Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Reroof of a single-family dwelling: remove existing built-up roof, replace wet damaged rigid insulation, epdm, 25 squares, flat - adding 1 4" ft. Slope Date: October 25, 2004 Contractor: Boulder Roofing Inc Client: Robert Davis,Helen Davis | Applicant: Boulder Roofing, Inc. | Permit type: Roofing | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Installing a forced air furnace and comfort cooling system. Date: June 1, 2001 Contractor: Murphey Heating And A C Inc Client: Robert Davis,Helen Davis | Applicant: Murphey Heating And A C Inc | Permit type: Mechanical | Permit status: N&v | Current use: Single family d | |||||
SCORE 65 Second floor addition and remodel addition of first floor. Client: Thomas Higley | Applicant: Thomas Higley | Permit type: Building, electrical | Permit status: N&v | Current use: Single family d | |||||
SCORE 65 Rear yard wood deck w stairs (533 sf). (see pmt2008-01372 for grading plan) see case notes. Client: Thomas Higley | Applicant: Thomas Higley | Permit type: Building | Permit status: Cmp | Completion date: January 19, 2012 | Current use: Single family d | |||||
SCORE 65 Construction of 1 lineal feet of maximum 7foot high wooden fencing and lineal feet of 4. 5foot high retaining wall. Scope of work does not include wire fence at near west property line that is mentioned in lac autorization. See his2008-00248 for specifics. Date: March 19, 2009 Contractor: Thomas Higley Client: Thomas Higley | Applicant: Thomas Higley | Permit type: Fence | Permit status: N&v | |||||
SCORE 100 In property sanitary sewer service repair relocation Date: September 11, 2014 Contractor: Nixcavating Inc Client: Thomas Higley | Applicant: Nixcavating, Inc | Permit type: Wastewater | Permit status: Iss | |||||
SCORE 95 Addition and remodel to an existing foundation shell -- uninhabited basement level of 1,291sf to be remodeled with a two story addition of 3,369 sf consisting of 5 bedrooms, 2 three-quarter bathrooms, and 2 full bathrooms. Two gas fireplaces, high-efficiency boiler w sidearm, in-floor hydronic heating. 2 in proches & decks, attached 2 car garage -- 5 sf. See pmt2008-01372 and his2012-00026 for supplemental information. Client: John Canova, Canova | Applicant: Morningstar Homes | Permit type: Building, electrical | Permit status: Tco | Current use: Single family d | |||||
SCORE 95 Remove replace curb cut Date: September 6, 2013 Contractor: Bioterra Constructors Inc Client: John Canova, Canova | Applicant: Bioterra Constructors Inc | Permit type: Right-of-way | Permit status: Iss | |||||
Construction of 1 lineal feet of maximum 7foot high wooden fencing and lineal feet of 4. 5foot high retaining wall. Scope of work does not include wire fence at near west property line that is mentioned in lac autorization. See his2008-00248 for specifics. Date: March 24, 2009 Value: $10,000 Client: Thomas Higley | Permit type: Fence | Permit status: N&v | Permit id: Pmt2009-00267 | |||||
SCORE 95 In property sanitary sewer service repair relocation Date: September 11, 2014 Contractor: Nixcavating, Inc Client: Thomas Higley | Permit type: Wastewater | Permit status: Iss | Permit id: Pmt2009-01613 | |||||
SCORE 100 Installing a forced air furnace and comfort cooling system. Client: Robert Davis | Permit type: Mechanical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2001-02248 | |||||
SCORE 95 Addition and remodel to an existing foundation shell -- uninhabited basement level of 1,291sf to be remodeled with a two story addition of 3,369 sf consisting of 5 bedrooms, 2 three-quarter bathrooms, and 2 full bathrooms. Two gas fireplaces, high-efficiency boiler w sidearm, in-floor hydronic heating. 2 in proches & decks, attached 2 car garage -- 5 sf. See pmt2008-01372 and his2012-00026 for supplemental information. Client: John Canova | Permit type: Building, electrical, mechanical, plumbing, water, wastewater, siding, roofing | Permit status: Cmp | Completion date: January 22, 2016 | Current use: Single family detached dwelling, additio | Permit id: Pmt2012-02277 | |||||
Second floor addition and remodel addition of first floor. Date: September 30, 2008 Value: $432 Client: Thomas Higley | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: N&v | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-01372 | |||||
Rear yard wood deck w stairs (533 sf). (see pmt2008-01372 for grading plan) see case notes. Date: January 20, 2009 Value: $10 Client: Thomas Higley | Permit type: Building | Permit status: Cmp | Completion date: January 19, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05443 | |||||
SCORE 95 Reroof of a single-family dwelling: remove existing built-up roof, replace wet damaged rigid insulation, epdm, 25 squares, flat - adding 1 4inch ft. Slope Client: Robert Davis | Permit type: Roofing | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-04140 | |||||
Second floor addition and remodel addition of first floor. Date: September 30, 2008 Value: $432,130 Client: Thomas Higley | Permit type: Building, electrical, mechanical, plumbing, water | Permit status: N&v | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-01372 | |||||
Rear yard wood deck w stairs (533 sf). (see pmt2008-01372 for grading plan) see case notes. Date: January 20, 2009 Value: $10,175 Client: Thomas Higley | Permit type: Building | Permit status: Cmp | Completion date: January 19, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05443 |