Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Set dumpster on 14th street for demolition 9 19 05 - 10 3 05. Date: September 16, 2005 Contractor: Blue Spruce Design And Const Client: Building Crystal | Applicant: Blue Spruce Design & Const | Permit type: Right-of-way | Permit status: N&v | |||||
SCORE 95 Fire sprinkler system - 2nd floor Date: June 13, 2001 Contractor: Wyco Fire Protection Inc Client: Crystal Building Llc | Applicant: Wyco Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: August 14, 2001 | Current use: Office - profes | |||||
SCORE 56 Tenant remodel Client: Crystal Building Llc | Applicant: Crystal Building Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 21, 2001 | Current use: Office - admini | |||||
SCORE 100 Scope of work letter add one new and relocate 4 sprinklers Date: December 6, 2007 Contractor: Fire Defense Inc Client: Building Crystal | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: February 8, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Install hand hole in alley next to existing ped. Access to manholes from 14th to 16th to pull fiber Date: December 2, 2008 Contractor: Qwest Comm Centurylink Client: Building Crystal | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 New fire alarm panel for cheesecake factory Date: May 5, 2009 Contractor: First Call Electric And Fire Client: Building Crystal | Applicant: First Call Electric & Fire | Permit type: Fire | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Restaurant, exi | |||||
SCORE 100 New 4inch backflow preventor Date: October 21, 2010 Contractor: Fire Defense Inc Client: Building Crystal | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: May 16, 2011 | Current use: Commercial/reta | |||||
SCORE 92 Set crane in street to remove a c unit Date: May 11, 2011 Contractor: Rms Cranes Llc Client: Building Crystal | Applicant: Rms Cranes Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Replace rooftop hvac unit with ton, 10. 3 eer unit. Scope of work includes electrical. Date: April 30, 2012 Contractor: Air Conditioning Associates Inc Client: Building Crystal | Applicant: Air Conditioning Associates Inc | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 8, 2012 | Current use: Office - profes | |||||
SCORE 95 Set up crane to hoist hvac equipment. Date: May 22, 2012 Contractor: Winslow Crane Service Co Client: Building Crystal | Applicant: Winslow Crane Service Co | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Install a mil white epdm roof over an existing dark colored epdm roof (painted white), interior to a parapet wall, existing cap metal and counter flashing to remain. No outward change of appearance to the building from ground level. 64 squares on a low pitch roof -- positive drainage required. Pre-reroof inspection required. Date: January 4, 2013 Contractor: M B Roofing Inc Client: Building Crystal | Applicant: M B Roofing, Inc. | Permit type: Roofing | Permit status: Cmp | Completion date: March 22, 2013 | Current use: Single family d | |||||
SCORE 97 Replacement of four rooftop units. Two five-ton, 17. 5 seer, one three-ton 17. 5 seer, and one four-ton, 17. 5 seer. Please refer to his2013-00039 for landmarks alteration certificate. Date: March 6, 2013 Contractor: Trane Client: Building Crystal | Applicant: Trane | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2013 | Current use: Commercial/reta | |||||
SCORE 95 Replace four existing windows on third floor of building. Scope includes strucutral redesign for square shaped windows (previously arched). Please refer to his2013-00042 for landmarks certification. Client: Building Crystal | Applicant: Blue Spruce Design & Const | Permit type: Building | Permit status: Cmp | Completion date: December 19, 2013 | Current use: Office - admini | |||||
SCORE 92 Set crane in alley Date: March 18, 2013 Contractor: Rms Cranes Llc Client: Building Crystal | Applicant: Rms Cranes Llc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 99 Conversion of existing third-story windows to sliding glass doors - will reuse existing framing - non-structural. Please refer to his2013-00304 for lac approval. Client: Building Crystal | Applicant: Tres Birds Workshop, Inc | Permit type: Building | Permit status: Cmp | Completion date: March 5, 2014 | Current use: Office - profes | |||||
SCORE 100 Fa - new notification and power supply Date: January 15, 2014 Contractor: First Call Electric And Fire Client: Building Crystal | Applicant: First Call Electric & Fire | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Office - admini | |||||
SCORE 100 Fs - tf for office area Date: January 16, 2014 Contractor: Fire Defense Inc Client: Building Crystal | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Office - admini | |||||
SCORE 56 Removal of office furniture from commerical building and loaded in alley. Work to be done 6pm - 10pm. Includes dumpster to be hauled out every night. Date: July 18, 2016 Contractor: Rubbish Works Client: Building Crystal | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-03230 | |||||
SCORE 95 Fs - sowl - pend to uprights x75 :::if spks are rel or add, sowl is null and void::: Client: Building Crystal | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2016-04493 | |||||
