Shoreline exemption for adjustments to existing utility that is for construction activities of the elliott bay seawall project. Applicant: Babby, Elaine | Permit type: Construction | Permit id: 6363160 | |||||
Shoreline exemption for adjustments to existing utility that is for construction activities of the elliott bay seawall project. Applicant: Babby, Elaine | Permit type: Construction | Permit id: 6363160 | |||||
Shoreline exemption for adjustments to existing utility that is for construction activities of the elliott bay seawall project. Applicant: Babby, Elaine | Permit type: Construction | Permit id: 6363160 | |||||
Shoreline exemption for adjustments to existing utility that is for construction activities of the elliott bay seawall project. Applicant: Babby, Elaine | Permit type: Construction | Permit id: 6363160 | |||||
SCORE 95 Shoreline substantial development application to replace the elliott bay seawall with a new wall to 15 feet east of the existing wall alignment. The replaced seawall will extend from broad st. To s washington st. Project includes construction of a public view deck (spring st.) and restoration of sidewalks and roadway, grading of 500,0 cu. Yds. Of material and installation of habitat enhancement features waterward of the seawall. Environmental impact statement prepared by city of seattle department of transportation. Applicant: Mazzola, Mark | Permit type: Other land use actions, sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Permit issued | Current use: Industrial | Permit id: 3013171 | |||||
SCORE 95 Shoreline exemption to conduct exploratory investigations at various locations along the central waterfont in preparation for the replacement of the elliott bay seawall, the central seawall (phase 1) and the north seawall (phase 2). Contractor: Seattle Transportation Applicant: Page, Heather | Permit type: Construction | Current use: Commercial | Permit id: 6298435 | |||||
Shoreline exemption for adjustments to existing utility that is for construction activities of the elliott bay seawall project. Applicant: Babby, Elaine | Permit type: Construction | Permit id: 6363160 | |||||
SCORE 99 Temp power for pier construction seawall. Waive plan review per rm. Permit type: Electrical | Permit status: Permit issued | Expiration date: April 13, 2018 | Current use: Industrial | Permit id: 6591653 | |||||
SCORE 99 Install a generator for water treatment at pier 62/63 Permit type: Electrical | Permit status: Permit issued | Expiration date: January 15, 2017 | Current use: Industrial | Permit id: 6513991 | |||||
SCORE 95 Remove and construct replacement pier 62 and construct alterations to pier 63, occupy per plan. Applicant: Graves, David | Permit type: Construction | Permit status: Permit issued | Expiration date: March 26, 2019 | Current use: Industrial | Permit id: 6595132 | |||||
SCORE 95 Shoreline substantial development application to demolish and replace existing timber deck and supporting timber piles of pier 62 and a portion of pier 63 with concrete deck and new steel piles. Project includes new float system (boat moorage) and gangway to the south side of pier 62 (3,0 sq. Ft.) for small boat moorage. Determination of non-significance and central waterfront master parks plan eis dated 2006 has been prepared by seattle parks department. Applicant: Graves, David | Permit type: Sepa threshold determination, shoreline development | Permit status: Application accepted | Current use: Institutional | Permit id: 3023315 |