Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 85 Add three awning at one boulder plaza Client: Broadway Vail | Applicant: Broadway Vail | Permit type: Building, awning | Permit status: Cmp | Completion date: June 11, 2008 | Current use: Commercial/reta | |||||
SCORE 95 Sign permit for non-illuminated awning signs "vics coffee" Date: June 22, 2006 Contractor: King Sign Llc Client: Lizard Vail | Applicant: King Sign Llc | Permit type: Sign | Permit status: Cmp | Completion date: April 21, 2008 | Current use: Restaurant, exi | |||||
SCORE 95 Add staircase to one boulder plaza. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 100 Network appliance Date: July 13, 2005 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Office - profes | |||||
SCORE 95 Installation of 2 new externally illuminated suspended signs (to show different tenants on each face) and one new internally illuminated wall sign, "one boulder fitness" Date: February 13, 2006 Contractor: King Sign Llc Client: Lizard Vail | Applicant: King Sign Llc | Permit type: Sign | Permit status: N&v | Current use: Amusement/recre | |||||
SCORE 95 Remodel of existing tenent space move two partition walls and add door to space. Add outlets;change heat runs and return air Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: March 13, 2008 | Current use: Office - profes | |||||
SCORE 100 Erect 3 permanent wall signs. Illuminated internally. "one boulder plaza" and "18 broadway" Date: December 2, 2005 Contractor: Adcon Inc Client: Broadway Vail | Applicant: Adcon, Inc. | Permit type: Sign | Permit status: Cmp | Completion date: May 5, 2006 | Current use: Commercial/reta | |||||
SCORE 100 One boulder fitness-fire alarm Date: November 18, 2005 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: February 3, 2006 | Current use: Amusement/recre | |||||
SCORE 100 Relocation and some additions of one boulder fitness Date: November 17, 2005 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: February 3, 2006 | Current use: Amusement/recre | |||||
SCORE 100 Vics coffee shop fire alarm tenant finish Date: October 25, 2005 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Restaurant, exi | |||||
SCORE 95 Underground plumbing for health club. Date: October 20, 2005 Contractor: Wyatt Construction Company Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Plumbing | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Vics coffee shop- add and relocate for sprinkler heads Date: October 19, 2005 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 28, 2005 | Current use: Restaurant, exi | |||||
SCORE 95 Installation of ductwork for potential future hoods in restaurants not yet built. Ducts will be installed in rated shafts which will be built under the core and shell permit. Mechanical only this permit. Date: October 15, 2003 Contractor: Wyatt Construction Company Client: Lizard Vail | Applicant: Wyatt Construction Company | Permit type: Mechanical, flood no | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Commercial/reta | |||||
SCORE 95 Remove signs from 4 existing canopies, replace signage on 2 only. Signs will read "h&r block, financial advisors". No changing to existing lighting. See also pmt 2005-03084 for three other signs this property. Date: August 8, 2005 Contractor: Royal Signs Inc Client: Broadway Vail | Applicant: Royal Signs, Inc. | Permit type: Sign | Permit status: Cmp | Completion date: March 3, 2008 | Current use: Office - profes | |||||
SCORE 95 One new externally illuminated wall sign, and two new suspended signs, all illuminated by existing external lighting, and which read "h&r block financial advisors" see also pmt 2005-03083 for two other signs this same address. Date: August 8, 2005 Contractor: Royal Signs Inc Client: Broadway Vail | Applicant: Royal Signs, Inc. | Permit type: Sign | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Office - profes | |||||
SCORE 100 Network appliance ste 100 Date: July 26, 2005 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Office - profes | |||||
SCORE 95 Tenant finish for body ballance fitness center in unit #107. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: N&v | Current use: Amusement/recre | |||||
SCORE 95 Electrical wiring for basement tenant areas. Date: March 30, 2000 Contractor: Merit Electric Inc Client: Broadway Vail | Applicant: Merit Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 24, 2000 | Current use: Office - admini | |||||
SCORE 93 Tenant remodel of suite #1 for computer software firm to install conference room, storage closet and install sink. Permit includes associated electrical, mechanical and plumbing. Client: Broadway Vail | Applicant: Layne Mitchell | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 29, 2005 | Current use: Office - profes | |||||
SCORE 95 Tenant remodel to install demising wall and relocate plumbing fixtures in suite 110. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 19, 2005 | Current use: Office - admini | |||||
SCORE 100 Fire sprinkler system - 2nd floor Date: February 8, 2005 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Tenant finish for office space. Space #204 5875sf Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Office - profes | |||||
SCORE 95 Park pump truck and concrete truck on walnut st side of site. Date: October 27, 2005 Contractor: Wyatt Construction Company Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Right-of-way | Permit status: N&v | |||||
SCORE 95 Fire suppression system - labsinthe Date: December 2, 2004 Contractor: Cintas Corporation Dba Client: Broadway Vail | Applicant: Cintas Corporation Dba | Permit type: Fire | Permit status: Cmp | Completion date: March 10, 2005 | Current use: Restaurant, exi | |||||
SCORE 100 Fire sprinkler system - 3rd floor, holland and hart Date: November 4, 2004 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: December 1, 2004 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system - labsinthe Date: November 4, 2004 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 95 Construct new outdoor railing on private property. 45 feet by 6 feet. 22 chairs.. No block of entry ways. Client: Vail Broadway Partnership Llp | Applicant: Wyatt Construction Company | Permit type: Building | Permit status: Cmp | Completion date: January 7, 2008 | Current use: Restaurant, exi | |||||
SCORE 89 Fire suppression system - bombay bistro Date: October 13, 2004 Contractor: Abbott Fire And Safety Inc Client: Broadway Vail | Applicant: Abbott Fire & Safety, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: May 30, 2008 | Current use: Restaurant, exi | |||||
SCORE 100 Fire alarm system - holland and hart Date: September 27, 2004 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2005 | Current use: Office - profes | |||||
SCORE 100 Fire alarm system - owners improvement Date: September 22, 2004 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: October 4, 2004 | Current use: Commercial/reta | |||||
SCORE 95 Interior tenant finish to install a new professional office (holland & hart) on the entire third floor of the building (20,056 s. F.). Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Office - profes | |||||
SCORE 85 Interior tenant finish to install "labsinthe" restaurant (3,093 s. F.) in suite 150. Occupant load 117. Client: Broadway Vail | Applicant: Broadway Vail | Permit type: Building, electrical | Permit status: Cmp | Current use: Restaurant, ten | |||||
SCORE 100 Fire alarm system - bombay bistro Date: September 10, 2004 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Restaurant, exi | |||||
SCORE 100 Fire alarm system - labsinthe Date: September 10, 2004 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: May 30, 2008 | Current use: Restaurant, exi | |||||
SCORE 95 Interior tenant remodel to add interior non-bearing partition walls in suite #100. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system - bombay bistro Date: August 25, 2004 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 89 Tenant remodel - includes building and electrical Client: Broadway Vail | Applicant: Deneuve Construction | Permit type: Building, elevator | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Office - admini | |||||