SCORE 82 Tenant remodel of second floor of 1401 & 1421 pearl and first and second floors at 20 14th street-building permit to restore approx. 25,0 s. F. Of space to inchwhite boxinch in preparation for leasing. Suite to remain vacant until build out of space for future tenant (by separate permit and separate review). Scope to include removal of non-load bearing partitions, restrooms, adding exit and emergency lighting and temporary lighting. Reference pmt2016-04621 for interior non-structural demo pemrit. Scope of work for the 20 14th st. Space has been reduced since public access will not be required before tenant finish work begins. Client: Building Crystal | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2016-04620 | |||||
SCORE 82 Interior non-structural demolition permit in preparation for pmt2016-04620. Scope is limited to the first & second floor of 20 14th street and the second floors of 1401 & 1421 pearl street. Reference pmt2016-046 for inchwhite boxinch permit. Date: October 4, 2016 Contractor: Bleeker Construction Llc Client: Building Crystal | Permit type: Demolition | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2016-04621 | |||||
SCORE 82 Dumpster on east side of 14th for 5 weeks. For remodel pmt2016-04620 Date: October 14, 2016 Contractor: Bleeker Construction Llc Client: Building Crystal | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2016-04796 | |||||
SCORE 100 New fire alarm panel for cheesecake factory Client: Building Crystal | Permit type: Fire | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Restaurant, existing | Permit id: Pmt2009-01481 | |||||
SCORE 100 Install a mil white epdm roof over an existing dark colored epdm roof (painted white), interior to a parapet wall, existing cap metal and counter flashing to remain. No outward change of appearance to the building from ground level. 64 squares on a low pitch roof -- positive drainage required. Pre-reroof inspection required. Client: Building Crystal | Permit type: Roofing | Permit status: Cmp | Completion date: March 22, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-00063 | |||||
SCORE 97 Replacement of four rooftop units. Two five-ton, 17. 5 seer, one three-ton 17. 5 seer, and one four-ton, 17. 5 seer. Please refer to his2013-00039 for landmarks alteration certificate. Client: Building Crystal | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2013 | Current use: Commercial/retail, existing | Permit id: Pmt2013-00977 | |||||
Tenant remodel Date: May 8, 2001 Value: $8,000 Client: Crystal Building Llc | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: September 21, 2001 | Current use: Office - administrative, tenant remodel | Permit id: Pmt2001-01775 | |||||
SCORE 95 Fire sprinkler system - 2nd floor Client: Crystal Building Llc | Permit type: Fire | Permit status: Cmp | Completion date: August 14, 2001 | Current use: Office - professional, existing | Permit id: Pmt2001-02463 | |||||
SCORE 95 Conversion of existing third-story windows to sliding glass doors - will reuse existing framing - non-structural. Please refer to his2013-00304 for lac approval. Client: Building Crystal | Permit type: Building | Permit status: Cmp | Completion date: March 5, 2014 | Current use: Office - professional, remodel | Permit id: Pmt2014-00101 | |||||
SCORE 100 Fa - new notification and power supply Client: Building Crystal | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-00199 | |||||
SCORE 95 Fs - tf for office area Client: Building Crystal | Permit type: Fire | Permit status: Cmp | Completion date: March 20, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-00218 | |||||
SCORE 99 Replace rooftop hvac unit with ton, 10. 3 eer unit. Scope of work includes electrical. Client: Building Crystal | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 8, 2012 | Current use: Office - professional, existing | Permit id: Pmt2012-02019 | |||||
SCORE 95 New 4inch backflow preventor Client: Building Crystal | Permit type: Fire | Permit status: Cmp | Completion date: May 16, 2011 | Current use: Commercial/retail, existing | Permit id: Pmt2010-04597 | |||||
Install hand hole in alley next to existing ped. Access to manholes from 14th to 16th to pull fiber Date: December 2, 2008 Client: Building Crystal | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-05243 | |||||
SCORE 95 Scope of work letter add one new and relocate 4 sprinklers Client: Building Crystal | Permit type: Fire | Permit status: Cmp | Completion date: February 8, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2007-05399 | |||||
SCORE 95 Set dumpster on 14th street for demolition 9 19 05 - 10 3 05. Contractor: Blue Spruce Design And Const Client: Building Crystal | Permit type: Right-of-way | Permit status: N&v | Permit id: Pmt2005-03623 | |||||
SCORE 82 Suite 400: permit to remove interior non-load bearing partitions, millwork, and finishes to restore existing office suite to a inchwhite boxinch state for marketing space to future tenants. Scope will include installation of new exit signs with em packs, new temporary lighting, new paint, grinding and sealing of floors. Energy code (cobecc), accessibility, and mep upgrades to be addressed under future tenant finish. No occupancy until completion of future tenant finish. Client: Crystal Building Llc | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2017-02491 | |||||
SCORE 82 Interior demo placing dumpster in the row Date: October 3, 2017 Contractor: Bleeker Construction Llc Client: Building Crystal | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-04219 |