Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: March 25, 2013 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit status: Completed | Permit id: 461131 | |||||
Demolition permit Date: November 29, 2010 Client: Willmoth Pamela A | Permit status: Completed | Permit id: 313493 | |||||
Plumbing permit Date: January 20, 2011 Client: Willmoth Pamela A | Permit status: Completed | Permit id: 320897 | |||||
Alteration permit Date: February 14, 2011 Client: Willmoth Pamela A | Permit status: Completed | Permit id: 317262 | |||||
Electrical permit Date: October 23, 2014 Client: Connell Jonathan | Permit status: Completed | Permit id: 569203 | |||||
Plumbing permit Date: February 18, 2015 Client: Connell Jonathan | Permit status: Completed | Permit id: 590924 | |||||
Electrical permit Date: February 11, 2015 Client: Connell Jonathan | Permit status: Completed | Permit id: 590001 | |||||
Alteration permit Date: November 24, 2014 Client: Connell Jonathan | Permit status: Completed | Permit id: 576143 | |||||
Plumbing permit Date: October 17, 2014 Client: Connell Jonathan | Permit status: Completed | Permit id: 568613 | |||||
Operations permit Date: March 11, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 20127 | |||||
Electrical permit Date: February 18, 2011 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 321332 | |||||
Electrical permit Date: December 31, 2008 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 195012 | |||||
Alteration permit Date: June 12, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 213519 | |||||
Electrical permit Date: April 3, 2014 Client Company: C/o Harbor Group Internat | Permit status: Expired | Permit id: 528159 | |||||
Suppression permit Date: July 21, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 216169 | |||||
Alteration permit Date: May 21, 2015 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 611898 | |||||
Suppression permit Date: December 16, 2015 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 658643 | |||||
Mechanical permit Date: August 24, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 224179 | |||||
Plumbing permit Date: January 27, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 516936 | |||||
Electrical permit Date: July 15, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 226716 | |||||
Sign permit Date: December 13, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 306775 | |||||
Electrical permit Date: April 28, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 275491 | |||||
Suppression permit Date: April 8, 2010 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 271505 | |||||
Electrical permit Date: May 21, 2010 Client: Congdon Charles B Congdon Julie S | Permit status: Expired | Permit id: 269771 | |||||
Plumbing permit Date: March 31, 2010 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 266852 | |||||
Alteration permit Date: March 5, 2010 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 262417 | |||||
Plumbing permit Date: August 13, 2008 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 170538 | |||||
Use permit Date: June 2, 2008 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 154820 | |||||
Alteration permit Date: June 2, 2008 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 150488 | |||||
Demolition permit Date: July 27, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 228767 | |||||
Use permit Date: November 17, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 248625 | |||||
Alteration permit Date: July 29, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 228587 | |||||
Suppression permit Date: September 1, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 234905 | |||||
Plumbing permit Date: September 10, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 236156 | |||||
Mechanical permit Date: November 20, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 249390 | |||||
Electrical permit Date: August 26, 2009 Client: Doggett Pamela Doggett Pamela C | Permit status: Completed | Permit id: 233768 | |||||
Electrical permit Date: April 8, 2013 Client: Gold Sidney L Gold Joan | Permit status: Completed | Permit id: 463810 | |||||
Electrical permit Date: September 17, 2008 Client: Andrew Susan B | Permit status: Completed | Permit id: 170390 | |||||
Alteration permit Date: June 30, 2008 Client: Andrew Susan B | Permit status: Completed | Permit id: 159828 | |||||
Plumbing permit Date: August 13, 2008 Client: Andrew Susan B | Permit status: Completed | Permit id: 170536 | |||||
Use permit Date: June 30, 2008 Client: Andrew Susan B | Permit status: Completed | Permit id: 159816 | |||||