SCORE 95 Tenant finish (first floor, ne corner) to install a new restaurant called "bombay bistro." plumbing by separate permit. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Restaurant, ten | |||||
SCORE 95 Plumbing permit for a new restaurant ("bombay bistro") at the ne corner of the first floor. See pmt2004-02659 for general permit for tenant finish. Date: July 30, 2004 Contractor: Wyatt Construction Company Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Plumbing | Permit status: Cmp | Completion date: October 27, 2004 | Current use: Restaurant, exi | |||||
SCORE 100 New sidewalk, curb and gutter Date: April 13, 2004 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Fire sprinkler system - caplan & earnest Date: April 7, 2004 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Basement remodel to add hall and storage units. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 100 Fire alarm system - suite 200 Date: February 14, 2004 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 26, 2004 | Current use: Office - profes | |||||
SCORE 98 Two crane sets for 18 broadway on saturday 2 28 04 Date: February 17, 2004 Contractor: Sterling Crane Llc Client: Broadway Vail | Applicant: Sterling Crane Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 New four stop, 35 pound hydraulic passenger elevator. Sprinkler yes, thyssenkrupp er8909 Date: January 30, 2004 Contractor: Thyssenkrupp Elevator Client: Broadway Vail | Applicant: Thyssenkrupp Elevator | Permit type: Elevator | Permit status: Cmp | Completion date: April 14, 2004 | Current use: Commercial/reta | |||||
SCORE 95 Tenant finish for a new law office at the north end of the second floor. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Office - profes | |||||
SCORE 100 Fire alarm system - core & shell Date: November 28, 2003 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 26, 2004 | Current use: Commercial/reta | |||||
SCORE 95 Installation of a fire sprinkler system. Date: March 17, 2000 Contractor: Wyco Fire Protection Inc Client: Broadway Vail | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: May 22, 2000 | Current use: Commercial/reta | |||||
SCORE 100 Sidewalk closure Date: September 26, 2003 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Construction trailer Date: September 26, 2003 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 85 1 1 2" water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Contractor: Broadway Vail Client: Broadway Vail | Applicant: Broadway Vail | Permit type: Water | Permit status: Act | |||||
SCORE 85 2" water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Contractor: Broadway Vail Client: Broadway Vail | Applicant: Broadway Vail | Permit type: Water | Permit status: Act | |||||
SCORE 100 Fire alarm system - 2nd floor (ww reynolds) Date: February 28, 2005 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2005 | Current use: Office - profes | |||||
SCORE 100 1" meter installation for irrigation Date: April 1, 2003 Contractor: Wyatt Construction Co Inc Client: Lizard Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Water | Permit status: Act | |||||
SCORE 79 City of boulder project - barb kenyon; project manager 2" water & 6" sewer taps Date: March 17, 2003 Contractor: Lizard Vail Client: Lizard Vail | Applicant: Lizard Vail | Permit type: Water, wastewater | Permit status: Act | |||||
SCORE 85 Wastewater Date: May 13, 2002 Contractor: Broadway Vail Client: Broadway Vail | Applicant: Broadway Vail | Permit status: Act | |||||
SCORE 85 6" fireline tap (all fees for this permit are associated with pmt2002-03786) Date: November 4, 2002 Contractor: Broadway Vail Client: Broadway Vail | Applicant: Broadway Vail | Permit status: Act | Current use: Commercial/reta | |||||
SCORE 95 Above grade core and shell, addition and remodel for a mixed use office retail building. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Commercial/reta | |||||
SCORE 79 Date: May 16, 2003 Contractor: Lizard Vail Client: Lizard Vail | Applicant: Lizard Vail | Permit status: Act | |||||
SCORE 98 Install 2 backflow cross-connection valves for domestic water system Date: March 9, 2000 Contractor: Metro Mechanical Services Inc Client: Vail Broadway Parntership Llp | Applicant: Metro Mechanical Services Inc | Permit type: Plumbing | Permit status: Cmp | Completion date: October 22, 2000 | Current use: Office - admini | |||||
SCORE 100 Man hole tap Date: May 16, 2002 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Wastewater | Permit status: Act | |||||
SCORE 100 Install new sewer Date: May 10, 2002 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Placing hand holes and boring pipe across broadway city project john campanola Date: May 28, 2002 Contractor: Mastec North America Inc Client: Broadway Vail | Applicant: Mastec North America, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 89 Electrical permit to relocate lateral piping. Date: April 30, 2002 Contractor: Encompass Electrical Tech Client: Lizard Vail | Applicant: Encompass Electrical Tech. | Permit type: Electrical | Permit status: Cmp | Completion date: May 10, 2002 | Current use: Commercial/reta | |||||
SCORE 100 Construct new parking lot and entry drive cut with sidewalk chase. Date: March 27, 2002 Contractor: Wyatt Construction Co Inc Client: Broadway Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Construct new temporary parking lot on lot on north side of lot. See adr 2002-000 for admin review. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Electrical, sitework | Permit status: Cmp | Completion date: April 30, 2002 | Current use: Financial insti | |||||
SCORE 100 Install new gas meter and associated gas piping. Date: December 19, 2001 Contractor: Design Mechanical Inc Client: Broadway Vail | Applicant: Design Mechanical Inc | Permit type: Mechanical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 89 Create room for atm machine Client: Broadway Vail | Applicant: Deneuve Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 19, 2002 | Current use: Office - admini | |||||
SCORE 95 Core and shell addition to one boulder plaza. Client: Broadway Vail | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: N&v | Current use: Financial insti | |||||
SCORE 100 Fire sprinkler system - core & shell Date: December 15, 2003 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: April 30, 2004 | Current use: Commercial/reta | |||||
SCORE 95 Temporary tent 6 7 01 - 6 10 01 Client: Broadway Vail | Applicant: Rincon Development, Inc. | Permit type: Temporary event | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Fire sprinkler system - lobby area Date: February 27, 2001 Contractor: Diamond Fire Protecton Co Inc Client: Vail Broadway Partnership Llp | Applicant: Diamond Fire Protecton Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 9, 2001 | Current use: Office - profes | |||||
SCORE 95 Cut off existing gas service & install new service Date: August 9, 2001 Contractor: Xcel Client: Broadway Vail | Applicant: Xcel | Permit type: Right-of-way | Permit status: Wty | |||||
SCORE 89 Addition for new entry, bathroom remodel Client: Vail Broadway Partnership Llp | Applicant: Deneuve Construction | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 18, 2001 | Current use: Office - admini | |||||
SCORE 62 Replace 2 freestanding signs and add one wall sign for bank one. Date: July 15, 2003 Contractor: Ad Lite Sign Company Inc Client: Vail Broadway Partnership Llp | Applicant: Ad Lite Sign Company, Inc. | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 98 New split system cooling for phone room Date: May 24, 2000 Contractor: Metro Mechanical Services Inc Client: Vail Broadway Partnership Llp | Applicant: Metro Mechanical Services, Inc | Permit type: Mechanical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Tenant remodel. Includes demo of one wall, removal of a door, electric (new light fixtures), mechanical (diffusers only), and plumbing work. Client: Broadway Vail | Applicant: Deneuve Construction Services | Permit type: Building, electrical | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 Tenant finish remodel Client: Vail Commons Partnership Llp | Applicant: Rincon Development Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Office - admini | |||||
