Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 1 1 2" water tap - city of boulder project; barb kenyon, project manager Date: April 1, 2003 Contractor: Campus Client: Campus,Varsity Company Llp | Applicant: Campus | Permit type: Water | Permit status: Act | |||||
SCORE 95 Reroof on boulder townhomes office Date: November 21, 2002 Contractor: Black Roofing Inc Client: Campus,Varsity Company Llp | Applicant: Black Roofing Inc | Permit type: Roofing | Permit status: Cls | Current use: Office - admini | |||||
SCORE 88 Replace forced air furnaces in units #213, 228, 229, 231, 202, 203, 128, 101, 106, 125 (80,0 btu) Date: December 19, 2001 Contractor: K C A Companies Inc Client: Countryside Asset Mgmt. | Applicant: K C A Companies, Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Existing | |||||
SCORE 100 Recover existing roof over units #204 and #229 with durolast thermoplastic membrane, mechanically fastened. 39 squares to be installed. Date: August 16, 2001 Contractor: M B Roofing Inc Client: Campus,Varsity Company Llp | Applicant: M B Roofing, Inc. | Permit type: Roofing | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 88 Install forced air furnaces in units - 112, 118, 120, 124, 129, 130, 201, 211, 212, 222 ,223 ,220 Date: January 12, 2000 Contractor: K C A Companies Inc Applicant: K C A Companies, Inc. | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwe | |||||
SCORE 95 Tear-off & reroof of 1 squares on 5 buildings at 1555 broadway. Buildings are connected by breezeways & stairwells -- multiple roof surfaces, multiple elevations, installation of tapered foam, densedeck & epdm. Mid-roof inspection required. Date: April 8, 2009 Contractor: B And M Roofing Of Colorado Inc Client: Campus,Varsity Company Llp | Applicant: B & M Roofing Of Colorado Inc | Permit type: Roofing | Permit status: Cmp | Completion date: September 23, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 Replace damaged cable along s. Side of marine w. Of broadway, (~ 150foot) Date: January 3, 2011 Contractor: Comcast Client: Campus,Varsity Company Llp | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 91 Signs - erection of new non-electric wall sign for inchvarsity & campus townhousesinch. Date: December 24, 2014 Contractor: Silversprings Signs And Graphics Inc Client: Campus,Varsity Company Llp | Applicant: Silversprings Signs & Graphics Inc | Permit type: Sign | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 66 Building c - installation of 6. 51 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Date: June 24, 2015 Contractor: Ilg Electric Llc Client: Campus,Varsity Company Llp | Applicant: Ilg Electric Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Multifamily dwe | |||||
SCORE 66 Building e-d - installation of 4. 34 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Date: June 24, 2015 Contractor: Ilg Electric Llc Client: Campus,Varsity Company Llp | Applicant: Ilg Electric Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Multifamily dwe | |||||
SCORE 95 Building b-a - installation of 15. 5 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Date: June 30, 2015 Contractor: Custom Solar Llc Client: Campus,Varsity Company Llp | Applicant: Custom Solar Llc | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Multifamily dwe | |||||
SCORE 95 Repair broken joists in the floor ceiling separating unit 106 and 206. Reference cpl2016-00277. Client: Campus | Permit type: Building | Permit status: Cmp | Completion date: May 12, 2016 | Current use: Multifamily dwellings, repair | Permit id: Pmt2016-01797 | |||||
SCORE 95 Tear-off & reroof of 1 squares on 5 buildings at 1555 broadway. Buildings are connected by breezeways & stairwells -- multiple roof surfaces, multiple elevations, installation of tapered foam, densedeck & epdm. Mid-roof inspection required. Client: Campus | Permit type: Roofing | Permit status: Cmp | Completion date: September 23, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-01157 | |||||
SCORE 100 Recover existing roof over units #204 and #229 with durolast thermoplastic membrane, mechanically fastened. 39 squares to be installed. Client: Campus | Permit type: Roofing | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2001-03610 | |||||
SCORE 92 Replace forced air furnaces in units #213, 228, 229, 231, 202, 203, 128, 101, 106, 125 (80,0 btu) Client: Countryside Asset Mgmt. | Permit type: Mechanical | Permit status: N&v | Current use: Existing | Permit id: Pmt2001-05509 | |||||
SCORE 91 Signs - erection of new non-electric wall sign for inchvarsity & campus townhousesinch. Client: Campus | Permit type: Sign | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-05525 | |||||
Replace damaged cable along s. Side of marine w. Of broadway, (~ 150foot) Date: January 3, 2011 Client: Campus | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2010-05741 | |||||
1 1 2" water tap - city of boulder project; barb kenyon, project manager Date: April 1, 2003 Client: Campus | Permit type: Water | Permit status: Act | Permit id: Pmt2003-01116 | |||||
SCORE 66 Building c - installation of 6. 51 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Client: Campus | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 15, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02530 | |||||
SCORE 66 Building e-d - installation of 4. 34 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Client: Campus | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02532 | |||||
SCORE 95 Building b-a - installation of 15. 5 kw, rooftop, low-slope tilt-mounted (13-inch height above roof), grid-tied photovoltaic solar energy system on multi-family building. Client: Campus | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 21, 2015 | Current use: Multifamily dwellings, existing | Permit id: Pmt2015-02533 | |||||
Gas service renewal via directional bore unit 202 (no job #) Date: December 7, 2015 Client: Campus | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-05352 | |||||
SCORE 95 Replacement of boiler in basement mechanical room of multi-family building. Mechanical room is in the building at the ne corner of the property (marine and broadway corner). Client: Campus | Permit type: Mechanical | Permit status: Cmp | Completion date: April 13, 2017 | Current use: Multifamily dwellings, existing | Permit id: Pmt2017-01336 | |||||
SCORE 92 Install forced air furnaces in units - 112, 118, 120, 124, 129, 130, 201, 211, 212, 222 ,223 ,220 Client: & Campus | Permit type: Mechanical | Permit status: N&v | Current use: Multifamily dwellings, existing | Permit id: Pmt2000-00271 | |||||
SCORE 95 Reroof on boulder townhomes office Client: Campus | Permit type: Roofing | Permit status: Cls | Current use: Office - administrative, existing | Permit id: Pmt2002-05026 | |||||
1 1 2inch water tap - city of boulder project; barb kenyon, project manager Date: April 1, 2003 Client: Campus | Permit type: Water | Permit status: Act | Permit id: Pmt2003-01116 | |||||
SCORE 92 Signs - erection of new non-electric wall sign for inchvarsity & campus townhousesinch. Client: Campus | Permit type: Sign | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2014-05525 |