Electrical permit Date: August 12, 2008 Client: Congdon Charles B Congdon Julie S | Permit status: Completed | Permit id: 166978 | |||||
Alteration permit Date: September 17, 2008 Client: Ghen Dina F | Permit status: Completed | Permit id: 174122 | |||||
Use permit Date: August 29, 2008 Client: Ghen Dina F | Permit status: Completed | Permit id: 174108 | |||||
Electrical permit Date: November 12, 2008 Client: Ghen Dina F | Permit status: Completed | Permit id: 184119 | |||||
Alteration permit Date: April 13, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 269093 | |||||
Alteration permit Date: November 18, 2015 Client Company: C/o Harbor Group Internat | Permit status: Active | Permit id: 649841 | |||||
Plumbing permit Date: January 28, 2016 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 659134 | |||||
Mechanical permit Date: May 4, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 276724 | |||||
Electrical permit Date: January 31, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 517832 | |||||
Alteration permit Date: March 4, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 517506 | |||||
Mechanical permit Date: January 13, 2016 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 661603 | |||||
Suppression permit Date: May 4, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 276854 | |||||
Electrical permit Date: July 7, 2009 Client Company: C/o Harbor Group Internat | Permit status: Expired | Permit id: 224846 | |||||
Electrical permit Date: April 15, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 273004 | |||||
Plumbing permit Date: July 21, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 227522 | |||||
Zoning/use permit Date: April 30, 2007 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit status: Completed | Permit id: 71144 | |||||
Sign permit Date: May 31, 2007 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit status: Completed | Permit id: 74550 | |||||
Electrical permit Date: January 26, 2016 Client: Residences At The Phoenix Condominium Association | Permit status: Expired | Permit id: 658705 | |||||
Zoning permit Date: July 10, 2015 Client: Residences At The Phoenix Condominium Association | Permit status: Completed | Permit id: 616392 | |||||
Suppression permit Date: August 29, 2008 Client: Andrew David F Andrew Susan B | Permit status: Completed | Permit id: 174168 | |||||
Electrical permit Date: February 18, 2011 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 321332 | |||||
Alteration permit Date: May 21, 2015 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 611898 | |||||
Alteration permit Date: June 12, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 213519 | |||||
Electrical permit Date: April 28, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 275491 | |||||
Operations permit Date: March 11, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 20127 | |||||
Sign permit Date: December 13, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 306775 | |||||
Plumbing permit Date: January 27, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 516936 | |||||
Suppression permit Date: December 16, 2015 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 658643 | |||||
Mechanical permit Date: August 24, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 224179 | |||||
Electrical permit Date: December 31, 2008 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 195012 | |||||
Electrical permit Date: April 3, 2014 Client Company: C/o Harbor Group Internat | Permit status: Expired | Permit id: 528159 | |||||
Electrical permit Date: July 15, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 226716 | |||||
Suppression permit Date: July 21, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 216169 | |||||
Electrical permit Date: January 31, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 517832 | |||||
Plumbing permit Date: January 28, 2016 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 659134 | |||||
Alteration permit Date: March 4, 2014 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 517506 | |||||
Plumbing permit Date: July 21, 2009 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 227522 | |||||
Alteration permit Date: April 13, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 269093 | |||||
Mechanical permit Date: May 4, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 276724 | |||||
Electrical permit Date: April 15, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 273004 | |||||
Electrical permit Date: July 7, 2009 Client Company: C/o Harbor Group Internat | Permit status: Expired | Permit id: 224846 | |||||
Mechanical permit Date: January 13, 2016 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 661603 | |||||
