Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Obstruction location: activity permitted: pole replacement of vt 127, 3 off roadway vehicles crossing bike path for access reinstall fence & any danaged greenbelt areas as needed traffic control during equipment delivery ![]() ![]() Permit type: Obstruction permit | Permit status: Closed | Permit id: 10-120524 | Parcel: 0203029000 | |||||
Amend zoning permit # 03-247 / coa # 03-022; construction of a new three-span bridge over the winooski river to colchester. The project will not include the cantilevered portion of span two. ![]() Permit type: Zoning permit - coa level ii | Permit status: Permit indeterminate 3 | Permit id: 04-081 | Parcel: 0203029000 | |||||
SCORE 99 Construction of a 12 wide, 3-span, prefabricated bike and pedestrian bridge over the mouth of the winooski river to colchester. This project is within the r. O. W. Of the burlington bike path. ![]() ![]() Permit type: Zoning permit - coa level ii | Permit status: Permit indeterminate 3 | Permit id: 03-247 | Parcel: 0203029000 | |||||
SCORE 99 Final plat approval to construct two 18 unit residential structures, each with under building parking (36 units total). ![]() ![]() Permit type: Zoning permit - coa level iii | Permit status: Permit indeterminate 3 | Permit id: 99-633 | Parcel: 0212070000 | |||||
SCORE 98 Preliminary plat to construct two structures with 18 units each (36 total) with under-building parking on the existing vacant lot. ![]() ![]() Permit type: Zoning permit - coa level iii | Permit status: Review complete | Permit id: 99-320 | Parcel: 0212070000 | |||||
SCORE 87 Preliminary plat approval to construct elderly units in three detached structures (with underground parking in each). ![]() ![]() Permit type: Zoning permit - coa level iii | Permit status: Request denied | Permit id: 97-602 | Parcel: 0212070000 | |||||
SCORE 74 Extension of zoning permit time limit for final plat approval to construct 38 residential units in 3 buildings, from march 8, 1993 to march 8, 1995. All aspects of the project remain the same, including all conditions of approval orginally dated 3/8/90. ![]() ![]() Permit type: Zoning permit - coa level iii | Permit status: Permit indeterminate 3 | Permit id: 93-349 | Parcel: 0212070000 | |||||
SCORE 74 Extension of zoning permit time limit for final plat approval for construction of 38 residential units in three buildings, from march 8, 1992 to march 8, 1993. All aspects of the project remain the same, including all conditions of approval orginally dated ![]() ![]() Permit type: Zoning permit - coa level iii | Permit status: Permit indeterminate 3 | Permit id: 92-250 | Parcel: 0212070000 | |||||
SCORE 59 Repair camp and trailer to maintain habitability ![]() ![]() Permit type: Building permit | Permit status: Issued | Permit id: 30858 | Parcel: 0211003000 | |||||
Enlarge second fl. Dormer ![]() Permit type: Building permit | Permit status: Issued | Permit id: 27361 | Parcel: 0203029000 | |||||
Historic permit ![]() ![]() Client: John A Shappy Ii | Permit type: Building permit | Permit status: Issued | Current use: Historic permit | Permit id: 95-024718 | |||||
SCORE 59 Historic permit Client: Edware Robear | Permit type: Building permit | Permit status: Issued | Current use: Historic permit | Permit id: 97-025950 |