SCORE 95 Relocate south elevator disconnect Date: February 23, 2000 Contractor: Bishop Electric Client: Commons Vail, Vail | Applicant: Bishop Electric | Permit type: Electrical | Permit status: Cmp | Completion date: May 20, 2000 | Current use: Office - admini | |||||
SCORE 95 Trench 1089 l. F. To install new electric service Date: April 10, 2002 Contractor: Xcel Client: Broadway Vail | Applicant: Xcel | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 76 Install 2 new controllers - wire new traveling cable - new fixtures, handrails and cab refurnish Date: January 13, 2000 Contractor: Amtech Reliable Elevator Co Client: Commons Vail, Vail | Applicant: Amtech Reliable Elevator Co | Permit type: Elevator | Permit status: Cls | Current use: Commercial/reta | |||||
SCORE 91 Add lettering "l absinthe" to awnings. See pmt2006-0345 for awning permit Date: October 30, 2006 Contractor: Four Seasons Awning Client: Broadway Vail | Applicant: Four Seasons Awning | Permit type: Sign | Permit status: Cls | Current use: Restaurant, exi | |||||
SCORE 95 Tenant remodel to revise corner office space in suite 210. Client: Broadway Vail | Applicant: Rincon Development, Inc. | Permit type: Building | Permit status: N&v | Current use: Office - profes | |||||
SCORE 91 Sign permit to add graphics to awning. "bombay bistro modern indian cuisine" Date: July 2, 2007 Contractor: Four Seasons Awning Client: Broadway Vail | Applicant: Four Seasons Awning | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Restaurant, exi | |||||
SCORE 98 Traffic control to setup crane in the street to replace a c compressor Date: August 6, 2007 Contractor: Sterling Crane Llc Client: Broadway Vail | Applicant: Sterling Crane Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 56 Tenant remodel of suite 1 including relocation of interior partition walls, new bathroom and associated electrical and mechanical work. Client: Broadway Vail | Applicant: Mick James | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 30, 2008 | Current use: Office - profes | |||||
SCORE 100 Tenant remodel of space 105 Client: Broadway Vail | Applicant: E J C M, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - profes | |||||
SCORE 100 Tennant finsh sprinkler suite 140 Date: May 7, 2008 Contractor: Jacobs Fire Protection Inc Client: Broadway Vail | Applicant: Jacobs Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - profes | |||||
SCORE 100 Tennant finish sprinkler suite 105 morgan stanley Date: May 7, 2008 Contractor: Jacobs Fire Protection Inc Client: Broadway Vail | Applicant: Jacobs Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm Date: May 12, 2008 Contractor: Fire Alarm Services Inc Client: Broadway Vail | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - profes | |||||
SCORE 100 Tennant finish fire alarm suite 140 Date: May 29, 2008 Contractor: Fire Alarm Services Inc Client: Broadway Vail | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - profes | |||||
SCORE 95 Two proposed awning signs mounted to existing awnings. "morgan stanley" Date: June 30, 2008 Contractor: Husky Signs And Graphics Inc Client: Broadway Vail | Applicant: Husky Signs & Graphics Inc | Permit type: Sign | Permit status: N&v | Current use: Financial insti | |||||
SCORE 100 Access to manhole for splicing on canyon east of broadway Date: April 8, 2009 Contractor: Qwest Comm Centurylink Client: Lizard Vail | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Tennant finish sprinkler Date: December 15, 2009 Contractor: Firetrol Protection Systems Client: Lizard Vail | Applicant: Firetrol Protection Systems | Permit type: Fire | Permit status: Cmp | Completion date: March 5, 2010 | Current use: Office - admini | |||||
SCORE 100 Scope of work letter relocation of 9 sprinkler heads Date: August 8, 2011 Contractor: Fire Defense Inc Client: Lizard Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - profes | |||||
SCORE 88 Tenant remodel of suite 1 to create additional office area (4,388 sf ) for morgan stanley smith barney. Client: Lizard Vail | Applicant: Ia Interior Architects | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 11, 2011 | Current use: Office - admini | |||||
SCORE 99 Interior non-structural demolition associated with pmt2011-03411 Date: August 29, 2011 Contractor: Boots Construction Inc Client: Lizard Vail | Applicant: Boots Construction, Inc. | Permit type: Demolition | Permit status: Cmp | Completion date: October 11, 2011 | Current use: Office - profes | |||||
SCORE 100 Tennant finish sprinkler for morgan stanley Date: September 6, 2011 Contractor: Jacobs Fire Protection Inc Client: Lizard Vail | Applicant: Jacobs Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Financial insti | |||||
SCORE 100 Tennant finish fire alarm for morgan stanley Date: September 14, 2011 Contractor: Fire Alarm Services Inc Client: Lizard Vail | Applicant: Fire Alarm Services, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Office - profes | |||||
SCORE 100 Suite 2 -- tenant remodel of 6848 sf to create professional offices. Client: Scott Kiere | Applicant: Wyatt Construction Co, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 1, 2013 | Current use: Office - profes | |||||
SCORE 95 Suite 2 -- interior non-structural demolition. Remove existing lighting, mechanical ductwork, plumbing and interior walls. Date: September 19, 2012 Contractor: Wyatt Construction Company Client: Lizard Vail | Applicant: Wyatt Construction Company | Permit type: Demolition | Permit status: Cmp | Completion date: October 23, 2012 | Current use: Office - profes | |||||
SCORE 100 Temporary closure of sidewalk along canyon for truck access to remove & stock construction material Date: October 3, 2012 Contractor: Wyatt Construction Co Inc Client: Lizard Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 93 Installation of internally illuminated sign inchjaipur indian restaurantinch on existing awning for suite 160. No revocable required. Date: December 13, 2012 Contractor: Broomfield Sign Co Inc Client: Lizard Vail | Applicant: Broomfield Sign Co, Inc | Permit type: Sign | Permit status: Iss | Current use: Restaurant, exi | |||||
SCORE 100 Suite 105 -- remodel of 272 sf to create three offices in an existing office area; modify sink countertops in breakroom area to improve accessibility. Includes associated minor electrical, mechanical and plumbing . No net increase in number of plumbing fixtures. Client: Lizard Vail | Applicant: Milo Construction Corporation | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 6, 2013 | Current use: Office - profes | |||||
SCORE 95 Fa - tf office Date: February 12, 2013 Contractor: Fire Inspection Services Llc Client: Lizard Vail | Applicant: Fire Inspection Services Llc | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2013 | Current use: Office - admini | |||||
SCORE 95 Fs - tf Date: February 13, 2013 Contractor: Freedom Fire Protection. Llc Client: Lizard Vail | Applicant: Freedom Fire Protection. Llc | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Office - admini | |||||
SCORE 100 Suite 3 -- construction of a small wall at the entrance to inchstairway #3inch and modify the existing doorway into the stairway and install a rated glass door. Client: Lizard Vail | Applicant: Wyatt Construction Co, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 3, 2013 | Current use: Office - profes | |||||
SCORE 100 Suite 2 - interior, non-structural remodel (1,066sf) to existing professional office space. Scope of work includes updates to break room and work areas, including sound control updates. Includes associated meps. Client: Lizard Vail | Applicant: A & B Builders, Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Commercial/reta | |||||
SCORE 93 Sign. Replace existing awning sign with new internally illuminated awning sign above entrance inchone boulder plaza. Inch Date: October 10, 2013 Contractor: Broomfield Sign Co Inc Client: Lizard Vail | Applicant: Broomfield Sign Co, Inc | Permit type: Electrical, sign | Permit status: Cmp | Completion date: August 26, 2015 | Current use: Office - profes | |||||
SCORE 95 Fs - sowl - inchadd two fire sprinkler heads and relocate two fire sprinkler heads due to new wall contruction. Inch Date: October 31, 2013 Contractor: American Sprinkler Inc Client: Lizard Vail | Applicant: American Sprinkler Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 21, 2014 | Current use: Office - admini | |||||