Suppression permit Date: May 4, 2010 Client Company: C/o Harbor Group Internat | Permit status: Completed | Permit id: 276854 | |||||
Alteration permit Date: November 18, 2015 Client Company: C/o Harbor Group Internat | Permit status: Active | Permit id: 649841 | |||||
Electrical permit Date: February 22, 2016 Client: Residences At The Phoenix Condominium Association | Permit status: Expired | Permit id: 671527 | |||||
Zoning permit Date: July 10, 2015 Client: Residences At The Phoenix Condominium Association | Permit status: Completed | Permit id: 616392 | |||||
SCORE 95 Level 2 alterations to the 3rd and 4th floors to reconfigure an existing office space as per plans. Separate permits required for m, e, p. Date: November 28, 2017 Contractor: Gilbane Building Company Permit type: Alteration permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 829544 | |||||
SCORE 99 Level ii interior alterations (no change of occupancy) to 3rd and 4th floor office areas to include removal of carpeting and floor tile, partial removal of non structural non load bearing gyp boards walls and removal of casework and shelving as per approved plans. Existing building fully sprinklered. Date: November 20, 2017 Contractor: Associated Specialty Contr Inc Permit type: Demolition permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 827006 | |||||
SCORE 100 Provide 6-telephone data cables,3-tv cables,1-microphone cable and 10-speakers. Disconnect and reinstall at completion for new wall and ceiling finishes 9-fa devices(4-speaker strobes,4-detectors and 1-fire phone jack) as per 2008 nec (cc district) Date: February 22, 2016 Contractor: Adams Electrical Const Inc Permit type: Electrical permit | Permit status: Expired | Completion date: February 22, 2016 | Permit id: 671527 | |||||
SCORE 100 Install light fixtures, controls and power devices as per 2008 nec (cc district) Date: January 26, 2016 Contractor: Adams Electrical Const Inc Permit type: Electrical permit | Permit status: Expired | Completion date: January 26, 2016 | Permit id: 658705 | |||||
Install protective fence around open ground gates Date: July 10, 2015 Permit type: Zoning permit | Permit status: Completed | Completion date: September 1, 2017 | Permit id: 616392 | |||||
SCORE 100 Relocate into new partion walls and flooring (26) recepts, (12) light fixtures extend wiring onto existing panels as per 2008 nec (cc district) Date: December 7, 2017 Contractor: Wm Aj Shaeffers Sons Inc Permit type: Electrical permit | Permit status: Active | Completion date: December 7, 2017 | Permit id: 837543 | |||||
SCORE 93 Relocat exisitng sprinkler heads for new renovations for the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Date: December 8, 2017 Contractor: Mk Fire Protection And Supply Permit type: Suppression permit | Permit status: Active | Completion date: December 8, 2017 | Permit id: 837958 | |||||
Zoning use permit Date: April 30, 2007 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit status: Completed | Permit id: 71144 | |||||
Sign permit Date: May 31, 2007 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit status: Completed | Permit id: 74550 | |||||
SCORE 77 Remodeling existing bathroom and expand area of bathroom within the dwelling unit. Level 1 alteration: shall comply with the provisions of chapter 6 of the international existing building code. To include the removal and replacement or the covering of existing materials, elements, equipment or fixtures using new materials, elements, equipment or fixtures that serve the same purpose. No work changes to exterior or windows doors as per historical commission. Date: November 24, 2014 Contractor: Marsh Construction And Remodelin Client: Connell Jonathan | Permit type: Alteration permit | Permit status: Completed | Completion date: April 14, 2015 | Permit id: 576143 | |||||
SCORE 96 Installing 3 horizontal heat pumps w ductwork & diffusers as per plans. Date: August 24, 2009 Contractor: J Rihl Inc Client Company: C/o Harbor Group Internat | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 25, 2009 | Permit id: 224179 | |||||
SCORE 78 Combine units 1107 and unit 1109 to make one unit - 1107 for a new total of 265 units in the same building with an acc. Leasing office, bank, offices as approved on foors 1 thru 3 and retail commercial as previously approved. Date: June 30, 2008 Contractor: Alex L Pronzato Inc Client: Andrew Susan B | Permit type: Use permit | Permit status: Completed | Completion date: June 30, 2008 | Permit id: 159816 | |||||
