Wellington estates Date: March 6, 2013 Permit status: Closed | Permit id: 13-00470 | |||||
SCORE 95 Wellington estates Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00470 | Parcel: 5844 | |||||
SCORE 100 Wellington estates Client: Wellington Estates | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 13-00470 | Parcel: 5844 | |||||
January 22, 2013 4:51:43 pm rhurley. Received application via fax for placement of used dw mfh in wellington estates; called applicant about msd application-stated that it was a private sewer system;rlh; march 5, 2013 4:43:18 pm alishac. Premise number: redacted phone number2. Adc.; march 6, 2013 4:16:14 pm ssalyer. Sls called in premise to progress;sls; march 6, 2013 4:15:55 pm ssalyer. Placement of used dw mfh in wellington estates; sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00470 | Parcel: 5844 | |||||
Wellington estates Date: March 6, 2013 Value: $3,725 Permit type: Historical | Permit status: Closed | Permit id: 13-00470 | |||||
January 22, 2013 4:51:43 pm rhurley. Received application via fax for placement of used dw mfh in wellington estates; called applicant about msd application-stated that it was a private sewer system;rlh; march 5, 2013 4:43:18 pm alishac. Premise number: redacted phone number2. Adc.; march 6, 2013 4:16:14 pm ssalyer. Sls called in premise to progress;sls; march 6, 2013 4:15:55 pm ssalyer. Placement of used dw mfh in wellington estates; sls; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid Date: March 6, 2013 Permit type: Permits - historical | Permit status: Closed | Permit id: 13-00470 | Parcel: 5844 |