Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Cogdill used mh Date: May 22, 2012 Permit status: Closed | Permit id: 12-01534 | |||||
SCORE 98 Cogdill used mh Client: Cogdill Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01534 | Parcel: 22177 | |||||
SCORE 100 Cogdill used mh Client: Cogdill Used Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 12-01534 | Parcel: 22177 | |||||
March 22, 2012 11:28:27 am kneel. Cogdill - used mh to lot. Location: new leicester hwy to l on old county home rd to glimmer.; may 22, 2012 10:30:59 am heatherr. Cogdill - used mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommen Permit type: Permits - historical | Permit status: Closed | Permit id: 12-01534 | Parcel: 22177 | |||||
Cogdill used mh Date: May 22, 2012 Value: $8,000 Permit type: Historical | Permit status: Closed | Permit id: 12-01534 | |||||
March 22, 2012 11:28:27 am kneel. Cogdill - used mh to lot. Location: new leicester hwy to l on old county home rd to glimmer.; may 22, 2012 10:30:59 am heatherr. Cogdill - used mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommen Date: May 22, 2012 Permit type: Permits - historical | Permit status: Closed | Permit id: 12-01534 | Parcel: 22177 |