SCORE 100 Fa - relocate 2 strobes Date: November 26, 2013 Contractor: Fire Alarm Services Inc Client: Lizard Vail | Applicant: Fire Alarm Services, Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 21, 2014 | Current use: Office - admini | |||||
SCORE 93 Occupy sidewalk to install wall signs, associated with pmt2014-02368 & pmt2014-02370 Date: July 7, 2014 Contractor: Broomfield Sign Co Inc Client: Lizard Vail | Applicant: Broomfield Sign Co, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Tenant remodel for inchone boulder plazainch. Total of 7,133sf. Scope includeswork in: lower level corridor from parking area to elevator lobbies ; second level corridor, lobbies and restrooms ; third level corridor, lobby, and restrooms. Meps included. No change in square footage or building coverage Client: Lizard Vail | Applicant: Sand Construction Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 4, 2015 | Current use: Commercial/reta | |||||
SCORE 95 Fs - es - 2nd and 3rd floor elevetor lobby tf. This scope of work is eligible for a sowl Date: March 25, 2015 Contractor: Diamond Fire Protecton Co Inc Client: Lizard Vail | Applicant: Diamond Fire Protecton Co Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 13, 2015 | Current use: Office - admini | |||||
SCORE 95 18 broadway & 1801 13th st. Interior repair remodel only of the main level corridor and main level restrooms (5,066 sq. Ft. Total). Scope of work includes associated meps, to include plumbing fixture replacement. Client: Lizard Vail | Applicant: Sand Construction Llc | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 100 Fs - es - tf for office space Date: July 17, 2015 Contractor: Extreme Fire Protection Client: Lizard Vail | Applicant: Extreme Fire Protection | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Fs - sowl - relocate 8 spks and relocate 3 Date: July 21, 2015 Contractor: Diamond Fire Protecton Co Inc Client: Lizard Vail | Applicant: Diamond Fire Protecton Co Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 100 Fa - es - add two h s. Add three strobes for halland hart Date: August 14, 2015 Contractor: Fire Alarm Services Inc Client: Lizard Vail | Applicant: Fire Alarm Services, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Fs - es - tf for 1st floor transient spaces (new wood ceiling tiles) Date: August 24, 2015 Contractor: Diamond Fire Protecton Co Inc Client: Lizard Vail | Applicant: Diamond Fire Protecton Co Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Permit to rework entry planter on west side of 18 broadway and to add lighting and repaint at the north and south courtyards between 18 broadway and 1801 13th st. Associated with pmt2016-00196 (two building permits one plan set). Scope of work referenced in minor modification approval adr2015-00078. Client: Lizard Vail | Permit type: Building | Permit status: Iss | Current use: Shed, repair | Permit id: Pmt2016-00352 | |||||
SCORE 99 Fs - tf webscale, suite 180 Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: June 15, 2016 | Current use: Office - professional, existing | Permit id: Pmt2016-01718 | |||||
SCORE 95 Close sidewalk to re connect a roof drain from the sewer to a storm drain inlet. Includes sidewalk r&r on broadway between canyon & walnut Date: June 24, 2016 Contractor: Sand Construction Llc Client: Lizard Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-02924 | |||||
Access to manhole for splicing on canyon east of broadway Date: April 8, 2009 Client: Lizard Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2009-01155 | |||||
SCORE 95 Tennant finish sprinkler Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 5, 2010 | Current use: Office - administrative, existing | Permit id: Pmt2009-05023 | |||||
SCORE 95 Fa - tf office Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-00592 | |||||
SCORE 95 Fs - tf Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: April 25, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-00605 | |||||
SCORE 95 Suite 3 -- construction of a small wall at the entrance to inchstairway #3inch and modify the existing doorway into the stairway and install a rated glass door. Client: Lizard Vail | Permit type: Building, electrical, flood accessory/remodel | Permit status: Cmp | Completion date: September 3, 2013 | Current use: Office - professional, tenant remodel | Permit id: Pmt2013-01897 | |||||
SCORE 95 Suite 2 - interior, non-structural remodel (1,066sf) to existing professional office space. Scope of work includes updates to break room and work areas, including sound control updates. Includes associated meps. Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Commercial/retail, remodel | Permit id: Pmt2013-04234 | |||||
SCORE 95 Sign. Replace existing awning sign with new internally illuminated awning sign above entrance inchone boulder plaza. Inch Client: Lizard Vail | Permit type: Electrical, sign | Permit status: Cmp | Completion date: August 26, 2015 | Current use: Office - professional, existing | Permit id: Pmt2013-04562 | |||||
SCORE 95 Fs - sowl - inchadd two fire sprinkler heads and relocate two fire sprinkler heads due to new wall contruction. Inch Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 21, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2013-06016 | |||||
SCORE 95 Fa - relocate 2 strobes Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 21, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2013-06697 | |||||
SCORE 95 Fire sprinkler system - lobby area Client: Vail Broadway Partnership Llp | Permit type: Fire | Permit status: Cmp | Completion date: March 9, 2001 | Current use: Office - professional, existing | Permit id: Pmt2001-00674 | |||||
SCORE 95 Temporary tent 6 7 01 - 6 10 01 Client: Broadway Vail | Permit type: Temporary event | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2001-02341 | |||||
SCORE 89 Create room for atm machine Client: Broadway Vail | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 19, 2002 | Current use: Office - administrative, remodel | Permit id: Pmt2001-03972 | |||||
SCORE 100 Install new gas meter and associated gas piping. Client: Broadway Vail | Permit type: Mechanical | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2001-05507 | |||||
SCORE 95 Occupy sidewalk to install wall signs, associated with pmt2014-02368 & pmt2014-02370 Date: July 7, 2014 Contractor: Broomfield Sign Co, Inc Client: Lizard Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2014-02912 | |||||
SCORE 95 Suite 2 -- tenant remodel of 6848 sf to create professional offices. Client: Scott Kiere | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 1, 2013 | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-04567 | |||||
SCORE 95 Temporary closure of sidewalk along canyon for truck access to remove & stock construction material Date: October 3, 2012 Contractor: Wyatt Construction Co, Inc Client: Lizard Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-04771 | |||||
SCORE 95 Installation of internally illuminated sign inchjaipur indian restaurantinch on existing awning for suite 160. No revocable required. Client: Lizard Vail | Permit type: Sign | Permit status: Iss | Current use: Restaurant, existing | Permit id: Pmt2012-05867 | |||||
SCORE 100 Suite 105 -- remodel of 272 sf to create three offices in an existing office area; modify sink countertops in breakroom area to improve accessibility. Includes associated minor electrical, mechanical and plumbing . No net increase in number of plumbing fixtures. Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 6, 2013 | Current use: Office - professional, tenant remodel | Permit id: Pmt2012-06097 | |||||
SCORE 95 Fire alarm system - 2nd floor (ww reynolds) Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 24, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-00648 | |||||
SCORE 95 Network appliance ste 100 Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-02901 | |||||
SCORE 95 One boulder fitness-fire alarm Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: February 3, 2006 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2005-04494 | |||||
SCORE 95 New sidewalk, curb and gutter Date: April 13, 2004 Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2004-01335 | |||||
