Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Fix the existing stairs with new hand rails. Remove the ceiling in the family room & replace the existing beam with a new lvl beam. Move the laundry from the second to the third floor. Remodel the existing bathroom on the third floor. Add new wiring. Prim Permit type: Building | Permit status: Issued | Expiration date: November 4, 2017 | Permit id: B17-000190 | |||||
SCORE 56 Install new hvac system with ducting, sealed and insulated, Permit type: Sheet metal | Permit status: Issued | Expiration date: October 11, 2017 | Permit id: Sm17-000075 | |||||
SCORE 90 Remodel second floor living room, change out sup panel, remodel third floor bathroom, and wire for new ac system Permit type: Electrical | Permit status: Issued | Expiration date: December 19, 2017 | Permit id: E17-000580 | |||||
SCORE 89 Update bathroom group add laundry Permit type: Plumbing | Permit status: Issued | Expiration date: October 18, 2017 | Permit id: P17-000398 | |||||
SCORE 89 New laundry and hvac Permit type: Gas | Permit status: Issued | Expiration date: October 18, 2017 | Permit id: G17-000333 |