Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 5. 12 kw solar system with micro invertors Date: April 11, 2017 Contractor: Upright Electrical Services Permit type: Electrical | Permit status: Permit closed | Completion date: April 24, 2017 | Expiration date: April 11, 2018 | Current use: Single family / duplex | Permit id: 6590971 |