Interior tenant finish to install "labsinthe" restaurant (3,093 s. F.) in suite 150. Occupant load 117. Date: October 8, 2004 Value: $200 Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Current use: Restaurant, tenant finish | Permit id: Pmt2004-03540 | |||||
SCORE 95 Fire alarm system - owners improvement Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: October 4, 2004 | Current use: Commercial/retail, existing | Permit id: Pmt2004-03682 | |||||
City of boulder project - barb kenyon; project manager 2" water & 6" sewer taps Client: Lizard Vail | Permit type: Water, wastewater | Permit status: Act | Permit id: Pmt2003-00966 | |||||
1 1 2" water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Client: Broadway Vail | Permit type: Water | Permit status: Act | Permit id: Pmt2003-03413 | |||||
2" water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Client: Broadway Vail | Permit type: Water | Permit status: Act | Permit id: Pmt2003-03414 | |||||
SCORE 95 Sidewalk closure Date: September 26, 2003 Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-04159 | |||||
SCORE 95 Construction trailer Date: September 26, 2003 Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2003-04160 | |||||
Tenant remodel of suite 1 including relocation of interior partition walls, new bathroom and associated electrical and mechanical work. Date: April 10, 2008 Value: $43 Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 30, 2008 | Current use: Office - professional, tenant remodel | Permit id: Pmt2008-00916 | |||||
SCORE 95 Construct new parking lot and entry drive cut with sidewalk chase. Date: March 27, 2002 Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2002-01007 | |||||
SCORE 95 Install new sewer Date: May 10, 2002 Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2002-01833 | |||||
SCORE 95 Wastewater Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit status: Act | Permit id: Pmt2002-01922 | |||||
SCORE 95 Placing hand holes and boring pipe across broadway city project john campanola Date: May 28, 2002 Contractor: Mastec North America, Inc Client: Broadway Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2002-02171 | |||||
6" fireline tap (all fees for this permit are associated with pmt2002-03786) Client: Broadway Vail | Permit status: Act | Current use: Commercial/retail, core and shell | Permit id: Pmt2002-04781 | |||||
SCORE 95 Scope of work letter relocation of 9 sprinkler heads Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-03330 | |||||
Tenant remodel of suite 1 to create additional office area (4,388 sf ) for morgan stanley smith barney. Date: August 31, 2011 Value: $50,000 Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: October 11, 2011 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2011-03411 | |||||
SCORE 99 Interior non-structural demolition associated with pmt2011-03411 Date: August 29, 2011 Contractor: Boots Construction, Inc Client: Lizard Vail | Permit type: Demolition | Permit status: Cmp | Completion date: October 11, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-03687 | |||||
SCORE 100 Tennant finish sprinkler for morgan stanley Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Financial institution, existing | Permit id: Pmt2011-03780 | |||||
SCORE 95 Tennant finish fire alarm for morgan stanley Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: November 21, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-03920 | |||||
SCORE 95 Tenant remodel for inchone boulder plazainch. Total of 7,133sf. Scope includeswork in: lower level corridor from parking area to elevator lobbies ; second level corridor, lobbies and restrooms ; third level corridor, lobby, and restrooms. Meps included. No change in square footage or building coverage Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 4, 2015 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2015-00043 | |||||
SCORE 95 Fs - es - 2nd and 3rd floor elevetor lobby tf. This scope of work is eligible for a sowl Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: August 13, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-01002 | |||||
SCORE 95 18 broadway & 1801 13th st. Interior repair remodel only of the main level corridor and main level restrooms (5,066 sq. Ft. Total). Scope of work includes associated meps, to include plumbing fixture replacement. Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: December 11, 2015 | Current use: Office - professional, remodel | Permit id: Pmt2015-01460 | |||||
SCORE 100 Fs - es - tf for office space Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-02956 | |||||
SCORE 95 Fs - sowl - relocate 8 spks and relocate 3 Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: November 20, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-03001 | |||||
SCORE 95 Fa - es - add two h s. Add three strobes for halland hart Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: September 17, 2015 | Current use: Office - administrative, existing | Permit id: Pmt2015-03417 | |||||
SCORE 95 Fs - es - tf for 1st floor transient spaces (new wood ceiling tiles) Client: Lizard Vail | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2015-03615 | |||||
Access two manholes for splicing, one at broadway & walnut, the other at canyon east of broadway #n010046 aqcb Date: October 22, 2015 Client: Lizard Vail | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-04657 | |||||
SCORE 95 Add staircase to one boulder plaza. Client: Broadway Vail | Permit type: Building | Permit status: N&v | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2006-01633 | |||||
Add three awning at one boulder plaza Date: October 10, 2006 Value: $11 Client: Broadway Vail | Permit type: Building, awning | Permit status: Cmp | Completion date: June 11, 2008 | Current use: Commercial/retail, remodel | Permit id: Pmt2006-03451 | |||||
SCORE 76 Install 2 new controllers - wire new traveling cable - new fixtures, handrails and cab refurnish on two four stop passenger elevators. Client: Commons Vail | Permit type: Elevator | Permit status: Cls | Current use: Commercial/retail, existing | Permit id: Pmt2000-00282 | |||||
SCORE 95 Relocate south elevator disconnect Client: Commons Vail | Permit type: Electrical | Permit status: Cmp | Completion date: May 20, 2000 | Current use: Office - administrative, existing | Permit id: Pmt2000-00760 | |||||
SCORE 95 Tenant finish remodel Client: Vail Commons Partnership Llp | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-00820 | |||||
SCORE 98 Install 2 backflow cross-connection valves for domestic water system Client: Vail Broadway Parntership Llp | Permit type: Plumbing | Permit status: Cmp | Completion date: October 22, 2000 | Current use: Office - administrative, existing | Permit id: Pmt2000-00967 | |||||
SCORE 95 Installation of a fire sprinkler system. Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: May 22, 2000 | Current use: Commercial/retail, existing | Permit id: Pmt2000-01066 | |||||
SCORE 95 Electrical wiring for basement tenant areas. Client: Broadway Vail | Permit type: Electrical | Permit status: Cmp | Completion date: May 24, 2000 | Current use: Office - administrative, existing | Permit id: Pmt2000-01271 | |||||
SCORE 89 Tenant remodel - includes building and electrical Client: Broadway Vail | Permit type: Building, elevator | Permit status: Cmp | Completion date: December 6, 2000 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-01835 | |||||
SCORE 95 Tenant remodel. Includes demo of one wall, removal of a door, electric (new light fixtures), mechanical (diffusers only), and plumbing work. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Office - administrative, tenant remodel | Permit id: Pmt2000-02072 | |||||
SCORE 87 New split system cooling for phone room Client: Vail Broadway Partnership Llp | Permit type: Mechanical | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2000-02111 | |||||
SCORE 89 Addition for new entry, bathroom remodel Client: Vail Broadway Partnership Llp | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 18, 2001 | Current use: Office - administrative, addition and re | Permit id: Pmt2000-04897 | |||||
SCORE 95 Core and shell addition to one boulder plaza. Value: $622,000 Contractor: Rincon Development Inc Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Financial institution, addition | Permit id: Pmt2001-03497 | |||||
