permit type: Flood floodproof structure | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2007-04599
09511 Balsam Av Boulder Co
SCORE
95
Roofing permit for partial tear-off and overlay for 9. 5 squares of fibertite roofing at a 1 4inch slope.
Date:  October 23, 2007
Value:   $7,560
Contractor: Black Roofing Inc

Client: Hospital Community | Permit type: Roofing | Permit status: Cmp | Completion date: September 9, 2008 | Current use: Medical and dental clinics, existing | Permit id: Pmt2007-04736
2007/10/2375609511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
95
Interior remodel of operating rooms 1,6 and 7 at boulder community hospital. Work includes new finishes, doors and hardware, drywall, cabinetry, accessories, and associated electrical, mechanical and plumbing.
Date:  March 7, 2008
Value:   $36,300

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Hospital/institutional, remodel | Permit id: Pmt2008-00113
2008/03/07363009511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Reconfiguration of interior walls & remodel of lab area (3,4 sf) to include relocated lights, outlets, etc
Date:  April 18, 2008
Value:   $78,746

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: December 12, 2008 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2008-01011
2008/04/18787469511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Landscaping modifications reconfiguration of a parking area restricted to the use by doctors & nurses. Relocation of electrical for relocated light poles & relocated access gate controller. Utilization of existing landscaping irrigation system.
Date:  May 5, 2008
Value:   $73,073

Client: Hospital Community | Permit type: Electrical, flood lur case, sitework | Permit status: Cmp | Completion date: December 28, 2010 | Current use: Hospital/institutional, existing | Permit id: Pmt2008-01012
2008/05/05730739511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Remodel of existing orthopedic rehabilitiation unit including new flooring, millwork, headwall units, act, doors and all work associated with reconfiguring two patient rooms. 13,8 sf. Plumbing fixture relocates only.
Date:  July 3, 2008
Value:   $741,839

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: May 8, 2009 | Current use: Hospital/institutional, tenant remodel | Permit id: Pmt2008-01637
2008/07/037418399511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Remove relocate storm inlet. Install new inchtype dinch inlet in ne parking lot
Date:  May 19, 2008

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-01987
2008/05/1909511 Balsam Av Boulder CoValley Excavating Inc
SCORE
95
Place a dumpster in the r. O. W. S. Side of bldg along alpine between loading dock entrance and patient loading unloading pull-out, (approx. Mos.)
Date:  July 10, 2008

Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-02794
2008/07/1009511 Balsam Av Boulder CoGolden Triangle Const, Inc
SCORE
95
Overlay of existing cancer center roof, fibertite 45-mil fleece back, fully adhered, 21 squares, 3 12 pitch.
Date:  October 10, 2008
Value:   $13,861
Contractor: Black Roofing Inc

Client: Hospital Community | Permit type: Roofing | Permit status: N&v | Current use: Medical and dental clinics, existing | Permit id: Pmt2008-04500
2008/10/10138619511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
99
Installation of seven (7) new isolation panels.
Date:  December 10, 2008
Value:   $40,000

Client: Hospital Community | Permit type: Electrical | Permit status: Cmp | Completion date: January 8, 2009 | Current use: Hospital/institutional, existing | Permit id: Pmt2008-05252
2008/12/10400009911 Balsam Av Boulder CoIntermountain Electric, Inc
SCORE
95
Remodel of cath lab area (569 sf) to include relocation addition of lights.& outlets, new electrical circuits, removal reinstallation of hvac ductwork, removal of existing reflected ceiling -- reinstallation of new ceiling at a minimum height of 8foot 11inch (raise & reinstall sprinkler heads) for anticipated installation of a new mri machine. No plumbing.
Date:  December 18, 2008
Value:   $33,823

Client: Hospital Community | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Cmp | Completion date: March 24, 2009 | Current use: Hospital/institutional, remodel | Permit id: Pmt2008-05285
2008/12/18338239511 Balsam Av Boulder CoGolden Triangle Const., Inc
SCORE
95
Overlay roof of north wing of boulder community hospital with fibertite fleeceback, 1 squares.
Date:  December 31, 2008
Value:   $50,239
Contractor: Black Roofing Inc

