Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Wellington mhp Date: September 3, 2013 Permit status: Closed | Permit id: 12-03276 | |||||
SCORE 100 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 12-03276 | Parcel: 1789328 | |||||
SCORE 88 Wellington mhp Client: Wellington Mhp | Permit type: Res: mfg. Home | Permit status: Closed | Current use: Residential | Permit id: 12-03276 | Parcel: 1789328 | |||||
June 12, 2012 9:45:55 am kneel. Wellington mhp - used mh to lot, master zoning approval 09-6160.; july 10, 2012 11:00:56 am kneel. Wellington mhp - used mh to lot, master zoning approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is r Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 12-03276 | Parcel: 1789328 | |||||
Wellington mhp Date: September 3, 2013 Value: $8,000 Permit type: Residential | Permit status: Closed | Permit id: 12-03276 | |||||
June 12, 2012 9:45:55 am kneel. Wellington mhp - used mh to lot, master zoning approval 09-6160.; july 10, 2012 11:00:56 am kneel. Wellington mhp - used mh to lot, master zoning approval 09-6160.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is r Date: September 3, 2013 Permit type: Res: mfg. Home | Permit status: Closed | Permit id: 12-03276 | Parcel: 1789328 |