SCORE 95 Construct new temporary parking lot on lot on north side of lot. See adr 2002-000 for admin review. Client: Broadway Vail | Permit type: Electrical, sitework | Permit status: Cmp | Completion date: April 30, 2002 | Current use: Financial institution, existing | Permit id: Pmt2002-00949 | |||||
SCORE 89 Electrical permit to relocate lateral piping. Client: Lizard Vail | Permit type: Electrical | Permit status: Cmp | Completion date: May 10, 2002 | Current use: Commercial/retail, existing | Permit id: Pmt2002-01655 | |||||
SCORE 95 Wastewater Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit status: Act | Permit id: Pmt2002-01922 | |||||
SCORE 95 Man hole tap Contractor: Wyatt Construction Co, Inc Client: Broadway Vail | Permit type: Wastewater | Permit status: Act | Permit id: Pmt2002-01991 | |||||
SCORE 95 Above grade core and shell, addition and remodel for a mixed use office retail building. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Commercial/retail, core and shell | Permit id: Pmt2002-03786 | |||||
6inch fireline tap (all fees for this permit are associated with pmt2002-03786) Client: Broadway Vail | Permit type: Water | Permit status: Act | Current use: Commercial/retail, core and shell | Permit id: Pmt2002-04781 | |||||
City of boulder project - barb kenyon; project manager 2inch water & 6inch sewer taps Client: Lizard Vail | Permit type: Water, wastewater | Permit status: Act | Permit id: Pmt2003-00966 | |||||
SCORE 95 1inch meter installation for irrigation Contractor: Wyatt Construction Co, Inc Client: Lizard Vail | Permit type: Water | Permit status: Act | Permit id: Pmt2003-01118 | |||||
SCORE 57 Replace 2 freestanding signs and add one wall sign for bank one. Client: Vail Broadway Partnership Llp | Permit type: Electrical, sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2003-02615 | |||||
1 1 2inch water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Client: Broadway Vail | Permit type: Water | Permit status: Act | Permit id: Pmt2003-03413 | |||||
2inch water tap - city of boulder project; barb kenyon, project manager Date: August 13, 2003 Client: Broadway Vail | Permit type: Water | Permit status: Act | Permit id: Pmt2003-03414 | |||||
SCORE 95 Installation of ductwork for potential future hoods in restaurants not yet built. Ducts will be installed in rated shafts which will be built under the core and shell permit. Mechanical only this permit. Client: Lizard Vail | Permit type: Mechanical, flood not required | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Commercial/retail, existing | Permit id: Pmt2003-04195 | |||||
SCORE 95 Fire alarm system - core & shell Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: April 26, 2004 | Current use: Commercial/retail, existing | Permit id: Pmt2003-05056 | |||||
SCORE 95 Fire sprinkler system - core & shell Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: April 30, 2004 | Current use: Commercial/retail, existing | Permit id: Pmt2003-05277 | |||||
SCORE 95 Tenant finish for a new law office at the north end of the second floor. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2004-00002 | |||||
SCORE 95 New four stop, 35 pound hydraulic passenger elevator. Sprinkler yes, thyssenkrupp er8909 Client: Broadway Vail | Permit type: Elevator | Permit status: Cmp | Completion date: April 14, 2004 | Current use: Commercial/retail, existing | Permit id: Pmt2004-00247 | |||||
SCORE 95 Fire alarm system - suite 200 Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: April 26, 2004 | Current use: Office - professional, existing | Permit id: Pmt2004-00509 | |||||
SCORE 95 Basement remodel to add hall and storage units. Client: Broadway Vail | Permit type: Building, electrical | Permit status: N&v | Current use: Office - administrative, tenant remodel | Permit id: Pmt2004-00716 | |||||
SCORE 95 Fire sprinkler system - caplan & earnest Client: Broadway Vail | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2004-01208 | |||||
SCORE 95 Tenant finish (first floor, ne corner) to install a new restaurant called inchbombay bistro. Inch plumbing by separate permit. Client: Broadway Vail | Permit type: Building, electrical, mechanical | Permit status: Co | Current use: Restaurant, tenant finish | Permit id: Pmt2004-02659 | |||||
SCORE 95 Plumbing permit for a new restaurant (inchbombay bistroinch) at the ne corner of the first floor. See pmt2004-02659 for general permit for tenant finish. Client: Broadway Vail | Permit type: Plumbing | Permit status: Cmp | Completion date: October 27, 2004 | Current use: Restaurant, existing | Permit id: Pmt2004-02660 | |||||
SCORE 95 Fire sprinkler system - bombay bistro Value: $1,500 Contractor: Fire Defense, Inc Client: Broadway Vail | Permit type: Fire | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2004-03331 | |||||
SCORE 95 Interior tenant remodel to add interior non-bearing partition walls in suite #100. Client: Broadway Vail | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Office - professional, tenant remodel | Permit id: Pmt2004-03343 | |||||
SCORE 95 Fire alarm system - lfootabsinthe Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: May 30, 2008 | Current use: Restaurant, existing | Permit id: Pmt2004-03513 | |||||
Interior tenant finish to install inchlfootabsintheinch restaurant (3,093 s. F.) in suite 150. Occupant load 117. Date: October 8, 2004 Value: $200,000 Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Current use: Restaurant, tenant finish | Permit id: Pmt2004-03540 | |||||
SCORE 95 Fire alarm system - bombay bistro Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: November 1, 2004 | Current use: Restaurant, existing | Permit id: Pmt2004-03545 | |||||
SCORE 95 Interior tenant finish to install a new professional office (holland & hart) on the entire third floor of the building (20,056 s. F.). Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 21, 2004 | Current use: Office - professional, tenant remodel | Permit id: Pmt2004-03567 | |||||
SCORE 95 Fire alarm system - holland and hart Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: February 1, 2005 | Current use: Office - professional, existing | Permit id: Pmt2004-03735 | |||||
SCORE 91 Fire suppression system - bombay bistro Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: May 30, 2008 | Current use: Restaurant, existing | Permit id: Pmt2004-03983 | |||||
SCORE 95 Fire sprinkler system - 3rd floor, holland and hart Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: December 1, 2004 | Current use: Office - professional, existing | Permit id: Pmt2004-04272 | |||||
SCORE 95 Fire sprinkler system - lfootabsinthe Client: Broadway Vail | Permit type: Fire | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2004-04273 | |||||
SCORE 95 Fire suppression system - lfootabsinthe Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: March 10, 2005 | Current use: Restaurant, existing | Permit id: Pmt2004-04579 | |||||
SCORE 95 Tenant finish for office space. Space #204 5875sf Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2005-00304 | |||||
SCORE 95 Fire sprinkler system - 2nd floor Client: Broadway Vail | Permit type: Fire | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2005-00408 | |||||
SCORE 95 Tenant remodel to install demising wall and relocate plumbing fixtures in suite 110. Client: Broadway Vail | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: August 19, 2005 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2005-00551 | |||||
SCORE 95 Tenant remodel of suite #1 for computer software firm to install conference room, storage closet and install sink. Permit includes associated electrical, mechanical and plumbing. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 29, 2005 | Current use: Office - professional, tenant remodel | Permit id: Pmt2005-02220 | |||||
SCORE 95 Network appliance Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: September 6, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-02706 | |||||
SCORE 95 Tenant finish for body ballance fitness center in unit #107. Value: $600,000 Contractor: Wyatt Construction Company Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Amusement/recreational - indoor, tenant | Permit id: Pmt2005-02716 | |||||