SCORE 95 Relocate sprinkler heads in unit 1109 Date: August 29, 2008 Contractor: S A Comunale Co Inc Client: Andrew David F Andrew Susan B | Permit type: Suppression permit | Permit status: Completed | Completion date: June 22, 2009 | Permit id: 174168 | |||||
SCORE 100 Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: May 21, 2015 Contractor: Aetna Roofing Corporation Client Company: C/o Harbor Group Internat | Permit type: Alteration permit | Permit status: Completed | Completion date: September 3, 2015 | Permit id: 611898 | |||||
SCORE 100 Install 12-recess lights, replace receptacles, & switches, install 6-new receptacle, & 2-branch ckts as per nec 2008 cc dist Date: October 23, 2014 Contractor: A.M. Electric Inc Client: Connell Jonathan | Permit type: Electrical permit | Permit status: Completed | Completion date: April 24, 2015 | Permit id: 569203 | |||||
SCORE 100 Replace waste and water line and set fixtures (condo unit)the installation will comply with the philadelphia plumbing code 2004 Date: February 18, 2015 Contractor: Norman Cole Sr, Client: Connell Jonathan | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 14, 2015 | Permit id: 590924 | |||||
SCORE 96 Add dedicated 20amp circuit in bathroom for water pump-the installation will comply with the philadelphia plumbing code 2004 Date: February 11, 2015 Contractor: Samuel Ehmann Electrical Serv Client: Connell Jonathan | Permit type: Electrical permit | Permit status: Completed | Completion date: April 24, 2015 | Permit id: 590001 | |||||
SCORE 100 Unit #1409 - replacement of a kitchen sink, (3)three lavatories, (2)two water closets, (1)one shower and (1)one washing machine standpipe Date: January 20, 2011 Contractor: Jesse Jones Client: Willmoth Pamela A | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 30, 2011 | Permit id: 320897 | |||||
SCORE 100 We will be relocating (23) sprinklers in the 2nd floor elevator lobby & restroom of vynamic. Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: December 16, 2015 Contractor: Oliver Sprinkler Co Inc Client Company: C/o Harbor Group Internat | Permit type: Suppression permit | Permit status: Completed | Completion date: March 1, 2016 | Permit id: 658643 | |||||
SCORE 100 Aka 1600-18 arch street - unit "1" - install (1)sink Date: January 27, 2014 Contractor: Dominic Garofolo Client Company: C/o Harbor Group Internat | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2014 | Permit id: 516936 | |||||
SCORE 100 Installation of (3) turnstiles, (33) electrical strikes, (23) bolt locks, (33) door contacts, (33) rex motions, (127) card readers, (63) request to exit motion and (33) bio card readers as per 2008 nec (cc dist) Date: February 18, 2011 Contractor: Mjk Electrical Corporation Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: June 29, 2011 | Permit id: 321332 | |||||
Interior renovations for the existing apartment as per plans. Date: February 14, 2011 Client: Willmoth Pamela A | Permit type: Alteration permit | Permit status: Completed | Completion date: June 30, 2011 | Permit id: 317262 | |||||
SCORE 99 Demolition and removal of non-load bearing partitions, tile, and drywall in a condominium unit. Date: November 29, 2010 Contractor: Grimaldi And Sons Contractors In Client: Willmoth Pamela A | Permit type: Demolition permit | Permit status: Completed | Completion date: June 24, 2011 | Permit id: 313493 | |||||
SCORE 91 Install light fixtures & devices, reuse relocate existing branch circuits & devices as per 2005 nec (cc district) Date: September 17, 2008 Contractor: Adams Electrical Construction Client: Andrew Susan B | Permit type: Electrical permit | Permit status: Completed | Completion date: January 28, 2009 | Permit id: 170390 | |||||
SCORE 78 Consolidate residential units 1107 and 1109 into 1 residence located on the 11th and 12th floors. Install nonbearing partitions, doors, new showers, tile bathroom, carpet and wood floors as per plans. Separate permits required for plumbing and electrical. Date: June 30, 2008 Contractor: Alex L Pronzato Inc Client: Andrew Susan B | Permit type: Alteration permit | Permit status: Completed | Completion date: November 5, 2008 | Permit id: 159828 | |||||
SCORE 91 Install two (2) exterior wall sconces at main entrance using existing lighting circuit, as per 2005 nec (cc dist) Date: December 31, 2008 Contractor: Adams Electrical Construction Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: June 21, 2010 | Permit id: 195012 | |||||
SCORE 100 3 12 10-erection of (1)-9x assembly use tent Date: March 11, 2010 Contractor: Select Event Rentals Client Company: C/o Harbor Group Internat | Permit type: Operations permit | Permit status: Completed | Permit id: 20127 | |||||
