Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Remodel of 2 units of a 4-plex. Reconfigure and eliminate a bedroom on the main floor (elimintation of bedroom 5 and expand dining area), reconfigure and add bathroom to second floor unit (partition wall to create hallway for bedroom access on second floor). Client: Housing Boulder | Applicant: Adam Stenftenagel | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 18, 2005 | Current use: Multifamily dwe | |||||
SCORE 93 Installation of rooftop, tilt-mounted 4. 375 kw photovoltaic solar system. Date: February 17, 2009 Contractor: Standard Renewable Energy Client: Community Bhc | Applicant: Standard Renewable Energy | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2009 | Current use: Single family d | |||||
SCORE 93 Service upgrade to 2 amps. Date: March 10, 2009 Contractor: Standard Renewable Energy Client: Community Bhc | Applicant: Standard Renewable Energy | Permit type: Electrical | Permit status: Cmp | Completion date: March 19, 2009 | Current use: Single family a | |||||
SCORE 70 Electrical permit - installation of smoke detectors and removal of knob & tube in basement. Date: April 8, 2009 Contractor: Seek Electric Client: Community Bhc | Applicant: Seek Electric | Permit type: Electrical | Permit status: Cmp | Completion date: April 15, 2009 | Current use: Single family d | |||||
SCORE 95 Removal of four gas meters and installation of a house meter to be relocated. Date: July 8, 2009 Contractor: Sammons Plumbing And Heating Client: Community Bhc | Applicant: Sammons Plumbing & Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: July 22, 2009 | Current use: Multifamily dwe | |||||
SCORE 95 Install backflow preventer Date: July 22, 2009 Contractor: Sammons Plumbing And Heating Client: Community Bhc | Applicant: Sammons Plumbing & Heating | Permit type: Plumbing | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 95 Repairs and improvements to existing cooperative housing unit. Scope includes residing with stucco (including exterior rigid foam), re-roof of building, new railing at exterior stairs, plumbing repairs fixture swaps at kitchen and three baths, replacement of boiler, replacement of kitchen hood, addition of two skylights and miscellaneous electrical repairs. Existing pv system will be removed and reinstalled after reroof. Client: Community Bhc | Applicant: Blue Spruce Design & Const | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d | |||||
SCORE 95 Place dumpster in street row, place storage pod in street row for less than 7 days only Date: May 5, 2015 Contractor: Blue Spruce Design And Const Client: Community Bhc | Applicant: Blue Spruce Design & Const | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 89 Fs - es - new 13r system for boulder housing :::revision 6 25 2015 new dry spk system for cottage::: Date: May 26, 2015 Contractor: Total Fire Protection West Client: Community Bhc | Applicant: Total Fire Protection West | Permit type: Fire | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 95 Tap install new fireline, 4inch tap valve then reduce to 2inch applicant to verify correct sizing with fire marshal Date: June 18, 2015 Contractor: Rays Backhoe Service Client: Community Bhc | Applicant: Rays Backhoe Service | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Fa - es - new residential system w lf Date: July 17, 2015 Contractor: First Call Electric And Fire Inc Client: Community Bhc | Applicant: First Call Electric & Fire, Inc | Permit type: Fire | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 93 Installation of rooftop, tilt-mounted 4. 375 kw photovoltaic solar system. Client: Community Bhc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00506 | |||||
SCORE 93 Service upgrade to 2 amps. Client: Community Bhc | Permit type: Electrical | Permit status: Cmp | Completion date: March 19, 2009 | Current use: Single family attached dwelling, existin | Permit id: Pmt2009-00782 | |||||
SCORE 70 Electrical permit - installation of smoke detectors and removal of knob & tube in basement. Client: Community Bhc | Permit type: Electrical | Permit status: Cmp | Completion date: April 15, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01144 | |||||
SCORE 95 Removal of four gas meters and installation of a house meter to be relocated. Client: Community Bhc | Permit type: Mechanical | Permit status: Cmp | Completion date: July 22, 2009 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-02596 | |||||
SCORE 95 Install backflow preventer Client: Community Bhc | Permit type: Plumbing | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-02813 | |||||
SCORE 95 Repairs and improvements to existing cooperative housing unit. Scope includes residing with stucco (including exterior rigid foam), re-roof of building, new railing at exterior stairs, plumbing repairs fixture swaps at kitchen and three baths, replacement of boiler, replacement of kitchen hood, addition of two skylights and miscellaneous electrical repairs. Existing pv system will be removed and reinstalled after reroof. Client: Community Bhc | Permit type: Building, electrical, mechanical, plumbing, siding, roofing | Permit status: Cmp | Completion date: October 15, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2015-00492 | |||||
SCORE 98 Place dumpster in street row, place storage pod in street row for less than 7 days only Date: May 5, 2015 Contractor: Blue Spruce Constuction Services Client: Community Bhc | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-01660 | |||||
SCORE 89 Fs - es - new 13r system for boulder housing :::revision 6 25 2015 new dry spk system for cottage::: Client: Community Bhc | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02029 | |||||
SCORE 89 Fa - es - new residential system w lf Client: Community Bhc | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02922 | |||||
SCORE 99 Place dumpster in street row, place storage pod in street row for less than 7 days only Date: May 5, 2015 Contractor: Blue Spruce Const Services Client: Community Bhc | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-01660 | |||||
SCORE 100 Remodel of 2 units of a 4-plex. Reconfigure and eliminate a bedroom on the main floor (elimintation of bedroom 5 and expand dining area), reconfigure and add bathroom to second floor unit (partition wall to create hallway for bedroom access on second floor). Client: Housing Boulder | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: March 18, 2005 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2004-04572 |