SCORE 82 Remove signs from 4 existing canopies, replace signage on 2 only. Signs will read inchh&r block, financial advisorsinch. No changing to existing lighting. See also pmt 2005-03084 for three other signs this property. Client: Broadway Vail | Permit type: Sign | Permit status: Cmp | Completion date: March 3, 2008 | Current use: Office - professional, existing | Permit id: Pmt2005-03083 | |||||
SCORE 82 One new externally illuminated wall sign, and two new suspended signs, all illuminated by existing external lighting, and which read inchh&r block financial advisorsinch see also pmt 2005-03083 for two other signs this same address. Client: Broadway Vail | Permit type: Sign | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Office - professional, existing | Permit id: Pmt2005-03084 | |||||
SCORE 95 Vicfoots coffee shop- add and relocate for sprinkler heads Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: December 28, 2005 | Current use: Restaurant, existing | Permit id: Pmt2005-04044 | |||||
SCORE 95 Underground plumbing for health club. Client: Broadway Vail | Permit type: Plumbing | Permit status: Cmp | Completion date: February 29, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2005-04069 | |||||
SCORE 95 Vicfoots coffee shop fire alarm tenant finish Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: December 6, 2005 | Current use: Restaurant, existing | Permit id: Pmt2005-04130 | |||||
SCORE 95 Relocation and some additions of one boulder fitness Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: February 3, 2006 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2005-04458 | |||||
SCORE 100 Erect 3 permanent wall signs. Illuminated internally. Inchone boulder plazainch and inch18 broadwayinch Client: Broadway Vail | Permit type: Sign | Permit status: Cmp | Completion date: May 5, 2006 | Current use: Commercial/retail, existing | Permit id: Pmt2005-04558 | |||||
SCORE 95 Remodel of existing tenent space move two partition walls and add door to space. Add outlets;change heat runs and return air Client: Broadway Vail | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: March 13, 2008 | Current use: Office - professional, remodel | Permit id: Pmt2005-04624 | |||||
SCORE 95 Installation of 2 new externally illuminated suspended signs (to show different tenants on each face) and one new internally illuminated wall sign, inchone boulder fitnessinch Client: Lizard Vail | Permit type: Sign | Permit status: N&v | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2006-00506 | |||||
SCORE 95 Sign permit for non-illuminated awning signs inchvicfoots coffeeinch Client: Lizard Vail | Permit type: Sign | Permit status: Cmp | Completion date: April 21, 2008 | Current use: Restaurant, existing | Permit id: Pmt2006-02491 | |||||
Add three awning at one boulder plaza Date: October 10, 2006 Value: $11,000 Client: Broadway Vail | Permit type: Building, awning | Permit status: Cmp | Completion date: June 11, 2008 | Current use: Commercial/retail, remodel | Permit id: Pmt2006-03451 | |||||
SCORE 91 Add lettering inchlfoot absintheinch to awnings. See pmt2006-0345 for awning permit Client: Broadway Vail | Permit type: Sign | Permit status: Cls | Current use: Restaurant, existing | Permit id: Pmt2006-04544 | |||||
SCORE 95 Tenant remodel to revise corner office space in suite 210. Client: Broadway Vail | Permit type: Building | Permit status: N&v | Current use: Office - professional, tenant remodel | Permit id: Pmt2007-00009 | |||||
SCORE 91 Sign permit to add graphics to awning. Inchbombay bistro modern indian cuisineinch Client: Broadway Vail | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2008 | Current use: Restaurant, existing | Permit id: Pmt2007-02467 | |||||
Tenant remodel of suite 1 including relocation of interior partition walls, new bathroom and associated electrical and mechanical work. Date: April 10, 2008 Value: $43,000 Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 30, 2008 | Current use: Office - professional, tenant remodel | Permit id: Pmt2008-00916 | |||||
SCORE 95 Tenant remodel of space 105 Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - professional, tenant finish | Permit id: Pmt2008-01324 | |||||
SCORE 100 Tennant finsh sprinkler suite 140 Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-01718 | |||||
SCORE 100 Tennant finish sprinkler suite 105 morgan stanley Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-01743 | |||||
SCORE 95 Tennant finish fire alarm Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-01837 | |||||
SCORE 95 Tennant finish fire alarm suite 140 Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Office - professional, existing | Permit id: Pmt2008-02158 | |||||
SCORE 95 Two proposed awning signs mounted to existing awnings. Inchmorgan stanleyinch Client: Broadway Vail | Permit type: Sign | Permit status: N&v | Current use: Financial institution, existing | Permit id: Pmt2008-02409 | |||||
SCORE 95 Temporary sign for "h&r block, financial advisors" Date: June 17, 2005 Contractor: Royal Signs Inc Client: Broadway Vail | Applicant: Royal Signs, Inc. | Permit type: Temporary event | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Financial insti | |||||
SCORE 100 H & r block Date: June 3, 2005 Contractor: Core Electric Inc Client: Broadway Vail | Applicant: Core Electric, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - profes | |||||
SCORE 100 Fire sprinkler system - suite 110 Date: March 31, 2005 Contractor: Fire Defense Inc Client: Broadway Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: N&v | Current use: Office - admini | |||||
SCORE 95 3,855 square foot tenant finish for the offices of h & r block in suite 110. Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - profes | |||||
SCORE 100 1 amp sub panel for w d hookup Date: January 12, 2007 Contractor: Design Mechanical Inc Client: Broadway Vail | Applicant: Design Mechanical Inc | Permit type: Electrical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 98 Reconfiguration of interior partition walls to modify office layout -- no plumbing involved, minor mechanical & electrical. Client: Broadway Vail | Applicant: Alex Cassidy | Permit type: Building, electrical | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 Replacement awning signs for inchthe rib houseinch. One on east side of building and one on north side of building (same for both). Requires revocable permit. Date: March 9, 2009 Contractor: Supersign Inc Client: Lizard Vail | Applicant: Supersign* Inc | Permit type: Sign | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 95 Relocation of existing power (outlets, etc.) for restaurant and power for a new sign. Date: March 20, 2009 Contractor: Betterway Electric Inc Client: Lizard Vail | Applicant: Better-Way Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: April 2, 2009 | Current use: Restaurant, exi | |||||
SCORE 80 Reconfiguration of entry for one boulder fitness and creation of new suite #1 with demising wall. Scope of permit includes associated electrical. Client: Lizard Vail | Applicant: Ricon Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 1, 2011 | Current use: Amusement/recre | |||||
SCORE 94 Mechanical permit - for relocation into basement of existing water heater at one boulder fitness. Date: July 18, 2011 Contractor: Mechanical Masters Inc Client: Lizard Vail | Applicant: Mechanical Masters, Inc | Permit type: Mechanical | Permit status: Iss | Current use: Amusement/recre | |||||
SCORE 100 Scope of work letter for suite 1 relocation of two sprinkler heads and the addition of two sprinkler heads Date: August 8, 2011 Contractor: Fire Defense Inc Client: Lizard Vail | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - profes | |||||
SCORE 95 Interior, non-structural remodel of existing tenant space. Scope of work includes demo of closet walls, construction of a new phone room, and new brake room. Also included is drinking fountain demo and install of new sink and case work. Client: Lizard Vail | Applicant: Burke Builders, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Office - admini | |||||