Client: Hospital Community | Permit type: Roofing | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2008-05518
2008/12/31502399511 Balsam Av Boulder CoBlack Roofing Inc
SCORE
95
Temporary capture of on-street parking area along alpine for placement of roll-off dumpster

Client: Hospital Community | Permit type: Right-of-way | Permit status: Act | Permit id: Pmt2011-01121
09511 Balsam Av Boulder CoGolden Triangle Const, Inc
SCORE
95
Sowl, fs - replace 128 standard response sprinklers with qr, same k, same temp rating.
Value:   $2,000

Client: Of City | Permit type: Fire | Permit status: Iss | Current use: Hospital/institutional, existing | Permit id: Pmt2016-01720
20009511 Balsam Av Boulder CoFire Inspection Services Llc
SCORE
95
Addition and remodel
Date:  July 11, 2000
Value:   $200,000

Client: Patricia Monroe,Robert Mahoney | Applicant: Odom Construction Company | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d
2000/07/11200000953 Balsam Av Boulder CoOdom Construction Company
SCORE
95
Addition and remodel
Date:  July 11, 2000
Value:   $200,000

Client: Patricia Monroe | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Single family detached dwelling, additio | Permit id: Pmt2000-02267
2000/07/11200000953 Balsam Av Boulder CoOdom Construction Company
SCORE
100
Remodel on first floor emergency room area
Date:  September 1, 2005
Value:   $113,330

Client: Hospital Community | Applicant: Golden Triangle Const., Inc. | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 9, 2005 | Current use: Medical and den
2005/09/0111333010011 Balsam Boulder CoGolden Triangle Const. Inc
SCORE
95
Installation of a new 7 ton rtu and removal replacement of an exhaust fan for autopsy room. Mechanical only this permit, electrical by separate permit.
Date:  May 16, 2005

Client: Hospital Community | Applicant: Mtech Mechanical Technologies | Permit type: Mechanical, flood no | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Hospital/instit
2005/05/1609511 Balsam Boulder CoMtech Mechanical Technologies
SCORE
100
Electrical run to morgue exhaust fan (see pmt2005-01662 for mech permit).
Date:  May 18, 2005

Client: Hospital Community | Applicant: Intermountain Electric Inc | Permit type: Electrical | Permit status: N&v | Current use: Hospital/instit
2005/05/18010011 Balsam Boulder CoIntermountain Electric Inc
SCORE
100
Boulder hospital magnet 11 balsam st. Remove & install 5 existing fire sprinklers for new.
Date:  April 9, 2007
Contractor: Fire Defense Inc

Client: Hospital Community | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 8, 2011 | Current use: Hospital/instit
2007/04/09010011 Balsam Boulder CoFire Defense Inc
SCORE
95
Boulder hospital magnet 11 balsam st. Remove & install 5 existing fire sprinklers for new.
Date:  April 11, 2007
Value:   $500
Contractor: Fire Defense, Inc

Client: Hospital Community | Permit type: Fire | Permit status: Cmp | Completion date: April 8, 2011 | Current use: Hospital/institutional, existing | Permit id: Pmt2007-01251
2007/04/115009511 Balsam Boulder CoFire Defense, Inc
SCORE
95
Installation of a new 7 ton rtu and removal replacement of an exhaust fan for autopsy room. Mechanical only this permit, electrical by separate permit.
Date:  May 26, 2005
Value:   $62,350

Client: Hospital Community | Permit type: Mechanical, flood not required | Permit status: Cmp | Completion date: August 3, 2007 | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01662
2005/05/26623509511 Balsam Boulder CoMtech Mechanical Technologies
SCORE
100
Electrical run to morgue exhaust fan (see pmt2005-01662 for mech permit).
Date:  May 18, 2005
Value:   $4,000

Client: Hospital Community | Permit type: Electrical | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2005-01882
2005/05/18400010011 Balsam Boulder CoIntermountain Electric Inc
SCORE
95
Remodel on first floor emergency room area
Date:  September 1, 2005
Value:   $29,000

Client: Hospital Community | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: December 9, 2005 | Current use: Medical and dental clinics, remodel | Permit id: Pmt2005-03412
2005/09/01290009511 Balsam Boulder CoGolden Triangle Const., Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.