Fitout of ste 206 including new wall framing ceiling & flooring systems, Date: June 12, 2009 Client Company: C/o Harbor Group Internat | Permit type: Alteration permit | Permit status: Completed | Completion date: August 25, 2009 | Permit id: 213519 | |||||
SCORE 95 Relocate 17 sprinkler heads. Date: July 21, 2009 Contractor: S A Comunale Co Inc Client Company: C/o Harbor Group Internat | Permit type: Suppression permit | Permit status: Completed | Completion date: August 25, 2009 | Permit id: 216169 | |||||
SCORE 59 Install 13 cat5 voice data cables. Date: April 28, 2010 Contractor: Di Paolo Francis A Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 275491 | |||||
Installation of exterior signage. Date: December 13, 2010 Client Company: C/o Harbor Group Internat | Permit type: Sign permit | Permit status: Completed | Completion date: June 30, 2011 | Permit id: 306775 | |||||
SCORE 100 Kitchen,wired and install 4 hi hats,wired and installed 4 gfcis receptacles,wired and install 4 single pole switches 30amp circuit for oven,dishwasher circuit, ampcircuit for cook top as per 2008 nec Date: January 18, 2011 Contractor: Noce Michael F Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: July 26, 2012 | Permit id: 321118 | |||||
SCORE 100 Install 28 dual category 6 outlets plenum rated cabling, 8 plenum coax cables, 1 - 25 pair telephone back bone cable average runs 1 as per 2005 nec (cc district) Date: July 15, 2009 Contractor: New Line Communications Inc Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: January 12, 2011 | Permit id: 226716 | |||||
SCORE 100 Rough in double bowl lav,install shower drain and faucet,replace kitchen sink,faucet and toilet. The installation will comply with the philadelphia plumbing code 2004 Date: October 17, 2014 Contractor: Garry Dabney Client: Connell Jonathan | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 18, 2014 | Permit id: 568613 | |||||
SCORE 56 For level ii alterations to existing residential unit on the sixth floor level. Alterations to include the erection of non bearing parition walls, provide furnishings and finishes throughout. No work done to exterior wall. All work to be done per approved plans. Separate permits required for mechanical, electrical. Plumbing and fire supression work. Date: September 22, 2014 Contractor: Hagen Construction And Design Client: Connell Jonathan | Permit type: Alteration permit | Permit status: Completed | Completion date: December 19, 2014 | Permit id: 555102 | |||||
SCORE 89 Fixture replacement Date: August 13, 2008 Contractor: James Gory Client: Andrew Susan B | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 24, 2009 | Permit id: 170536 | |||||
SCORE 100 Replace damaged sidewalk light on 16th st. Side of building. Date: April 11, 2011 Contractor: Adams Electrical Const Inc Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2011 | Permit id: 334953 | |||||
SCORE 96 Installation of new partitions for bathroom, closet and master bedroom. New doors, trims, new kitchen lighting, bathroom, tile work and fixture as per plans. Date: July 29, 2009 Contractor: Builders Works Llc Client: Ggett Pamela Doggett Pamela C | Permit type: Alteration permit | Permit status: Completed | Completion date: November 25, 2009 | Permit id: 228587 | |||||
SCORE 96 Interior demolition of non load bearing assemblies. Date: July 27, 2009 Contractor: Builders Works Llc Client: Ggett Pamela Doggett Pamela C | Permit type: Demolition permit | Permit status: Completed | Completion date: August 18, 2009 | Permit id: 228767 | |||||
SCORE 100 Relocate (5) duplex receptacles, install (6) additional receptacles, (6)recessed lights in bathroom, (2)lights in closet and (2)wall sconces in bedroom...... In accordance with 2005 nec Date: August 26, 2009 Contractor: Radon Leszek Client: Ggett Pamela Doggett Pamela C | Permit type: Electrical permit | Permit status: Completed | Completion date: June 17, 2010 | Permit id: 233768 | |||||
SCORE 100 Tenant fit out consisting of 23 lay in fixtures, single pole switches, 36 duplex outlets, 3 air handlers, 1 - 277 480v panel, 1 - 30kva transformer, 1 - 120 208v panel, 1 electric meter (south district) 2 fire alarm strobes, relocate speaker strobe and 1 new speaker strobe Date: July 7, 2009 Contractor: Goldhorn Elect Construction Co Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Expired | Completion date: July 7, 2009 | Permit id: 224846 | |||||
SCORE 96 Installation of one sink Date: July 21, 2009 Contractor: J Rihl Inc Client Company: C/o Harbor Group Internat | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 4, 2009 | Permit id: 227522 | |||||
