Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
17000-01040: revision addition of 12" topping slab, addition of ramp and steps to provide accesible path of travel. Changes to mep. Relocation of exterior door at prep kitchen to be submitted under shell permit. Date: August 31, 2017 Permit status: Completed | Permit id: 17rev-00556 | |||||
SCORE 100 14-1066: revised plans for trash enclosure includes expansion structure associated new electric hot water and bib. Date: March 3, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00132 | |||||
SCORE 100 14000-01066: deferred submittal for stair #1, #2, rails only, stairs #5 and #6 building 2 Date: March 23, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00182 | |||||
SCORE 93 Ti and u&o for tenant "machine zone" to occupy the entire 50,311 sf two story building (building # 2). No exterior work, no landscaping Permit status: Permit issued | Permit id: 17000-00536 | |||||
SCORE 100 14000-001066: deffered submital for exterior glass. No change to appearance. Date: November 30, 2016 Contractor: Devcon Construction Incorporated Permit status: In plan check | Permit id: 16rev-00746 | |||||
SCORE 93 Building 2: cafe build out (16,387 sf) on the first floor for "machine zone". U&o submitted for the cafe build out. Scope of work includes new rooftop equipment. All utility demand reviewed under the shell permit. Permit status: Permit issued | Permit id: 17000-01040 | |||||
SCORE 100 14000-01066: deferred submittal stair #3 building 2 Date: May 15, 2017 Contractor: Devcon Construction Incorporated Permit status: Permit issued | Permit id: 17rev-00284 | |||||
17000-01040: revision to floor drains, sinks, sizing, add charging stations on the back patio Date: October 10, 2017 Permit status: Completed | Permit id: 17rev-00644 | |||||
SCORE 100 14000-01066: deferred submittal for metal stud framing Date: March 23, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00181 | |||||
14000-01066: revision to water closets to allow for ambulatory stall. Date: June 19, 2017 Permit status: Permit issued | Permit id: 17rev-00354 | |||||
14000-01066: building #2 revision includes bathroom finishes and lighting (all bathrooms) Date: June 28, 2017 Permit status: Permit issued | Permit id: 17rev-00387 | |||||
14000-01066: building #2 revision includes (n) vent from grease trap interceptor (trap also referenced in 17rev-00385) and pump below grade at trash enclosure Date: June 28, 2017 Permit status: Completed | Permit id: 17rev-00386 | |||||
SCORE 100 14-1066: deferred building #2 stair #4 Date: August 4, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00482 | |||||
SCORE 100 14-1066: deferred building #2 balcony and guardrails. Date: August 4, 2017 Contractor: Devcon Construction Incorporated Permit status: Completed | Permit id: 17rev-00483 | |||||
SCORE 100 Building 2: 46,514 sq ft foundation and basement garage for future 2 story office building. Above grade portion of structure reviewed under 15rev-00754 Permit status: Permit issued | Permit id: 14000-01066 |