Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 99 New service Date: May 11, 2005 Contractor: Slater Electric Client: Valerie Dulk-Jacobs | Applicant: Slater Electric | Permit type: Electrical | Permit status: Cmp | Completion date: June 27, 2005 | Current use: Single family d | |||||
SCORE 100 Demolition of an existing sfd as approved under his2012-00250. Date: April 25, 2013 Contractor: Hughes Construction Co Client: Steven Phillips,Tila Phillips | Applicant: Hughes Construction Co | Permit type: Demolition | Permit status: Cmp | Completion date: March 31, 2014 | |||||
SCORE 95 Temporary construction power. Date: April 29, 2013 Contractor: Excel Electric Applicant: Excel Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family a | |||||
SCORE 100 New 4227 square foot single family residence with 5 bedrooms, 4 bathrooms. 23 square foot basement, 1907 square foot main level, 288 square foot attached garage, 228 square foot front porch, and 3 square foot roof top deck. See his2012-002 for lac and boz2013-00004 for variance. Includes associated mep. Client: Steven Phillips,Tila Phillips | Applicant: Hughes Construction Co | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 100 Occupy row traffic control impacts Date: August 28, 2013 Contractor: Firm Foundations Inc Client: Steven Phillips,Tila Phillips | Applicant: Firm Foundations, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Abandon existing 3 4inch tap service, tap install new 1inch water service meter, tap install new 4inch sanitary sewer service, associated with bldg pmt2013-01937 Date: January 6, 2014 Contractor: Ez Excavating Inc Client: Steven Phillips,Tila Phillips | Applicant: E-Z Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Installation of a flush mount 9. 81 kw photovoltaic system. Array to be parallel to roof plane on a flat roof, grid tied and remain below ridge parapet, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Date: January 6, 2014 Contractor: Independent Power Systems Client: Steven Phillips,Tila Phillips | Applicant: Independent Power Systems | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 3, 2014 | Current use: Single family d | |||||
SCORE 100 Install new underground electric primary for new home via bore Date: June 6, 2014 Contractor: Xcel Energy Client: Steven Phillips,Tila Phillips | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 R&r detached sidewalk, r&r drive cut and replace with curb gutter, install new drive cut access. Date: August 22, 2014 Contractor: Norris Concrete Contractors Llc Client: Steven Phillips,Tila Phillips | Applicant: Norris Concrete Contractors Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 New 4227 square foot single family residence with 5 bedrooms, 4 bathrooms. 23 square foot basement, 1907 square foot main level, 288 square foot attached garage, 228 square foot front porch, and 3 square foot roof top deck. See his2012-002 for lac and boz2013-00004 for variance. Includes associated mep. Client: Steven Phillips | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new | Permit id: Pmt2013-01937 | |||||
SCORE 95 Occupy row traffic control impacts Date: August 28, 2013 Contractor: Firm Foundations, Inc Client: Steven Phillips | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-04306 | |||||
SCORE 95 Abandon existing 3 4inch tap service, tap install new 1inch water service meter, tap install new 4inch sanitary sewer service, associated with bldg pmt2013-01937 Date: January 6, 2014 Contractor: E Z Excavating Inc Client: Steven Phillips | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-00053 | |||||
SCORE 100 Installation of a flush mount 9. 81 kw photovoltaic system. Array to be parallel to roof plane on a flat roof, grid tied and remain below ridge parapet, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. Client: Steven Phillips | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 3, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00071 | |||||
Install new underground electric primary for new home via bore Date: June 6, 2014 Client: Steven Phillips | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-02399 | |||||
SCORE 99 New service Client: Valerie Dulk-Jacobs | Permit type: Electrical | Permit status: Cmp | Completion date: June 27, 2005 | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-01758 |