SCORE 93 Tenant remodel of suite 1 for webscale networks. Scope of work includes removal and installation of non-bearing walls, remodel of break room, associated trim and fixtures, electrical, mechanical and plubming work. No new lighting or plumbing fixtures. Client: Lizard Vail | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: May 26, 2016 | Current use: Office - professional, tenant remodel | Permit id: Pmt2016-00828 | |||||
SCORE 89 Es - fa - suite 1 webscale Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: June 15, 2016 | Current use: Office - professional, existing | Permit id: Pmt2016-02069 | |||||
SCORE 95 Relocation of existing power (outlets, etc.) for restaurant and power for a new sign. Client: Lizard Vail | Permit type: Electrical | Permit status: Cmp | Completion date: April 2, 2009 | Current use: Restaurant, existing | Permit id: Pmt2009-00935 | |||||
SCORE 99 Interior, non-structural remodel of existing tenant space. Scope of work includes demo of closet walls, construction of a new phone room, and new brake room. Also included is drinking fountain demo and install of new sink and case work. Client: Lizard Vail | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Office - administrative, remodel | Permit id: Pmt2013-00848 | |||||
SCORE 80 Reconfiguration of entry for one boulder fitness and creation of new suite #1 with demising wall. Scope of permit includes associated electrical. Client: Lizard Vail | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 1, 2011 | Current use: Amusement/recreational - indoor, tenant | Permit id: Pmt2011-02538 | |||||
SCORE 94 Mechanical permit - for relocation into basement of existing water heater at one boulder fitness. Client: Lizard Vail | Permit type: Mechanical | Permit status: Iss | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2011-03008 | |||||
SCORE 95 Scope of work letter for suite 1 relocation of two sprinkler heads and the addition of two sprinkler heads Client: Lizard Vail | Permit type: Fire | Permit status: Cmp | Completion date: August 25, 2011 | Current use: Office - professional, existing | Permit id: Pmt2011-03329 | |||||
SCORE 95 3,855 square foot tenant finish for the offices of h & r block in suite 110. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - professional, tenant finish | Permit id: Pmt2005-00866 | |||||
SCORE 95 Fire sprinkler system - suite 110 Client: Broadway Vail | Permit type: Fire | Permit status: N&v | Current use: Office - administrative, existing | Permit id: Pmt2005-01103 | |||||
SCORE 95 H & r block Client: Broadway Vail | Permit type: Fire | Permit status: Cmp | Completion date: August 1, 2005 | Current use: Office - professional, existing | Permit id: Pmt2005-02050 | |||||
SCORE 82 Temporary sign for inchh&r block, financial advisorsinch Date: June 17, 2005 Contractor: Royal Signs, Inc Client: Broadway Vail | Permit type: Temporary event | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Financial institution | Permit id: Pmt2005-02367 | |||||
SCORE 100 1 amp sub panel for w d hookup Client: Broadway Vail | Permit type: Electrical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2007-00144 | |||||
SCORE 95 Reconfiguration of interior partition walls to modify office layout -- no plumbing involved, minor mechanical & electrical. Client: Broadway Vail | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Office - professional, tenant remodel | Permit id: Pmt2008-02978 | |||||
SCORE 95 Replacement awning signs for inchthe rib houseinch. One on east side of building and one on north side of building (same for both). Requires revocable permit. Value: $3,000 Contractor: Supersign Inc Client: Lizard Vail | Permit type: Sign | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2009-00763 | |||||
SCORE 95 Two awning signs and 1 externally illuminated wall sign "labsinthe restaurant". Date: October 13, 2005 Contractor: Rainbow Signs Inc Client: Broadway Vail | Applicant: Rainbow Signs Inc | Permit type: Sign | Permit status: N&v | Current use: Restaurant, exi | |||||
SCORE 85 New railing along broadway and walnut for labsinthe restaurant. Each area is 35 x 7 . Client: Broadway Vail | Applicant: Broadway Vail | Permit type: Building, fence | Permit status: N&v | Current use: Restaurant, exi | |||||
New railing along broadway and walnut for labsinthe restaurant. Each area is 35 x 7 . Value: $2 Client: Broadway Vail | Permit type: Building, fence | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2005-01096 | |||||
New railing along broadway and walnut for lfootabsinthe restaurant. Each area is 35foot x 7foot . Value: $2,500 Client: Broadway Vail | Permit type: Building, fence | Permit status: N&v | Current use: Restaurant, remodel | Permit id: Pmt2005-01096 | |||||
SCORE 95 Two awning signs and 1 externally illuminated wall sign inchlfootabsinthe restaurantinch. Value: $2,400 Contractor: Rainbow Signs Inc Client: Broadway Vail | Permit type: Sign | Permit status: N&v | Current use: Restaurant, existing | Permit id: Pmt2005-03981 | |||||
SCORE 93 12,0 square foot tenant finish for a health club - one boulder fitness. Client: Broadway Vail | Applicant: Layne Mitchell | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Amusement/recre | |||||
SCORE 100 Plumbing permit to add washer boxes and drain line to sewage pump. One boulder fitness. Date: January 11, 2007 Contractor: Design Mechanical Inc Client: Broadway Vail | Applicant: Design Mechanical Inc | Permit type: Plumbing | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 71 12,0 square foot tenant finish for a health club - one boulder fitness. Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Amusement/recreational - indoor, tenant | Permit id: Pmt2005-03808 | |||||
SCORE 100 Plumbing permit to add washer boxes and drain line to sewage pump. One boulder fitness. Client: Broadway Vail | Permit type: Plumbing | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2007-00124 | |||||
SCORE 95 2,9 square foot tenant finish for vics coffee shop. Occupant load Client: Broadway Vail | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Restaurant, ten | |||||
SCORE 95 2,9 square foot tenant finish for vicfoots coffee shop. Occupant load Client: Broadway Vail | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 24, 2006 | Current use: Restaurant, tenant finish | Permit id: Pmt2005-03886 | |||||
SCORE 95 Installation of new exterior door in storefront glazing on northern facade of corner unit #130 Client: Lizard Vail | Applicant: Rincon Development, Inc. | Permit type: Building | Permit status: N&v | Current use: Restaurant, rem | |||||
SCORE 95 Installation of new exterior door in storefront glazing on northern facade of corner unit #130 Client: Lizard Vail | Permit type: Building | Permit status: N&v | Current use: Restaurant, remodel | Permit id: Pmt2007-05521 | |||||
SCORE 93 Caplan and earnest llc-install two new non-illuminated wall signs. One sign facing on walnut and one sign facing broadway. Date: June 5, 2014 Contractor: Broomfield Sign Co Inc Client: Lizard Vail | Applicant: Broomfield Sign Co, Inc | Permit type: Sign | Permit status: Cmp | Completion date: March 13, 2015 | Current use: Office - profes | |||||
SCORE 95 Caplan and earnest llc-install two new non-illuminated wall signs. One sign facing on walnut and one sign facing broadway. Client: Lizard Vail | Permit type: Sign | Permit status: Cmp | Completion date: March 13, 2015 | Current use: Office - professional | Permit id: Pmt2014-02368 | |||||
SCORE 93 Holland and hart-install three new non-illuminated wall signs. One sign to be facing walnut, one sign facing canyon, and one sign facing broadway. Date: June 5, 2014 Contractor: Broomfield Sign Co Inc Client: Lizard Vail | Applicant: Broomfield Sign Co, Inc | Permit type: Sign | Permit status: Cmp | Completion date: March 13, 2015 | Current use: Office - profes | |||||
SCORE 95 Holland and hart-install three new non-illuminated wall signs. One sign to be facing walnut, one sign facing canyon, and one sign facing broadway. Client: Lizard Vail | Permit type: Sign | Permit status: Cmp | Completion date: March 13, 2015 | Current use: Office - professional, existing | Permit id: Pmt2014-02370 | |||||
SCORE 95 Tenant remodel for holland and hart. Scope to include associated mechanical and electrical. Client: Lizard Vail | Permit type: Building, electrical, mechanical, flood accessory/remodel | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2017-01428 |