SCORE 99 Interior demolition of existing mechanical work. For the installation of new ductwork, registers diffusers, exhaust fan, and all other associated work. Separate permit required for any electrical, plumbing, and fire suppression work. Date: January 13, 2016 Contractor: Sda Mechanical Services Inc Client Company: C/o Harbor Group Internat | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 1, 2016 | Permit id: 661603 | |||||
For the erection of three flat wall signs Date: April 30, 2007 Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 30, 2007 | Permit id: 71144 | |||||
SCORE 95 Relocate 2 existing sprinkler heads Date: April 8, 2010 Contractor: S A Comunale Co Inc Client: Congdon Charles B Congdon Julie S | Permit type: Suppression permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 271505 | |||||
Combine units 1809 and 1813 on the 18th floor to create a single combo unit known as 1809 for a new total of 264 units int the same building. With and accelerated leasing office bank offices as approved and retail commercial space as previously approved Date: August 29, 2008 Client: Ghen Dina F | Permit type: Use permit | Permit status: Completed | Completion date: August 29, 2008 | Permit id: 174108 | |||||
Interior fit out. Eliminate kitchen and one powder room. Remove nonbearing walls. Combine units 1809 and 1813 on the 18th floor to create a single combo unit known as 1809 for a new total of 264 units int the same building. With and accelerated leasing office bank offices as approved and retail commercial space as previously approved Date: September 17, 2008 Client: Ghen Dina F | Permit type: Alteration permit | Permit status: Completed | Completion date: February 5, 2009 | Permit id: 174122 | |||||
SCORE 96 Combine two separate condos into one space. Date: November 17, 2009 Contractor: Builders Works Llc Client: Ggett Pamela Doggett Pamela C | Permit type: Use permit | Permit status: Completed | Completion date: November 17, 2009 | Permit id: 248625 | |||||
SCORE 99 Installation of ductwork as per zoning ap #248625 units are combined as one(1)duct work to include exhaust for kitchen, bathroom and dryer. Date: November 20, 2009 Contractor: Justin Desantis Client: Ggett Pamela Doggett Pamela C | Permit type: Mechanical permit | Permit status: Completed | Completion date: November 25, 2009 | Permit id: 249390 | |||||
SCORE 96 Relocate existing water closet, two lavs and bathtub. Reconnect kitchen sink and one laundry tub Date: September 10, 2009 Contractor: James Ackley Client: Ggett Pamela Doggett Pamela C | Permit type: Plumbing permit | Permit status: Completed | Completion date: November 25, 2009 | Permit id: 236156 | |||||
SCORE 62 Kitchen upgrades including removing two non bearing partitions,new floor covering, cabinets and counter tops. Date: March 5, 2010 Contractor: R J Murphy And Co Inc Client: Congdon Charles B Congdon Julie S | Permit type: Alteration permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 262417 | |||||
SCORE 98 Disconnect plumbing to kitchen, reconnect connect sink, dishwasher, ice maker Date: March 31, 2010 Contractor: William Henderson Client: Congdon Charles B Congdon Julie S | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 7, 2010 | Permit id: 266852 | |||||
SCORE 100 Disconnect kitchen appliances and reconnect new. Replace devices with new, replace kitchen light, replace (3) 6" recessed lights with 4" recessed lights. Relocate sub-panel to side wall.... In accordance with 2008 nec Date: May 21, 2010 Contractor: A T B Electric Inc Client: Congdon Charles B Congdon Julie S | Permit type: Electrical permit | Permit status: Expired | Completion date: May 21, 2010 | Permit id: 269771 | |||||
SCORE 89 Fishing all wires relocating 2 outlets and switch and two lights and adding 4 lights and one outlet in bedroom as per nec 2008 cc district Date: October 12, 2016 Contractor: J And J Electrical Contractors Client: Bentley Dennis A Bentley Loida | Permit type: Electrical permit | Permit status: Completed | Completion date: December 14, 2016 | Permit id: 728620 | |||||
SCORE 100 Re-roof the 21st floor elevator mechanical room roof - tear off the existing epdm roof system down to the structure concrete deck, install new tapered roof insulation - install a new modified build up roof system Date: March 25, 2013 Contractor: Aetna Roofing Corporation Client: Sas 16 Arch Street Lp | Client Company: Keating Partners Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: May 28, 2013 | Permit id: 461131 | |||||
SCORE 78 Relocate existing 120 208v single phase-3w panelboard fron one wall to another wall approx 10-0" away as per nec 2008 Date: April 8, 2013 Contractor: Vectordyne Inc Client: Gold Sidney L Gold Joan | Permit type: Electrical permit | Permit status: Completed | Completion date: October 1, 2013 | Permit id: 463810 | |||||
SCORE 96 Interior renovations, interior demo and upgrades to finishes, accessibiblity upgrades, rcp, furnishings for 1st 2nd floor lobby & atrium level spaces, accessible lift installation, space. No change in use-occupancy. No new commerical listed. Per phc : no exterior work, no changes to exterior. Additional permits: electrical, plumbing, hvac, sprinklers. Date: November 18, 2015 Contractor: Intech Construction Llc Client Company: C/o Harbor Group Internat | Permit type: Alteration permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 649841 | |||||
SCORE 99 Remove existing fixtures in bathrooms & replace with new. Install new kitchen w new drain & vent. Install new (2) water heaters & 1-h. W. Return the installation will comply with the philadelphia plumbing code 2004 . Date: January 28, 2016 Contractor: Sda Mechanical Services Inc Client Company: C/o Harbor Group Internat | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 1, 2016 | Permit id: 659134 | |||||
SCORE 100 Replace 8 existing lighting fixtures with new fixtures,relocate 2 existing lighting fixtures and relocate 2 counter devices per 2008 nec (mixed use) Date: January 31, 2014 Contractor: Arrow Electric Services Inc Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: May 13, 2014 | Permit id: 517832 | |||||
SCORE 95 Relocate (4) sprinkler heads in unit 1917 Date: September 1, 2009 Contractor: S A Comunale Co Inc Client: Ggett Pamela Doggett Pamela C | Permit type: Suppression permit | Permit status: Completed | Completion date: November 25, 2009 | Permit id: 234905 | |||||
SCORE 78 For interior alterations within an existing spce to cretate two (2) interior offices, 1 conference and reception area. All work shall comply with the approved plans. Date: April 13, 2010 Contractor: Alex L Pronzato Inc Client Company: C/o Harbor Group Internat | Permit type: Alteration permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 269093 | |||||
SCORE 59 Install 100a mcb 120 208 panel, light fixtures, receptacles, switches & a c unit. Date: April 15, 2010 Contractor: Di Paolo Francis A Client Company: C/o Harbor Group Internat | Permit type: Electrical permit | Permit status: Completed | Completion date: August 19, 2010 | Permit id: 273004 | |||||
SCORE 89 Installation 3ton heat pump to existing space. Date: May 4, 2010 Contractor: Home And Business Air Condition Client Company: C/o Harbor Group Internat | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 20, 2010 | Permit id: 276724 | |||||
SCORE 95 Relocate 13 existing sprinkler heads for new renovations Date: May 4, 2010 Contractor: S A Comunale Co Inc Client Company: C/o Harbor Group Internat | Permit type: Suppression permit | Permit status: Completed | Completion date: May 24, 2010 | Permit id: 276854 | |||||
SCORE 99 Interior renovations, upgrades to finishes for existing starbucks restaurant tenant space. No change in use-occupancy. Per phc : no exterior work, no changes to exterior. Additional permits: electrical, plumbing, hvac, sprinklers. Date: March 4, 2014 Contractor: Piece Management Inc Client Company: C/o Harbor Group Internat | Permit type: Alteration permit | Permit status: Completed | Completion date: July 24, 2014 | Permit id: 517506 | |||||
SCORE 91 Install light fixtures and devices, and re use relocate existing branch circuits as per 2005 nec (east district) Date: November 12, 2008 Contractor: Adams Electrical Construction Client: Ghen Dina F | Permit type: Electrical permit | Permit status: Completed | Completion date: January 16, 2009 | Permit id: 184119 | |||||
SCORE 91 Install light fixtures & switches as shown on plans. Reuse relocate existing branch circuits & receptacles. Date: August 12, 2008 Contractor: Adams Electrical Construction Client: Congdon Charles B Congdon Julie S | Permit type: Electrical permit | Permit status: Completed | Completion date: September 2, 2008 | Permit id: 166978 | |||||
SCORE 78 Interior alterations er plans combine two units [units #1815 and 1817] to create a single condo. Unit Date: June 2, 2008 Contractor: Alex L Pronzato Inc Client: Congdon Charles B Congdon Julie S | Permit type: Alteration permit | Permit status: Completed | Completion date: September 23, 2008 | Permit id: 150488 | |||||
SCORE 78 Combine unit # 1815 and unit # 1817 on 18th floor to create a single condo. Unit known as unit # 1815 Date: June 2, 2008 Contractor: Alex L Pronzato Inc Client: Congdon Charles B Congdon Julie S | Permit type: Use permit | Permit status: Completed | Completion date: June 2, 2008 | Permit id: 154820 |